I've been doing a bit of 'dangerous' thinking and also wondered about T1. If in the plans T1 was to be demolished then there is a large slice of empty ground space.
We know that Pier C is basically being retained and I think that Pier B was to be retained. So if T1 goes then Pier B has to be served by corridor from either T2 or T3. Should BA really be interested in seriously developing from Manchester then maybe, just maybe, something could be done with a T1 reconfiguration - especially over the period before TP becomes a reality?
Any thoughts
We know that Pier C is basically being retained and I think that Pier B was to be retained. So if T1 goes then Pier B has to be served by corridor from either T2 or T3. Should BA really be interested in seriously developing from Manchester then maybe, just maybe, something could be done with a T1 reconfiguration - especially over the period before TP becomes a reality?