Dual runway operating hours

Scottie Dog

Moderator
Staff member
Subscriber
Sep 7, 2016
2,741
310
70
Warrington
  • Thread starter
  • Moderator
  • #1
Rather than getting the details lost in the NOTAM/OAN thread I have opened a separate thread to cover the seasonal operating hours. This thread will be updated as an when new information becomes available,

OAN 112-2019 – RUNWAY 2 WINTER OPERATING HOURS 2019/20
OAN REF:- 112/2019 DATE OF ISSUE:- 25/10/19 EFFECTIVE DATE:- 01/11/19
EXPIRY DATE:- 31/03/2020
1.0 SUMMARY
1.1 During the winter period, dual-runway operating hours will operate based on seasonal demand.
2.0 PROGRAMME
2.1 Standard dual-runway operating hours will be altered in line with demand for the 2019/20 winter season. All times quoted in this Operational Advice Notice are local.
3.0 STANDARD RUNWAY OPERATING HOURS (Monday to Friday Inclusive)
3.1 Runway 05L/23R and 05R/23L will be in operation between 06:30hrs - 10:30hrs and 16:00hrs – 20:00hrs. Runway 05L/23R will be in operation as a single runway at all other times unless traffic demands both runways to be operational.
3.2 SATURDAY STANDARD RUNWAY OPERATING HOURS
3.2.1 Runway 05L/23R and 05R/23L will be in operation between 06:30hrs - 10:30hrs. Runway 05L/23R will be in operation as a single runway at all other times unless traffic demands both runways to be operational.
3.3 SUNDAY STANDARD RUNWAY OPERATING HOURS
3.3.1 Runway 05L/23R and 05R/23L will be in operation between 16:00hrs – 20:00hrs.
Runway 05L/23R will be in operation as a single runway at all other times unless traffic demands both runways to be operational.

OAN 118-2019 – CHRISTMAS AND NEW YEAR RUNWAY OPERATING HOURS (WINTER 2019/20)
OAN REF:- 118/2019 DATE OF ISSUE:- 31/10/2019 EFFECTIVE DATE:- 24/12/2019 EXPIRY DATE:- 01/01/2020
1.0 SUMMARY
1.1 During the Christmas period, dual-runway operating hours will operate based on seasonal demand.
2.0 PROGRAMME
2.1 Standard dual-runway operating hours will be altered on Tuesday 24th December, Wednesday 25th December and Tuesday 31st December 2019 in line with demand for the Christmas and New Year season.
3.0 STANDARD RUNWAY OPERATING HOURS (Monday to Friday Inclusive)
3.1 Runway 05L/23R and 05R/23L will be in operation between 06:30hrs - 10:30hrs and 16:00hrs – 20:00hrs. Runway 05L/23R will be in operation as a single runway at all other times. All times quoted in this Operational Advice Notice are local.
3.2 Tuesday 24th December 2019
3.2.1 Standard dual-runway operating hours will be in adhered to, but if demand levels reduce, 05R/23L may be closed on the authority of the ATC Watch Manager and the Airfield Duty Manager, resulting in a single runway operation.
3.3 Wednesday 25th December 2019
3.3.1 Single runway operations will be in place on Christmas day due to the anticipated reduced demand levels.
3.4 Tuesday 31st December 2019
3.4.1 Standard dual-runway operating hours will be in adhered to, but if demand levels reduce, 05R/23L may be closed on the authority of the ATC Watch Manager and the Airfield Duty Manager, resulting in a single runway operation.
 

Advertisement


Scottie Dog

Moderator
Staff member
Subscriber
Sep 7, 2016
2,741
310
70
Warrington
  • Thread starter
  • Moderator
  • #2
Whilst no OAN or NOTAM has been issued I have read reports that R2 (23L/05R) will be withdrawn from use in the near future due to the lack of movements.

As soon as any firm information is available I'll update this page.
 

Scottie Dog

Moderator
Staff member
Subscriber
Sep 7, 2016
2,741
310
70
Warrington
  • Thread starter
  • Moderator
  • #6
I'm not certain whether it would be available for parking if you read the full wording of the OAN.


OAN 032/2020 - Runway Operating Hours
OAN REF:- 032/2020 DATE OF ISSUE:- 23/03/2020 EFFECTIVE DATE:- 23/03/2020 EXPIRY DATE:- UFN
1.0 SUMMARY
1.1 Effective immediately, 05R/23L will be closed for all arriving and departing traffic. 05L/23R remains available for all arriving and departing traffic.
2.0 REQUESTS TO USE 05R/23L
2.1 Any ad-hoc requests to utilise 05R/23L during this period will be subject to available resource and demand are not guaranteed. Requests are to be made to ATC or the ADM at the earliest opportunity for review and approval. Failure to provide reasonable notice ahead of any request may result in a delay.
3.0 MONTHLY RUNWAY CLOSURES
3.1 Effective immediately, all future planned monthly runway closures are cancelled. This is subject to review.
4.0 ADDITIONAL INFORMATION
4.1 This OAN is subject to continual review.
 

Scottie Dog

Moderator
Staff member
Subscriber
Sep 7, 2016
2,741
310
70
Warrington
  • Thread starter
  • Moderator
  • #7
NOTAM effective today until 2350Z on 20th August

Q) EGTT/QMRLC/IV/NBO/A/000/999/5321N00217W005
B) FROM: 20/07/28 08:33C) TO: 20/08/25 23:59
E) RWY 05R/23L CLOSED DUE WIP
 

Advertisement


Top Bottom