The only reference to the bussing lounge in the master plan that I could find is:
"There are currently two bussing lounges in the North terminal with a total of 12 gates and two individual bussing gates in the South terminal.
As part of the check-in reconfiguration in the North and South terminals, space will be freed up in the south pier to develop a new bussing lounge facility to serve the re-configured stands."
That would suggest the new bussing lounge would be located within the South Pier itself rather than an extension on the end of the pier - and looking at Appendix B of the master plan it is
in the South Pier with a "terminal extension" to the South of the pier
as well. It's not that we're getting this "queueing area" rather than the bussing lounge. They're two completely different things! The new bussing lounge can't be started until the check in area has been re-configured which also hasn't started yet.
On the other hand, since before the pandemic I believe we've gone from 4 based Ryanair aircraft to 6 with potentially another one from next Summer which is also when we're getting 3 based easyJet aircraft which could grow to 5 in the future. That's an additional 6-8 based aircraft. The new queueing area maximises the use of the newly reconfigured stands and allows those new based aircraft and airlines to grow.
By all means view things through a negative lens, but on the other hand since the master plan was produced in 2018, we've had:
- Thomas Cook and Flybe collapse, collectively accounting for 23.4% of BHXs passenger throughput
- A global pandemic that practically shut down aviation for several years, costing airports and airlines £bns
- A government requirement to update security
- Soaring inflation with little to no growth in the general economy
- 2 wars in the far Eastern areas of Europe
- The 2nd largest LCC in Europe opening a base at the airport
To criticise the airport for not continuing with projects that were planned over 5 years ago ignores all that has happened in those 5 years and any business that ignored what has happened likely wouldn't stay in business for long.
Simply put, priorities have changed and the airport only has a finite budget available per year. That is currently being spent on the security reconfiguration and the stand reconfiguration around the South Terminal - the latter of which
WAS in the master plan. Both of these will be completed by next summer, freeing up capital to be spent from next winter on other projects - lets see what those are.