It's coming along. Bridge and transport hub on top of the MSCP are now in place:

Sorry for the poor quality shot, was through the window of the airport flyer bus.
This article from March also has some pictures that show the scale of it: https://www.constructionnews.co.uk/project-reports/transforming-a-transport-hub-20-03-2025/
Scheduled to open in "Summer 2025" apparently; so by end of September, which seems possible.
I also read an announcement last week that the (landside) M&S will soon be closing and move from the terminal into larger premises at the transport hub, which will be a fantastic facility to have there, especially if it's open 24/7.

Sorry for the poor quality shot, was through the window of the airport flyer bus.
This article from March also has some pictures that show the scale of it: https://www.constructionnews.co.uk/project-reports/transforming-a-transport-hub-20-03-2025/
Scheduled to open in "Summer 2025" apparently; so by end of September, which seems possible.
I also read an announcement last week that the (landside) M&S will soon be closing and move from the terminal into larger premises at the transport hub, which will be a fantastic facility to have there, especially if it's open 24/7.