• Admin
£150m pledged to deliver vital upgrades at Gatwick Airport station
13781

  • Government announces £150 million investment to upgrade Gatwick Airport train station
  • Holidaymakers and commuters to benefit from a larger concourse, five new lifts and eight new escalators
  • Improvements set to reduce train delays and provide easier connections across the south east
Tens of millions of rail passengers travelling to and from Gatwick Airport will benefit from improved accessibility and swifter journeys, after the Department for Transport (DfT) announced a £150 million scheme to upgrade the station.

The renovation will reduce train delays caused by platform overcrowding and congestion, while also improving passenger experience by providing easier connections to other destinations.

Planned upgrades will include doubling the size of the station concourse, adding five new lifts and eight escalators to improve passenger flow, and widening two platforms to reduce overcrowding.

Transport Secretary Chris Grayling said: “With 46m people now using Gatwick Airport every year and 20m coming by train, it is vital that we make the station more accessible and customer friendly for those travelling through it. The UK’s second largest airport has direct rail links to more than 120 destinations and is an important public transport hub.

“We want to see Gatwick Airport’s success continue to flourish and ensure that it is ready for even more passengers in the future. Through this £150 million investment, we will deliver vital upgrades to boost the station’s capacity and provide better, seamless journeys for all."

Stewart Wingate, Chief Executive Officer, Gatwick Airport said: “Gatwick has been transformed in recent years and the redesigned train station will take the airport’s redevelopment to the next level by providing a seamless transition between the airport and the station, more lifts, escalators and a doubling in the size of the concourse.

“The new station will complement the huge improvements to rail services at the airport, which include new fleets of Gatwick Express and Thameslink trains and services that now leave the airport for London every three minutes – as frequently as services on the tube.

“The project is a fantastic example of the public and private sector working together to deliver a world-class transport hub that will comfortably manage the expected growth in air passengers and also encourage people to switch to rail as part of our push to get more people to travel to the airport by public transport.”
The number of people using Gatwick Airport station each year has grown by six million since 2010. Currently the station is not designed for the high volume of daily passengers, often carrying bulky luggage.

The renovation will be managed by Network Rail, in partnership with DfT. Gatwick Airport Ltd and Coast to Capital Local Enterprise Partnership are co-funding the project with £37m and £10m respectively.

Paul Harwood, Director of Investment for Network Rail, said: “The transformational enhancement to Gatwick Airport station will provide passengers with a much smoother and more pleasant experience and also reduce train delays.

“Along with the recent improvements on the Brighton Main Line and our record £4.3 billion funding settlement for maintaining, operating and renewing the railway over the next five years, this investment is excellent news for passengers, businesses and the economy.”

Patrick Verwer, Chief Executive Officer of Govia Thameslink Railway, said: “This much-needed scheme will deliver real benefits for passengers thanks to enhanced platforms, new lifts and a larger concourse. At such a busy station these upgraded facilities will significantly contribute to the smooth running of our services for travellers getting to and from the airport.”

Jonathan Sharrock, Chief Executive at Coast to Capital said: “If our economy is to grow, we need a transport network that supports faster, more reliable, and less polluting journeys for business, leisure and freight travel. Gatwick airport is an international destination and its station is a gateway to London and the wider Coast to Capital area.

“This plan will greatly improve the interchange for commuters, visitors and business which will support the sustainable growth of the area with Gatwick airport at its heart. “We are delighted to have contributed £10 million and look forward to working with partners to deliver a better experience for passengers.” The improvement works will start in Spring 2020 and will take around two years to complete. The works will be sequenced to ensure minimum disruption. The government is investing a record £48bn to modernise the country’s rail network and deliver significant improvements in performance, punctuality and capacity.
 
OK we can dream up north
We can dream in the South West too - for something remotely approaching HS2. What are electrified railways anyway? Bristol and 99% of the South West (the government's largest English region by area) has to rely on diesel power for an unknown period ahead - nothing in the pipeline to replace diesel traction.

Still waiting for the government/Network Rail to find £100 million to revamp the South West's major station at Bristol Temple Meads. Yet the government can find £150 million to upgrade LGW's railway station.

It's certainly not a North-South divide. It might be a South East-Rest of UK divide.
 

Upload Media

Remove Advertisements

Subscribe to help support your favourite forum and in return we'll remove all our advertisements. Your contribution will help to pay for things like site maintenance, domain name renewals and annual server charges.



Forums4aiports
Subscribe

NEW - Profile Posts

If anyone would like to share their local airport news right here in our news area let me know so I can give you the correct permissions to do so. It only takes a couple of minutes to upload a news story with an accompanying image. The news items can then be shared on the site homepage by you. #TakePart #Forums4airports Bring the news to one place!
survived a redundancy scenario where I work for the 3rd time. Now it looks likely I will get to cover work for 2 other teams.. Pretty please for a payrise? That would be a no and so stay on the min wage.
Live in Market Bosworth and take each day as it comes......
Well it looks like I'm off to Australia and New Zealand next year! Booked with BA from Manchester via Heathrow with a stop in Singapore and returning with Air New Zealand and BA via LAX to Heathrow. Will circumnavigate the globe and be my first trans-Pacific flight. First long haul flight with BA as well and of course Air NZ.
15 years at the same company was reached the weekend before last. Not sure how they will mark the occasion apart from the compulsory payirse to minimum wage (1st rise for 2 years; i was 15% above it back then!)
Ashley.S. wrote on Sotonsean's profile.
Welcome to the forum, I was born and bred in Southampton.

Trending Hashtags

Advertisement

Back
Top Bottom
  AdBlock Detected
Sure, ad-blocking software does a great job at blocking ads, but it also blocks some useful and important features of our website. For the best possible site experience please take a moment to disable your AdBlocker.