i thought I would start this thread, because, while there is much discussion and excitement at the range of new flights, but, something far more exciting and significant is starting this year, and deserves its own thread.
basically, Manchester airport, from October this year, is going to be one huge construction site.
Yes, there is going to be much disruption, and the next few years will see it's fair share of bad reviews and disgruntled passengers, as building work rarely moves slowly.
So, what's happening?
Firstly, and probably most notably, is the Terminal 2 re-development. This will see the complete transformation of the airport experience.
Work on this is starting next month, however, it will be October time before anything 'noticeable' starts happening. The works will see an enlarged check in area, with many advances such as self service check in desks, multi-lingual adverts/signs using LCD technology, US pre-clearance, more lounges and of course the finger piers to add more contact stands.
The work taking place so far is removing the car park on the apron stands, some survey work and utilities. Staff west, the main car park beyond the apron is set to be removed soon, and the airport perimeter moved to make more apron space.
This will probably be the project that takes up most of the interest, but, it's not the only thing happening.
The other projects are airport city north, airport city south (logistics) and the potential HS2 station to the east of the site.
Airport city south is well advanced already. DHL has been on site for a few months now. Manchester did see a brief series of B757 flights, however, they were short lived as the warehouse was only running at 20% capacity and therefore not supplying enough work for the flights. Word is, the flights will be back once the site hits 60% capacity, which is supposedly happening in November.
The other tenants are Amazon, who are fitting out their HUGE warehouse as I type, and is said to also bring in direct freight flights to the USA to supply the site. Alpha is the other tenant on site. According to news reports, there are other tenants lined up for the logistics hub, with apparently one firm looking to take over the rest of the whole site. No idea who that is, but, that's a huge land requirement so will be interesting to see.
Airport city North. This will finally break ground in October and again add to the building site feel. The first bit of the project will be hotels and offices in the space near the rail station and 'Voyager' building (Voyager is Etihads European HQ and contact centre).
There has been a lot of work re-locating some of the car parks and vegetation, and the expansion of the motorway junction in front of T2 will be the next bits to be done in tandem with the offices behind voyager.
The last bit will be the HS2 station, which will be adjacent to the M56 and have a tram link to the terminals. This is a 'back burner' project dependent on the actual HS2 project, so, will only be updated if anything needs to be updated.
I will try and get some images onto the thread soon, and of course, will use this thread to update on the works, but, this is going to be a huge project so will be sure to get lots of updates.