I've had another read through the 2019 Masterplan and it doesn't actually state the capacity of the current terminal. I'm pretty sure the previous 2006 masterplan did. I'm sure it was around the 3m capacity mark. I've searched the internet and can't find the 2006 in circulation anywhereAs far as I know there is no planning cap on passenger numbers through CWL but does anyone know the realistic maximum through the current facilities? I had an idea there was talk of a new terminal or at least an upgrade of the existing one when passenger numbers reached a certain level but I can't recall the detail.