It's definately going according to the latest meeting my colleagues attended.
The addendum people are seeing that makes it look like Pier C is staying is an amended connection to pier B from the end of pier 4. Rather than a long 'sweep', they are using this new format to add some offices/toilets and utility areas.
Another recurrent gripe I read in various places is that the terminal project is only going to deliver 1 extra stand. This of course is not true. It will be completed in phases. The first phase plans were released, although subject to change, and this will deliver 1 extra stand. On completion of the whole project there will be plenty more. Or at least the scope to provide them if needed in the economic circumstances prevailing.
Ethanegcc...where to begin lol. The airport management is far more aware of what capacity is needed than some bloke turning up to take photos of planes. Airports have a known stand capacity which they can't exceed in the same way as they have a runway capacity. The airport have never turned away operators based on the airport being full. Nor will they ever.
It goes unnoticed on these boards the small improvements that occur ongoing eg stand realignments and the way transatlantics are now staggered through the morning and into the afternoon when not too long ago all departures were between 9am and 11am.
If needed the viewing park could very quickly be concreted. It's not needed and that's why it isn't. The Virgin flight will have either been early or requested a particular stand. In rare situations there could be a problem with the departure aircraft blocking a stand because of some issue or other. Airbridges are paid for so often sit unused while aircraft operate remotely.
There are a lot of posts about the airport being full at peak periods. This is exactly as it should be and shows the capacity is being well managed. Some people seem to think a full airport is a problem???? If the economy turns, which history shows it will, the apron will look a very baron place.
Another recurrent gripe I read in various places is that the terminal project is only going to deliver 1 extra stand. This of course is not true. It will be completed in phases. The first phase plans were released, although subject to change, and this will deliver 1 extra stand. On completion of the whole project there will be plenty more. Or at least the scope to provide them if needed in the economic circumstances prevailing.