It’s been mentioned a few times at work although not sure how high up on the priority list it is for the airport with all the terminal works currently taking place. However, the removal of the old Airside Ops office and baggage belt 3 building makes up the area for stand 4. Stand 5 currently has a two-way road that runs between stand 5 and 6 and then goes behind 5 all the way to the western end of the airport, past the Jet2 baggage hall until it turns right towards the fire station and the head of stand 1. I’m assuming this two-way road will be converted into the ends of stands 5 and 4 pushing back directly onto alpha taxiway and a new road will run at the head of these stands joining on from the head of stand 6Line to know how they will accomplish that, as it I’ll be tight squeeze for a A320/B738 sized aircraft.
Surely they would be more suited for aircraft types like the ATR42/72, Dash 8, Embraer 175/190 or Boeing 737-300?
