- Moderator
- #3,981
It’s worth pointing out the Airport was always planning to fully resurface the concrete runway with asphalt within the next 5-10 years period. AENA would have fully known this when they were doing due-diligence.
Hopefully it may help with Aircraft performance a little bit.
Hopefully it may help with Aircraft performance a little bit.
