Also, does anyone have the planning application reference for that, can't seem to find it.
The planning reference for the application rejected earlier this year is 18/P/5118/OUT
The summary of the application seems to make no mention of a PTI (see below) which would suggest that today they are either relying on the outline planning permission already granted or it is a new application.
Outline planning application (with reserved matters details for some elements included and some elements reserved for subsequent approval) for the development of Bristol Airport to enable a throughput of 12 million terminal passengers in any 12 month calendar period, comprising: 2no. extensions to the terminal building and canopies over the forecourt of the main terminal building; erection of new east walkway and pier with vertical circulation cores and pre-board zones; 5m high acoustic timber fence; construction of a new service yard directly north of the western walkway; erection of a multi-storey car park north west of the terminal building with five levels providing approximately 2,150 spaces; enhancement to the internal road system including gyratory road with internal surface car parking and layout changes; enhancements to airside infrastructure including construction of new eastern taxiway link and taxiway widening (and fillets) to the southern edge of Taxiway GOLF; the year-round use of the existing Silver Zone car park extension (Phase 1) with associated permanent (fixed) lighting and CCTV; extension to the Silver Zone car park to provide approximately 2,700 spaces (Phase 2); the provision of on-site renewable energy generation; improvements to the A38; operating within a rolling annualised cap of 4,000 night flights between the hours of 23:30 and 06:00 with no seasonal restrictions; revision to the operation of Stands 38 and 39; and landscaping and associated works.
What I'd not spotted before is that the target date for the determination of the application subsequently rejected was April 2019. It was determined in February 2020. Had the original date been met the NSC would have been Conservative-controlled and would probably have approved the application.