I believe Filton Bank four-tracking is still going ahead.
I think we currently don't know if electrification of these sections is going to be axed completely (as you seem to imply) or if it simply gets pushed into the next Network Rail control period (CP6). We'll hopefully find out in a few months time. They're way behind the schedule with these works anyway, so from the looks of it and other outstanding work around Temple Meads there's not much chance of them finishing all that in CP5 anyway, and as I understand it resignaling has to be done before any electrification works.
I find it hard to believe that electrification of these sections is going to be axed completely, even more so after they've already done a lot of very expensive and intrusive work on track clearances on the Bath route (yes I know the saying about sunk costs). The economic rationale for electrification still exists even with bi-mode trains in the picture.
Hopefully the reason that no alternative dates have been given yet for completion of these sections is just that they're still dealing with the disaster that is the current CP and leaving details of the next one until later. Fingers crossed.
I think we currently don't know if electrification of these sections is going to be axed completely (as you seem to imply) or if it simply gets pushed into the next Network Rail control period (CP6). We'll hopefully find out in a few months time. They're way behind the schedule with these works anyway, so from the looks of it and other outstanding work around Temple Meads there's not much chance of them finishing all that in CP5 anyway, and as I understand it resignaling has to be done before any electrification works.
I find it hard to believe that electrification of these sections is going to be axed completely, even more so after they've already done a lot of very expensive and intrusive work on track clearances on the Bath route (yes I know the saying about sunk costs). The economic rationale for electrification still exists even with bi-mode trains in the picture.
Hopefully the reason that no alternative dates have been given yet for completion of these sections is just that they're still dealing with the disaster that is the current CP and leaving details of the next one until later. Fingers crossed.