- Moderator
- #841
a new terminal could be built over at HS2 with passengers catching a shuttle/people mover to the current airport where they'd board their flight. Demolishing the existing terminal could make way for much more stands.
The last I heard this was pretty much the plan although the new terminal would contain the land side facilities, check in, bag drop etc, then a people mover would take passengers to the current site which could effectively become totally air side. With a little reconfiguration and some expansion south into the car parks there is room for plenty of new stands.
This was a while ago though so it may well have changed since then.
In time if even more capacity is needed, a new runway could then be built over by HS2, and the new terminal extended to be able to handle these flights.
There is the potential for a new runway, or two, at the HS2 site possibly with an eventual move of the whole airport. Developments such as Arden Cross come into the equation and whether there is scope to earmark land specifically for airport development which may not happen for another 20 years or so.
There is so much to take into account with this one that I'm not surprised it has been delayed. It's a once in a generation opportunity and it needs to be done right.
As Mr Kehoe said, it depends how bold they want to go.

