Just had a look at NOTAMs and the 'no div' instruction has vanished but there's this:

A1380/19 NOTAMN Q) EGTT/QMPXX/IV/BO /A /000/999/5321N00217W005 A) EGCC B) 1905101513 C) 1906102359 E) PILOTS BE ADVISED TO EXERCISE CAUTION WHEN MANOEUVRING AND PARKING ONTO STANDS 103 TO 112 AS SURFACE MAY BE SLIPPERY WHEN WET

Someone will be 'Livin' On a Prayer' about that as they maybe 'Wanted Dead or Alive' 😎
 
Just for the sake of completeness I'm posting the following OAN

OAN 45/2019 – OVERNIGHT NORTHSIDE PAVEMENT REPAIRS
OAN REF:‐ 45/2019 DATE OF ISSUE:‐ 08/05/19 EFFECTIVE DATE:‐ 12/05/19 N/A EXPIRY DATE:‐ 30/05/19
1.0 SUMMARY
A three week programme of work to complete essential airfield pavement repairs on several northside taxiways. The work will require localised, overnight taxiway closures, and in some instances, there will be a requirement for night‐stopping aircraft to be parked on stands before pavement repair work takes place. Additionally, there will be occasions when night‐time aircraft access onto the Western Maintenance Area is restricted.
2.0 PROGRAMME
2.1 The overall programme of work will commence on the night of Sunday 12th May 2019.
2.2 The work is scheduled to be completed by the morning of Thursday 30th May 2019.
2.3 Overall, the work will take place Sunday to Thursday nights (inclusive), with nightly working hours of 22:30 – 06:00L.
3.0 SCOPE & LOCATION OF WORKS
3.1 The required working locations will be as follows;
 12/05/19 – 20/05/19 ‐ Taxiway Delta between Intermediate Holding Point (IHP) D5 and junction with Western Maintenance Area and IHP D4.
 20/05/19 – Taxiway Lima (various points along the taxiway).
 21/05/19 – 28/05/19 – Taxiway Delta between IHPs D6 and D7 and junction with Taxiway Romeo.
 29/05/19 – Taxiway Juliet‐Echo (various point ts along the taxiway) and Taxiway Bravo in the vicinity of IHP B5.
3.2 The scope of work will involve a variety of repair and maintenance tasks including;
 Maxicrete repairs.
 PQX pavement bay replacements.
 Sealing of pavement cracks.
 Pavement joint sealing.
4.0 OPERATIONAL IMPLICATIONS
4.1 Taxiway Closures 4.1.1 The following schedule of nightly (Sunday – Thursday 22:30‐06:00L) taxiway closures will be required to facilitate the work;
Taxiway Delta between IHPs D4 and D5 Closed Sunday 12th May until Monday 20th May.
Taxiway Lima Closed Monday 20th May.
Taxiway Delta (D6) and junction with Taxiway Romeo. Closed Tuesday 21st May until Tuesday 28th May.
Taxiway Bravo (B5) and Taxiway Juliet‐Echo Closed Wednesday 29th May.
4.1.2 The aforementioned taxiways will be fully operational outside of the nightly working times.
4.1.3 On the night of Monday 20th May, Taxiways Delta and Lima will not be closed simultaneously.
4.2 Stand Restrictions Taxiway Delta between IHPs D4 and D5 (12/05/19 – 20/05/19).
4.2.1 Whilst work is in progress on Taxiway Delta, night‐stopping aircraft are to be parked on Stand 61.
4.2.1.2 A non‐standard aircraft pushback manoeuvre will be required from Stand 25, as follows;
 Push back towards Stand 27, then pull forward with aircraft nose wheel stopped abeam Stand 25 centreline, facing Pier B.
4.2.1.3 Aircraft pushbacks will not be possible from Stand 61 whilst work is in progress. Taxiway Delta (D6) and junction with Taxiway Romeo (21/05/19 – 28/05/19).
4.2.2 Prior to works starting on Taxiway Delta at IHP D6, a night‐stopping aircraft is to be parked on Stand 31.
4.2.2.1 Aircraft may dock on Stand 32 and other stands within the Taxiway Delta/ Romeo cul‐de‐sac whilst work is in progress on Taxiway Delta at IHP D6.
4.2.2.2 Whilst work is in progress at IHP D6, should there be a requirement to push an aircraft back from Stands 22, 32, 202, 204 or 206, the following non‐standard procedure will apply to jet aircraft;
 Taxiway Delta. Aircraft nose wheel abeam Stand 208 centreline.
4.2.2.3 Prior to works starting at the Taxiway Delta/Romeo junction, night‐stopping aircraft are to be parked on the following stands;
 Stands 22, 24, 26, 28, 32, 201/202 and 203/204.
4.2.2.4 Whilst work is in progress at the Taxiway Delta/Romeo junction, should there be a requirement to push an aircraft back from Stand 206, the following non‐standard procedure will apply to jet aircraft;
 Taxiway Delta. Aircraft nose wheel abeam Stand 208 centreline.
4.2.2.5 As work progresses, it may be possible to relax some of the above requirements for night‐stopping aircraft. This will be managed tactically by the ADM, balancing the requirements for the work to progress and nightly operational requirements. NB: In the event of a requirement for an aircraft pushback from the aforementioned stands whilst the above work is in progress, Taxiway Papa will be required as an aircraft egress route.
Taxiway Bravo at IHP B5 and Taxiway Juliet‐Echo (29/05/19) and Taxiway Lima (20/05/19).
4.2.3 Pavement joint sealing tasks on Taxiways Bravo, Juliet‐Echo and Lima will be managed by the ADM tactically on a nightly basis to avoid operational disruption to stands served by those taxiways.
4.3 Aircraft Access to Western Maintenance Area during Taxiway Delta Works between IHPs D4 & D5.
4.3.1 Whilst night‐time work is in progress on Taxiway Delta between IHPs D4 and D5, there will be times when aircraft access/ egress to/ from the Western Maintenance Area is restricted.
4.3.2 Where possible, nightly working times may be tactically adjusted to suit planned aircraft movements to/ from the Western Maintenance Area.
4.3.3 To reduce any operational impact, users of the Western Maintenance Area are requested to pre‐notify Airfield Control of any night‐time requirements for aircraft movements to/ from the apron, giving as much prior notice as possible.
4.3.4 Whilst night‐time work is in progress on Taxiway Delta between IHPs D4 and D5 any aircraft manoeuvring to/ from the Western Maintenance Area is to be carried out under guidance from an Airfield Operations Follow‐Me vehicle. All aircraft will be routed through IHP D4.
4.3.5 Whilst manoeuvring aircraft to/ from the Western Maintenance area, tow crews can expect to be guided through at least one short portion of taxiway where there is no painted taxiway centreline marking or centreline lighting due to the non‐standard routeing required. 5.0 LOW VISIBILITY PROCEDURES (LVP)
5.1 Overall, the work has no impact on the airport’s ability to operate during periods of low visibility.
5.2 In the event of forecast low visibility, the planned night works will be cancelled.
6.0 FURTHER INFORMATION
6.1 A NOTAM(s) promulgating significant operational detail will be issued prior to the start of works.
 
OAN 46/2019 – CABLE INSTALLATION WORKS FOR AIRCRAFT FUEL HYDRANTS SERVING STANDS 57 & 58.
OAN REF:‐ 46/2019 DATE OF ISSUE:‐ 15/05/19 EFFECTIVE DATE:‐ 05/06/19 EXPIRY DATE:‐ 08/06/19
1.0 SUMMARY
A three night programme of work to install a new cable that forms part of the aircraft fuel hydrant leak detection system serving Stands 57 & 58. The work will require night‐time access to service pits located on Stands 44R, 47, 50, 54 and 55R. Stands 44R and 50 will be closed overnight whilst work is in progress and Stand 55R will be closed for a 48‐hour period during the works programme. The aircraft fuel hydrant system will remain active at all times.
2.0 PROGRAMME
2.1 The overall programme of work will commence on the night of Wednesday 5th June 2019.
2.2 The work will be completed by the morning of Saturday 8th June 2019.
2.3 The nightly working times will be 22:00 – 05:00L.
3.0 SCOPE OF WORKS
3.1 The scope of work will be the installation of a new cable forming part of the aircraft fuel hydrant leak detection system on Stands 57 and 58.
3.2 The cable pull will commence from a fuel hydrant valve chamber (VC‐G) on Stand 55R and will terminate at valve chamber VC‐E on Stand 44R.
3.3 On the first night of work the contractor will be carrying out duct proving work. The new cable will be installed over the subsequent two nights.
4.0 LOCATION OF WORK AND OPERATIONAL IMPACT
4.1 All work will take place within apron areas along Terminal 3, between Stands 44R and 55R.
4.2 Stands 44R and 50 will be closed each night whilst work is in progress.
4.3 Stand 55R will be closed during the prescribed overnight working times on Wednesday 5th June, and then closed continuously from 22:00L on Thursday 6th until 05:00L on Saturday 8th June.
4.4 Whilst Stand 55R is closed, if required, the stand may be used as a bussing point.
4.5 Prior to the start of works each night, night‐stopping aircraft are to be parked on Stands 47 and 54.
4.6 Upon completion of works each morning, aircraft will be towed to Stands 44R and 50 to allow first wave departures from contact stands, as normal.
5.0 LOW VISIBILITY PROCEDURES (LVP)
5.1 Overall, the work has no impact on the airport’s ability to operate during periods of low visibility.
5.2 In the event of forecast low visibility, work may continue at the discretion of the Airfield Duty Manager.
 
OAN 50/2019 – SCHEDULED RUNWAY 05L-23R NIGHT-TIME MAINTENANCE & NORTHSIDE TAXIWAY REPAIRS.
OAN REF:‐ 50/2019 DATE OF ISSUE:‐ 28/05/19 EFFECTIVE DATE:‐ 04/06/19 EXPIRY DATE:‐ 07/06/19
1.0 SUMMARY
1.1 Runway 05L‐23R will be closed for three consecutive nights in early June to allow for essential maintenance works on the runway, within its associated strip and on associated northside taxiways. All flight operations will take place on Runway 05R‐23L whilst work is in progress.
2.0 PROGRAMME
2.1 Work will take place on the nights of Tuesday 4th to Thursday 7th June 2019, inclusive.
2.2 The nightly working hours will be 23:59 – 06:00L.
3.0 SCOPE & LOCATION OF WORKS
3.1  Routine maintenance tasks including maintenance of painted runway markings, runway surface friction assessments, grass cutting within the runway strip and aeronautical ground lighting (AGL) repairs/ replacements and bolt inspections.
 Asphalt pavement repairs on Taxiway Alpha between Intermediate Holding Point (IHP) A2 and its junction with Taxiway Bravo.
 10 x asphalt repairs along the full length of the Runway 05L‐23R pavement.
 Pavement core sample surveys at multiple entrance/ exit links serving Runway 05L‐23R.
 Saw cutting and joint sealing of new concrete pavement bays that will form part of the new Taxiway Echo, involving overnight, sequential closures of Taxiways Charlie (C1), Kilo (K5) and Bravo (B2‐B3).
4.0 OPERATIONAL IMPLICATIONS
4.1 Runway Operations
4.1.1 During the Runway 05L‐23R closure periods (23:59‐06:00L) all flight operations will take place on Runway 05R‐23L.
4.2 Taxiway Restrictions
4.2.1 Taxiway Alpha, between IHP A2 and its junction with Taxiway Bravo will be closed each night that work takes place.
4.2.2 To facilitate the saw cutting and joint sealing described above, sections of Taxiways Charlie, Bravo or Kilo will be closed on a nightly basis, as agreed with the Airfield Duty Manager. N.B: The aforementioned taxiways will not be closed simultaneously.
5.0 LOW VISIBILITY OPERATIONS (LVO)
5.1 In the event of forecast low visibility, the night works will be cancelled and Runway 05L‐23R will remain open.
5.2 In the event of un‐forecast reduced visibility conditions (meeting the criteria for Aerodrome Safeguards) during the Runway 05L‐23R closure period when work has begun, the aerodrome will close to flight operations whilst the runway is recovered. An ‘AD Closed’ NOTAM will be issued in such circumstances.
 
OAN 51/2019 – MAN-TP PP04 D2 CONSTRUCTION OF NEW TAXIWAY DELTA
This OAN replaces OAN 123-2018 which expires on 31st May 2019
OAN REF:- 51/2019 DATE OF ISSUE:- 28/05/19 EFFECTIVE DATE:- 01/06/19 EXPIRY DATE:- 30/08/19
1.0 SUMMARY
1.1 Work continues on the construction of new Taxiway Delta as part of the Manchester Transformation Project, with the installation of pits and ducts from Stand 66 to Stand 74.
2.0 PROGRAMME
2.1 Overall: Saturday 1st June to Friday 30th August 2019.
2.2 Nominal working hours will be Monday to Friday 08:00-18:00.
2.3 The work will be carried out in phases; each approximately 5 weeks in duration.
3.0 SCOPE & LOCATION OF WORKS
3.1 Following the completion of the works on Stands 66 and 67, the work site will continue to move north from Stand 68. Multiple stands may be closed at the same time, dependant on the stand planning programme. All works will be located within an enclosed and demarked.
3.2 The overall scope of works will encompass the following:
• Site establishment for each phase with full height, lit, Heras fencing and red/white baseboards.
• Excavation and installation of pits and ducts.
• Saw cutting and joint sealing.
4.0 OPERATIONAL IMPLICATIONS
4.1 Stand Restrictions
4.1.1 The work recommences on Stand 66 and 67. As each phase of works is completed the compound will move on to the next agreed phase of stand closures. The fencing from Stand 66 will be relocated to Stand 68 and Stand 66 will reopen; then from Stand 67 to Stand 69 etc so that the next compound is established.
4.2 Road restrictions
4.2.1 The access gate and road for the emergency Rendezvous Point (RVP) West will be maintained always throughout the works.
4.3 Ground Service Equipment (GSE) Areas
4.3.1 The Unit Load Devices (ULDs) racking system on Stands 66 to 70 will remain accessible throughout the works.
4.3.2 Provision will be made at each site for the relocation of any affected GSE areas. See attached drawing for indicative site layout.
5.0 LOW VISIBILITY PROCEDURES (LVP)
5.1 Overall, the work has no impact on the airport’s ability to operate during periods of low visibility.

View attachment 13328
 
Last edited:
OAN 52/2019 MAN-TP PP04 A4-A5 DUCT INSTALLATION
OAN REF:- 52/2019 DATE OF ISSUE:- 31/05/19 EFFECTIVE DATE:- 16/06/2019 EXPIRY DATE:- 23/06/2019
1.0 SUMMARY
1.1 A one-week programme of night works to complete the installation of primary ducting and sign bases and ducting between IHP A4 and IHP A5.
2.0 PROGRAMME
2.1 The overall programme of work will commence on Sunday 16th June and will be completed by Sunday 23rd June 2019.
2.2 Nominal working hours will be: 21:30-05:00L. See paragraph 4.2.1 regarding Code F departures.
3.0 LOCATION & SCOPE OF WORKS
3.1 All work will be located on Taxiway Alpha between IHP A4 and IHP A5.
3.2 The overall scope of works will involve the following tasks:
• Installation of primary ducting.
• Installation of sign ducting and bases x3.
4.0 OPERATIONAL IMPLICATIONS
4.1 Taxiway Closures
4.1.1 Taxiways Alpha and Charlie will be closed from IHP A4 to IHP A5 and IHP C1 to IHP C2.
4.2 Code F Operations
4.2.1 The start time of the works may be delayed if the A5 to A4 routing is required for any Code F (A380) off schedule departures. ATC will advise the ADM in advance if this routing is required.
5.0 LOW VISIBILITY OPERATIONS (LVO)
5.1 Overall, the work has no impact on the airport’s ability to operate during periods of low visibility.
 
OAN 54/2019 MAN-TP EAST PIER CUT THROUGH (Phase 2)
OAN Ref:‐ 54/2019 Date of Issue:‐ 11/06/2019 Effective Date:‐ 11/06/2019 N/A Expiry Date:‐ 27/09/2019
THIS DOCUMENT REPLACES MWB 21/2019 WITH IMMEDIATE EFFECT.
1.0 SUMMARY
1.1 As part of the MAN‐TP transformation, a 4‐month programme of works will be carried out to cut through the T2 terminal front and construct a new bag hall access.
2.0 PROGRAMME
2.1 This programme will run from 11th June 2019 until 27th September 2019.
2.2 Working hours 07:00 – 18:00. Monday – Friday (with some Saturdays as required).
3.0 LOCATION & SCOPE OF WORKS
3.1 A small compound will be erected over a portion of the head of stand road at Stand 207. This will require the road to be narrowed, the pedestrian walk way moved, and equipment bay 207 to be partially hatched out to ensure the road remains passable (see fig 2).
3.2 The work site will house a skip for broken out concrete, plant equipment, and will also be used to accept deliveries into the site.
3.3 The works site will be accessed via the apron road, from the North Western end for deliveries and, from the South Eastern end for skip movements.
4.0 OPERATIONAL IMPLICATIONS
4.1 Narrowing of apron road and moving of pedestrian walk way:
4.1.1 The head of stand road will be narrowed for a short distance abeam Stand 207 to allow for the external construction but will remain available for all vehicles including coaches and towed weldworks* (*accessing the forward hold of aircraft on Stand 208 only).
4.2 Skip movements:
4.2.1 It will be necessary to change the skip in the compound up to six times in the first 6‐weeks of these works. This must be coordinated between the Laing O’Rourke site supervisor and the ADM to ensure that there are no arrivals into Gate 400 when this change takes place as the operation will temporarily obstruct Gate 400 International Arrivals for approximately 20 minutes.
4.2.2 For all skip movements, an ASCO will attend the site to ensure traffic is not obstructed on the head of stand road.
4.3 Site deliveries:
4.3.1 Site deliveries will take place into the North Western end of the compound to minimise the impact on Gate 400 International Arrivals. Deliveries must be coordinated between the Laing O’Rourke site supervisor and the ADM .
4.3.2 For all site deliveries, an ASCO will attend the site to ensure traffic is not obstructed on the head of stand road.
5.0 LOW VISIBILITY OPERATIONS (LVO)
5.1 This work has no impact on the airfields ability to operate in LVPs.
View attachment 13529

View attachment 13530
 
OAN 55/2019 – T3 STAND ACCESS TOWER ROOF DRAINAGE IMPROVEMENTS
OAN REF:‐ 55/2019 DATE OF ISSUE:‐ 11/06/2019 EFFECTIVE DATE:‐ 17/06/2019 N/A EXPIRY DATE:‐ 29/06/2019
1.0 SUMMARY The installation of reserve overflow drainage systems for the roofing area of the Terminal 3 Pepper Pots.
2.0 PROGRAMME
2.1 Daily works shall start on Monday 17th June until Friday 29th June 2019 inclusive.
2.2 Working hours will be 0730 – 1630L Monday ‐ Friday.
3.0 SCOPE & LOCATION OF WORKS
3.1 The overall scope of works will involve the following tasks;
 Cut a hole in the side of the cladding of the Stand Access Tower
 Install overflow system
 Seal overflow system by welding
3.2 Works shall be located on the T3 head of stand road behind the Stand Access Towers through Stands 50 – 55.
3.3 A typical site layout can be seen in fig.1 overleaf, this layout shall be replicated on all of the Stand Access Towers requiring works.
4.0 OPERATIONAL IMPLICATIONS
4.1 Whilst works are on‐going a single lane of the head of stand road shall be closed to accommodate the boom lift vehicle required to complete the works.
4.2 Bi‐Directional traffic flow is to be maintained via the single open lane. Local traffic management signage is to be employed to ensure safe road usage.
4.3 Access to buildings and operationally required areas is to be maintained at all times.
5.0 LOW VISIBILITY OPERATIONS (LVO)
5.1 Works shall have no implications on the Airport’s ability to operate during periods of low visibility.
View attachment 13531
 
OAN 56/2019 –MAN-TP PP16 AGL MIGRATION.
OAN REF:- 56/2019 DATE OF ISSUE:- 14/06/19 EFFECTIVE DATE:- 01/07/19 EXPIRY DATE:- 16/08/19
1.0 SUMMARY
1.1 A seven-week programme of work to migrate the Aeronautical Ground Lighting (AGL) and taxiway signage from the existing Substation B1d to the new Substation D, at the head of Stand 61. All work will be carried out during daylight hours and in good weather conditions. All taxiway lighting and signage will be fully serviceable outside of the daily working times.
2.0 PROGRAMME
2.1 Works will commence on Monday 1st July 2019 and is planned to be finished on Tuesday 30th July 2019. Two contingency weeks have been added to the end of the programme (31st July – 16 th August 2019) to account for any unforeseen delays.
2.2 Overall: Monday to Friday, with daily working times of 07:30-18:00hrs local. There may be a requirement for some weekend shifts; the ADM will be advised in advance.
3.0 LOCATION & SCOPE OF WORKS
3.1 Work will be carried out in the new DP16 pit situated abeam Delta 4 (D4), in Substation B1d and in the new Substation D. Circuits affected are across the north side taxiway system, from Bravo 2 (B2) in the west to abeam Stand 47 in the east and as far north as Stand 64. See attached drawing for exact circuits.
3.2 The scope of work will include; • Identification and isolation of each circuit.
• Breaking the circuit, rejointing and connecting to the new Substation D.
• Commissioning of individual circuits.
• Control changeover.
• Update of ATC mimics.
• Commissioning of control system.
4.0 OPERATIONAL IMPLICATIONS
4.1 At times throughout the programme some taxiway signage, sections of taxiway centreline, taxiway edge and, Intermediate Holding Point (IHP) AGLs will be affected. The UKPNS Site Supervisor will confirm to the ADM the exact circuits affected each day.
4.2 Whilst work is in progress the AGLs/signage controlled by the circuits being migrated to the new substation will not be available. Works will only be carried out during daylight hours when there is no forecast risk of Low Visibility Procedures (LVP).
5.0 LOW VISIBILITY OPERATIONS (LVO)
5.1 In the event of forecast low visibility, the works will be cancelled.
5.2 In the event of unforeseen low visibility prevailing, the circuits affected will be recovered and the work party will vacate the airfield. This process may take up to three hours to complete. An Airfield Operations ‘Follow-me’ will be provided for any aircraft needing to transit any unlit areas until the circuits are recovered.
View attachment 13532
 
OAN 57-2019 MAN-TP PP04 TWY ECHO PH 4
OAN REF:- 57/2019 DATE OF ISSUE:- 14/06/19 EFFECTIVE DATE:- 07/07/19 EXPIRY DATE:- 04/10/19
1.0 SUMMARY
1.1 A programme of up to twelve-weeks work to construct the third phase of concrete pavement bays for the new Taxiway Echo. Whilst work is in progress there will be H24 closures of a portion of Taxiway Delta and HN closure of a portion of Taxiway Charlie.
2.0 PROGRAMME
2.1 The overall programme of work will commence on the night of Sunday 7 th July at 20:00hrs local until 06:00hrs local on Friday 4th October 2019.
2.2 The programme of pavement building works will be undertaken Sunday to Thursday at night.
2.3 The working times will be:
• Area 1 – 20:00-06:00
• Area 2 – 21:30-05:30
3.0 SCOPE & LOCATION OF WORKS
3.1 All work in Area 1 will take place within a lit, fenced compound on Taxiway Delta at Intermediate Holding Position (IHP) D4 and across to the B1d Substation. The night working in Area 2 will be delineated by red and white melba logs lit with blue obstacle lights and stretches from Taxiway Charlie at IHP C2 along Taxiway Lima to the B1d Substation. See attached drawing for exact locations.
3.2 The overall scope of works will encompass the following:
• Site Clearance associated with the removal of existing airfield infrastructure
• Excavation of existing grassed area and construction of proposed pavement
• Installation of surface water drainage including attenuation
• Installation of new Primary & Secondary AGL ducting
• Reconfiguration of existing taxiways
• Installation of various taxiway signage & surface markings
• Diversion of existing AGL cables
4.0 OPERATIONAL IMPLICATIONS
4.1 Taxiway Closures
4.1.1 Taxiway Delta will be closed H24 at IHP D4 from 20:00L on Sunday 7th July 2019 until 06:00L on the morning of Friday 4th October 2019.
4.1.2 Taxiway Charlie will be closed HN at IHP C2 from 21:30 until 05:30L, Sunday to Thursday. *
4.1.3 Taxiway Lima will be closed HN abeam Stand 12C centreline and abeam Stand 8/10 clearway from 21:30- 05:30L, Sunday to Thursday. * *The closure of Taxiways Charlie and Lima and may be postponed if the departure of the Emirates A380 on Stand 12 is delayed.
4.2 Northside Taxiways - Aircraft Manoeuvring Restrictions
4.2.1 For the duration of the works, aircraft will be routed around the works area using a combination of Taxiway Alpha, via IHP A5, Taxiway Lima, via IHP L1 (HJ) and L2 and Taxiway Charlie, via IHP C2 (HJ), as required.
4.2.2 A380 aircraft, taxiing inbound following a Runway 23R arrival will directed along Taxiways Alpha and Bravo and/or Kilo for docking on Stand 12. The routing through IHP C2 will only be used under exceptional circumstances i.e. incorrect routing or when a traffic situation is such that no other routing is possible.
4.2.3 Flight crews should be aware that the turn between IHPs C2 and D3 has an unlit painted taxiway centreline and blue taxiway edge lighting.
4.2.4 Furthermore, the turn between IHPs C2 and D3 is restricted in terms of permitted aircraft size, as follows;
• C2 to D3 (right turn) – Maximum A330-300.
• D3 to C2 (left turn) – Maximum B757-300.
4.3 Aircraft Pushbacks
4.3.1 For the duration of the works, the standard pushback for ICAO Code F (A380) aircraft from Stand 12 will be;
• Pushback towards Intermediate Holding Position (IHP) L1 and then tow forwards to IHP D3 before tug release. See attached drawing and written procedure. An Airfield Operations Safety & Compliance Officer must be in attendance for ALL pushbacks to safeguard the aircraft wingtip from vehicles on the apron road at Stand 10 and to check that the aircraft push remains on the demarked nosewheel route.
4.3.2 During the night time closure of a section of Taxiway Lima, aircraft pushing back from: • Stands 2, 4, 6 & 8 will be given a non-standard push to taxi out via IHP L2.
• Stands 10, 12L and 12R will require the assistance of an ASCO to confirm that the area behind their stand is clear and to remove the barriers on Taxiway Lima before they can push back.
4.4 Stand restrictions
4.4.1 Airfield Control will endeavour to park night stopping aircraft on Stand 10 before Taxiway Lima closes at 21:30hrs. However, due to the scheduled departure time of the A380, it is unlikely that an aircraft will be parked on Stand 12L before this time; therefore, if works has commenced in Area 2 the inbound aircraft for Stand 12L (and Stand 10 as necessary) must shut down its engines and be towed on to stand. An ASCO will attend to remove the barriers and provide a Follow Me along any unlit section of taxiway.
5.0 LOW VISIBILITY PROCEDURES (LVP)
5.1 Overall, the work has no impact on the airport’s ability to operate during periods of low visibility.
View attachment 13533
 
OAN 58/2019 – OVERNIGHT NORTHSIDE PAVEMENT REPAIRS OAN
REF:‐ 58/2019 DATE OF ISSUE:‐ 18/06/19 EFFECTIVE DATE:‐ 07/07/19 N/A EXPIRY DATE:‐ 02/08/19
1.0 SUMMARY A three week programme of work to complete essential airfield pavement repairs on several northside taxiways. The work will require localised, overnight taxiway closures, and in some instances, there will be a requirement for night‐stopping aircraft to be parked on stands before pavement repair work takes place. Additionally, there will be occasions when night‐time aircraft access onto the Western Maintenance Area is restricted.
2.0 PROGRAMME
2.1 The overall programme of work will commence on the night of Sunday 7th July 2019.
2.2 The work is scheduled to be completed by the morning of Friday 2nd August 2019.
2.3 Overall, the work will take place Sunday to Thursday nights (inclusive), with nightly working hours of 22:30 – 06:00L. NB: The above programme dates include 6 x shifts set aside for contingency.
3.0 SCOPE & LOCATION OF WORKS
3.1 The required working locations will be as follows;
 03/07/19 – 04/07/19 ‐ Taxiway Delta between Intermediate Holding Point (IHP) D5 and junction with Western Maintenance Area and IHP D4.
 04/07/19 – Taxiway Delta (rear of Stand 31).
 07/07/19 – 11/07/19 – Taxiway Delta at junction with Taxiway Romeo.
 14/07/19 – 16/07/19 – Taxiway Delta abeam Stands 239 and 241.
 17/07/19 ‐ 18/07/19 – Taxiway November‐Alpha abeam Stand 116L.
 21/07/19 – 22/07/19 – Taxiways Lima, Bravo/Foxtrot and Juliet‐Echo (minor, short duration works)
 23/07/19 – 24/07/19 – Stand 206.
3.2 The scope of work will involve a variety of repair and maintenance tasks including;
 Maxicrete repairs.
 PQX pavement bay replacements.
 Sealing of pavement cracks.
 Pavement joint sealing.
4.0 OPERATIONAL IMPLICATIONS
4.1 Taxiway Closures
4.1.1 The following schedule of nightly (Sunday – Thursday 22:30‐06:00L) taxiway closures will be required to facilitate the work;
Taxiway Delta between IHPs D4 and D5 Closed Wednesday 3rd and Thursday 4th July.
Taxiway Delta (rear of Stand 31) Closed Thursday 4th July.
Taxiway Delta at junction with Taxiway Romeo. Closed Sunday 7th ‐ Thursday 11th July.
Taxiway Delta (abeam Stands 239 & 241) Closed Sunday 14th – Tuesday 16th July.
Taxiway November‐Alpha (abeam Stand 116L) Closed Wednesday 17th and Thursday 18th July.
4.1.2 On the nights of Sunday 21st and Monday 22nd July there will various minor repairs taking place on Taxiways Lima, Bravo/Foxtrot and Juliet‐Echo. These closures will be managed tactically to avoid any operational disruption.
4.1.3 The aforementioned taxiways will be fully operational outside of the nightly working times.
4.2 Stand Restrictions Taxiway Delta between IHPs D4 and D5 (03/07/19 – 04/07/19).
4.2.1 Whilst work is in progress on Taxiway Delta, night‐stopping aircraft are to be parked on Stand 61.
4.2.1.2 A non‐standard aircraft pushback manoeuvre will be required from Stand 25, as follows;
 Push back towards Stand 27, then pull forward with aircraft nose wheel stopped abeam Stand 25 centreline, facing Pier B.
4.2.1.3 Aircraft pushbacks will not be possible from Stand 61 whilst work is in progress.
4.2.1.4 On one of the working nights, there will also be a requirement for a night‐stopping aircraft to be parked on either Stand 62L or 62C, whilst 3 x minor pavement repairs are carried out to the north of IHP D5. Taxiway Delta at IHP D6/ rear of Stand 31 (04/07/19).
4.2.2 Prior to works starting on Taxiway Delta in the vicinity of IHP D6, a night‐stopping aircraft is to be parked on Stand 31.
4.2.2.1 Aircraft may dock on Stand 32 and other stands within the Taxiway Delta/ Romeo cul‐de‐sac whilst work is in progress on Taxiway Delta at IHP D6/ rear of Stand 31.
4.2.2.2 Whilst work is in progress at IHP D6, should there be a requirement to push an aircraft back from Stands 22, 32, 202, 204 or 206, the following non‐standard procedure will apply to jet aircraft;
 Taxiway Delta. Aircraft nose wheel abeam Stand 208 centreline. Taxiway Delta at junction with Taxiway Romeo (07/07/19 – 11/07/19). 4.2.3.1 Prior to works starting at the Taxiway Delta/Romeo junction, night‐stopping aircraft are to be parked on the following stands;
 Stands 22, 24, 26, 28, 32, 201/202 and 203/204.
4.2.3.2 Whilst work is in progress at the Taxiway Delta/Romeo junction, should there be a requirement to push an aircraft back from Stand 206, the following non‐standard procedure will apply to jet aircraft;
 Taxiway Delta. Aircraft nose wheel abeam Stand 208 centreline.
4.2.3.3 As work progresses, it may be possible to relax some of the above requirements for night‐stopping aircraft. This will be managed tactically by the ADM, balancing the requirements for the work to progress and nightly operational requirements. NB: In the event of a requirement for an aircraft pushback from the stands listed at paragraphs 4.2.2.2 and 4.2.3.2 whilst the above work is in progress, Taxiway Papa will be required as an aircraft egress route. Taxiway Delta abeam Stands 239 and 241 (14/07/19 – 16/07/19). 4.2.4.1 Prior to work starting on Taxiway Delta abeam Stands 239 and 241, night‐stopping aircraft are to be parked on the following stands;  Stands 104, 239 and 241.
4.2.4.2 Whilst work is in progress on Taxiway Delta abeam Stands 241 and 243, should there be a requirement to push aircraft back from Terminal 2, Pier 1 Stands 106, 108, 110, 112, 114, 116, the following non‐ standard procedure shall apply to jet aircraft;  Taxiway November‐Alpha facing west (towards cargo sheds).
4.2.4.3 Aircraft may dock on Stands 210, 211, 235, 237 and 241 whilst work is in progress, however subsequent aircraft pushback from these stands will not be possible until the completion of works the following morning. Taxiway November‐Alpha (17/07/19 – 18/07/19).
4.2.5.1 Prior to works starting on Taxiway November‐Alpha a night‐stopping aircraft is to be parked on Stand 116/116L.
4.2.5.2 Aircraft may dock on Stands 72, 110 and 112 whilst work is in progress, however subsequent aircraft pushback from these stands will not be possible until the completion of works the following morning.
Stand 206 (23/07/19 ‐ 24/07/19).
4.2.6.1 Stands 206 and 206L will be closed during the nightly working hours.
4.3 Aircraft Access to Western Maintenance Area during Taxiway Delta Works between IHPs D4 & D5.
4.3.1 Whilst night‐time work is in progress on Taxiway Delta between IHPs D4 and D5, there will be times when aircraft access/ egress to/ from the Western Maintenance Area is restricted.
4.3.2 Where possible, nightly working times may be tactically adjusted to suit planned aircraft movements to/ from the Western Maintenance Area.
4.3.3 To reduce any operational impact, users of the Western Maintenance Area are requested to pre‐notify Airfield Control of any night‐time requirements for aircraft movements to/ from the apron, giving as much prior notice as possible.
4.3.4 Whilst night‐time work is in progress on Taxiway Delta between IHPs D4 and D5 any aircraft manoeuvring to/ from the Western Maintenance Area is to be carried out under guidance from an Airfield Operations Follow‐Me vehicle. All aircraft will be routed through IHP D4.
4.3.5 Whilst manoeuvring aircraft to/ from the Western Maintenance area, tow crews can expect to be guided through at least one short portion of taxiway where there is no painted taxiway centreline marking or centreline lighting due to the non‐standard routeing required. 5.0 LOW VISIBILITY PROCEDURES (LVP)
5.1 Overall, the work has no impact on the airport’s ability to operate during periods of low visibility.

View attachment 13534

View attachment 13535

View attachment 13536

View attachment 13537

View attachment 13538
 
OAN 60/2019 – SCHEDULED RUNWAY 05L-23R NIGHT-TIME MAINTENANCE & NORTHSIDE TAXIWAY REPAIRS.
OAN REF:‐ 60/2019 DATE OF ISSUE:‐ 18/06/19 EFFECTIVE DATE:‐ 02/07/19 EXPIRY DATE:‐ 05/07/19
1.0 SUMMARY
1.1 Runway 05L‐23R will be closed for three consecutive nights in early July to allow for essential maintenance works on the runway, within its associated strip and on associated northside taxiways. All flight operations will take place on Runway 05R‐23L whilst work is in progress.
2.0 PROGRAMME
2.1 Work will take place on the nights of Tuesday 2nd to Thursday 4th July 2019, inclusive.
2.2 The nightly working hours will be 23:59 – 06:00L.
3.0 SCOPE & LOCATION OF WORKS
3.1  Routine maintenance tasks including maintenance of painted runway markings, runway surface friction assessments, grass cutting and weed control within the runway strip, reinstatement of 105m Cleared & Graded ‘burn line’ and aeronautical ground lighting (AGL) repairs.
 Asphalt pavement repairs on Taxiway Alpha between Intermediate Holding Point (IHP) A2 and its junction with Taxiway Bravo.  Maxicrete pavement repairs on Taxiway Juliet in the vicinity of IHPs J3, J4 and the junction with Link Hotel.
 Pavement strength surveys along a portion of Runway 05L‐23R and at multiple runway entrance/ exit links.
 Saw cutting and joint sealing of new concrete pavement bays that will form part of the new Taxiway Echo, involving overnight, sequential closures of Taxiways Charlie (C1), Kilo (K5) and Bravo (B2‐B3).
4.0 OPERATIONAL IMPLICATIONS
4.1 Runway Operations
4.1.1 During the Runway 05L‐23R closure periods (23:59‐06:00L) all flight operations will take place on Runway 05R‐23L.
4.2 Taxiway Restrictions
4.2.1 Taxiway Alpha, between IHP A2 and its junction with Taxiway Bravo will be closed each night that work takes place.
4.2.2 To facilitate the saw cutting and joint sealing described at paragraph 3.1, sections of Taxiways Charlie, Bravo or Kilo will be closed on a nightly basis, as agreed with the Airfield Duty Manager. N.B: The aforementioned taxiways will not be closed simultaneously.
4.2.3 Localised portions of Taxiway Juliet between IHPs J3 and J4 will be closed each night that work takes place. Likewise, a concurrent closure of Link Hotel will be required on one of the working nights.
4.2.3.1 Aircraft access/egress to/from Terminal 3 will be retained at all times whilst work is in progress.
5.0 LOW VISIBILITY OPERATIONS (LVO)
5.1 In the event of forecast low visibility, the night works will be cancelled and Runway 05L‐23R will remain open.
5.2 In the event of un‐forecast reduced visibility conditions (meeting the criteria for Aerodrome Safeguards) during the Runway 05L‐23R closure period when work has begun, the aerodrome will close to flight operations whilst the runway is recovered. An ‘AD Closed’ NOTAM will be issued in such circumstances.
 
OAN 61/2019 – AIRCRAFT FUEL HYDRANT VALVE CHAMBER MAINTENANCE.
OAN REF:‐ 61/2019 DATE OF ISSUE:‐ 21/06/19 EFFECTIVE DATE:‐ 01/07/19 EXPIRY DATE:‐ 10/07/19
1.0 SUMMARY
An eight day programme of work to carry out required maintenance tasks within multiple aircraft fuel hydrant valve chambers serving Terminals 1 and 3. The work will take place during day time hours. The fuel hydrant system will remain active throughout. Some short‐term stand closures will be required whilst work is in progress.
2.0 PROGRAMME
2.1 Work will commence on Monday 1st and be completed by Wednesday 10th July 2019.
2.2 Work will take place Monday to Friday.
3.0 SCOPE OF WORKS
The scope of work will be the replacement of cathodic protection cell assemblies within eight fuel hydrant valve chambers, entailing minor pavement coring and reinstatement works.
4.0 LOCATION OF WORK AND OPERATIONAL IMPACT
4.1 The working locations and associated operational impacts are described in the table overleaf.
LOCATION OPERATIONAL IMPACT/ CONSIDERATIONS
VC‐2 01/07/19 IN GRASS AREA ADJACENT TO STAND 61L STAND 61L CLOSED 09:00 - 17:00L
VC‐A 02/07/19 STAND 27 STAND 27 CLOSED 09:00 - 17:00L
VC‐B 03/07/19 STAND 21 STAND 21 CLOSED FROM 08:00L
VC‐G 04/07/19 STAND 55R STAND 55R CLOSED FROM 11:00L
VC-E 05/07/19 STAND 44R STANDS 44 & 44R CLOSED 09:00 - 15:00L
VC1 08/07/19 IN FUEL HYDRANT CART PARKING AREA ADJACENT TO STAND 65 NONE
VC‐H 09/07/19 END OF PIER B UNDER STAND 12 FIXED LINK NONE
VC-C 10/07/19 STAND 1 STAND 1 CLOSED 09:00 - 15:00L
5.0 LOW VISIBILITY PROCEDURES (LVP)
Overall, the work has no impact on the airport’s ability to operate during periods of low visibility. In the event of forecast low visibility, work may continue at the discretion of the Airfield Duty Manager.
 
OAN 65/2019 –MAN-TP PP16 AGL MIGRATION.
This OAN replaces OAN 56-2019 with immediate effect. Changes relate to programme dates.
OAN REF:- 65/2019 DATE OF ISSUE:- 25/06/19 EFFECTIVE DATE:- 08/07/19 EXPIRY DATE:- 16/08/19
1.0 SUMMARY
1.1 A seven-week programme of work to migrate the Aeronautical Ground Lighting (AGL) and taxiway signage from the existing Substation B1d to the new Substation D, at the head of Stand 61. All work will be carried out during daylight hours and in good weather conditions. All taxiway lighting and signage will be fully serviceable outside of the daily working times.
2.0 PROGRAMME
2.1 Works will commence on Monday 8th July 2019 and is planned to be finished on Tuesday 6th August 2019. One contingency week has been added to the end of the programme (7th – 16th August 2019) to account for any unforeseen delays.
2.2 Overall: Monday to Friday, with daily working times of 07:30-18:00hrs local. There may be a requirement for some weekend shifts; the ADM will be advised in advance.
3.0 LOCATION & SCOPE OF WORKS
3.1 Work will be carried out in the new DP16 pit situated abeam Delta 4 (D4), in Substation B1d and in the new Substation D. Circuits affected are across the north side taxiway system, from Bravo 2 (B2) in the west to abeam Stand 47 in the east and as far north as Stand 64. See attached drawing for exact circuits.
3.2 The scope of work will include;
• Identification and isolation of each circuit.
• Breaking the circuit, rejointing and connecting to the new Substation D.
• Commissioning of individual circuits.
• Control changeover.
• Update of ATC mimics.
• Commissioning of control system.
4.0 OPERATIONAL IMPLICATIONS
4.1 At times throughout the programme some taxiway signage, sections of taxiway centreline, taxiway edge and, Intermediate Holding Point (IHP) AGLs will be affected. The UKPNS Site Supervisor will confirm to the ADM the exact circuits affected each day.
4.2 Whilst work is in progress the AGLs/signage controlled by the circuits being migrated to the new substation will not be available. Works will only be carried out during daylight hours when there is no forecast risk of Low Visibility Procedures (LVP).
5.0 LOW VISIBILITY OPERATIONS (LVO)
5.1 In the event of forecast low visibility, the works will be cancelled.
5.2 In the event of unforeseen low visibility prevailing, the circuits affected will be recovered and the work party will vacate the airfield. This process may take up to three hours to complete. An Airfield Operations ‘Follow-me’ will be provided for any aircraft needing to transit any unlit areas until the circuits are recovered.
 
Last edited:
OAN 66/2019 – MAN-TP T2 FUEL HYDRANT ENABLING WORKS
OAN REF:- 66/2019 DATE OF ISSUE:- 26/06/19 EFFECTIVE DATE:- 15/07/19 EXPIRY DATE:- 01/08/19
1.0 SUMMARY
1.1 An eighteen-day programme of both day and night works to carry out hot bolting and support beam cleaning within various valve chambers across Terminal 2 (T2) to facilitate future modification works. Whilst work is in progress, aircraft hydrant fuelling will not be available to some stands across the airfield for nine nights in accordance with the schedule detailed below.
2.0 PROGRAMME
2.1 Overall, the works will commence on the Monday 15th July and will be completed by Thursday 1st August 2019.
2.2 Nominal daily working hours from Monday 15th July until Friday 19th July 2019, will be 07:30-18:00hrs local.
2.3 Nominal nightly working hours from Sunday 21st July until Thursday 1st August 2019, working Sunday to Thursday, will be 21:00-05:00hrs local.
2.4 Terminal 2 fuel hydrant shutdowns will take place between the hours of 21:30 and 04:30hrs local.
2.5 The Terminal 1/Terminal 3 shutdown will take place between 22:30 and 04:30hrs local. See table at Paragraphs 4.2 and 4.3 for exact fuel shutdown dates. 3.0 SCOPE 3.1 The work will involve the following tasks; • Access to valve chambers. • Pressure washing and removal of contaminated water within the valve chambers. • Support beam removal, cleaning and replacement. • Hot bolting.
View attachment 13748
4.4 Stands affected by the fuel hydrant shutdowns.
4.4.1 All Terminal 2 pier served stands (201-211 and 104-116) and remote stands 66-74, 80-84 & 231-243 will be without fuel from 21:30-04:30hrs local on the dates listed at paragraph 4.2
4.4.2 All Terminal 1 and Terminal 3 stands and Stands 61 to 65 inclusive will be without fuel from 22:30- 04:30hrs local on the dates listed at paragraph 4.3
4.4.3 Aircraft arriving after the fuel shut down and requiring fuel, may be parked on a remote stand, where hydrant fuelling will be available. 4.5 Taxiway & Apron Road Restrictions
4.5.1 VC3 falls within the Taxiway Delta strip. Any aircraft larger than B757 should be routed through ASTL NA or ASTL PAPA on 23rd and 24th July.
4.5.2 Manned/controlled road diversions will be in place at VC2, VC3 and VC5, when necessary, on the dates listed in paragraphs 4.1 and 4.2.
5.0 LOW VISIBILITY OPERATIONS (LVO)
5.1 The work will have no effect on the airport’s ability to operate during periods of low visibility.
6.0 FURTHER INFORMATION 6.1 A NOTAM stating the schedule of aircraft fuel hydrant shutdowns will be promulgated prior to the start of works.
 
OAN 67/2019 MAN-TP PP16 HV & AGL INSTALLATION
This OAN replaces OAN 18-2019 with immediate effect.
OAN REF:- 67/2019 DATE OF ISSUE:- 28/06/2019 EFFECTIVE DATE:- 28/06/19 EXPIRY DATE:- 30/09/19
1.0 SUMMARY
1.1 As part of the MAN-TP transformation, work continues in the new pits and ducts for the High Voltage (HV) and Aeronautical Ground Light (AGL) cables from the existing Substation B1D to the new Substation D under construction at the head of Stand 61. This fourth phase of works is 13 weeks in duration.
2.0 PROGRAMME
2.1 This phase of work runs from Friday 28th June until Monday 30th September 2019. Day shifts will be Monday to Friday, working 07:00-18:00L; night shift will be Sunday to Thursday, working hours 22:00- 06:00L. The ADM will be advised of any weekend working required.
3.0 LOCATION & SCOPE OF WORKS
3.1 All works will be located around Stand 100 and in the UKPNS compounds; next to the B1d substation and at the head of Stand 61.
3.2 The overall scope of works will involve the following tasks:
• Refurbish pit E-IC-29.
• Excavation and connection to existing pits in TWY’s Lima & Delta strips.
• AGL and HV cabling.
• Migration of Constant Current Regulators (CCRs) from B1d to A1 Substation.
• Testing of services.
• HV works associated with the new substation and the decommissioning of substation B1D.
4.0 OPERATIONAL IMPLICATIONS
4.1 Stand Closures and Restrictions
4.1.1 Stands 100 & 101 next to the B1d substation are now permanently closed. Access to the B1d substation will be maintained for engineering staff.
4.1.2 The access road from Stand 61 to 100 is closed until the refurbishment of Pit E-IC-29 can be carried out.
4.2 Taxiway closures and Restrictions
4.2.1 TWY Delta will be closed at night from D5 to its junction with TWY Lima during the refurbishment of Pit E-IC-29. The Project Manager will advise the ADM, giving them sufficient prior notice, when they are in a position to carry out these works so that it can be coordinated with ATC.
4.2.2 Taxiway Delta can not be closed if Taxiway Lima is closed for the MAN-TP PP04 TWY ECHO CONSTRUCTION works. The Project Managers, in conjunction with the ADM and ATC, will agree a window in the programme to facilitate the refurbishment of the pit.
4.3 Testing of Services
4.3.1 It will be necessary to prove functionality of each new AGL circuit after migration of services from the B1d Substation to the new A1 Substation. This will be carried out in conjunction with Airfield Engineering and ATC and will involve switching AGL on and off throughout the day. No testing at night or during LVPs. OAN 65-2019 refers.
5.0 LOW VISIBILITY OPERATIONS (LVO)
5.1 Overall, the work has no impact on the airport’s ability to operate during periods of low visibility.
 
OAN 71/ 2019 – MAN-TP PP03 AIRSIDE CONSTRUCTION OAN REF:- 71/2019
DATE OF ISSUE:- 18/07/19 EFFECTIVE DATE:- 18/07/19 EXPIRY DATE:- 25/10/19
THIS OAN REPLACES OAN 118-2018 WITH IMMEDIATE EFFECT
1.0 SUMMARY
1.1 Works continue airside to construct new aprons and taxi-lanes and to reconfigure existing airside areas to form the new Terminal 2, Pier 2 Remote Stands.
2.0 PROGRAMME
2.1 Overall: Thursday 18th July 2019 until Friday 25th October 2019.
2.1.1 Work within Taxiways (TWY) November and Delta, outside of the main work site, will commence on Sunday 21st July 2019 for 3 weeks.
2.1.2 Work within Aircraft Stand Taxilane (ASTL) November-Alpha will commence 4th August 2019 for 2 weeks.
2.2 Working hours
2.2.1 Nominal working hours within the main site will be Monday to Friday 08:00-18:00hrs and Sunday to Thursday 20:00-06:00hrs local; at other times as required by programme and advised to MAG Operations
2.2.2 Working hours on TWYs November, Delta and ASTL November-Alpha will be Sunday to Thursday 22:30- 05:30hrs local.
3.0 SCOPE & LOCATION OF WORKS
3.1 The scope of works is:
• Excavation of grass areas and laying of new concrete pavement.
• Installation of electrical pit and duct lines.
• Modification/maintenance works to fuel hydrant system.
• Cathodic protection installation for fuel hydrant system.
• Installation of aeronautical ground lighting (AGL).
• Removal and application of surface markings.
• Saw cutting of new concrete pavement.
• Head of stand equipment installation and associated electrical works.
• Installation of steelwork into MH S16 on ASTL NA.
• Base construction and high mast light installation.
• Duct installation across Apron Road beside Stand 84/243.
• Construction of concrete base in grass area between Stands 84 and 243.
3.2 The main works site is at the north-western end of the airfield, encompassing the former ASTL November-Alpha and the remaining grass areas either side.
3.3 The night-working area will encompass a section of ASTL November-Alpha behind Stands 110 and 112, a section of TWY Delta at the northern side of the compound and a section of TWY November at the southern side of the compound. See attached drawing for exact locations.
4.0 OPERATIONAL IMPLICATIONS
4.1 Stand Restrictions during works on Taxiway Delta
4.1.1 Aircraft required to park or be removed from Stand 243 whilst the night time work in Taxiway Delta is ongoing must do so under tow. 4.2 Stand Restrictions during works on Taxiway November
4.2.1 Whilst work is in progress on TWY November, night-stopping aircraft are to be parked on Stand 72.
4.3 Stand Restrictions during works on ASTL November Alpha
4.3.1 Prior to work starting on ASTL November Alpha abeam Stands 110 and 112, a night-stopping aircraft is to be parked on Stand 110. 4.4 Taxiway Closures and Restrictions
4.4.1 Taxiways November and Delta will be closed at times to complete the areas of excavation within the Code E (B747 / A330) taxiway strip on the northern and southern borders of the main work site. Paragraph 2.2.2 refers.
4.4.2 Works within the strip of Taxiways November and Delta will not go ahead concurrently. Access to and from T2 Pier 1 will remain available throughout the works, under the safety oversite of the dedicated Airfield Operations ASCO.
4.4.3 The low-level blocks surrounding the excavation will be placed at 20 metres from the centreline of Delta (outside the graded portion of the strip). Wingtips of aircraft using Delta will overhang the excavated area, which will be cleared of any upstanding objects or loose materials. The works will not be active during the day time when November and Delta are open to aircraft operations.
4.4.4 ASTL November Alpha will be closed at night behind Stand 110 and 112. Paragraphs 2.1.2 and 2.2.2 refer.
4.4.5 The Aeronautical Ground Lights (AGLs) along Taxiway November from abeam Stand 74 to 72, along the relocated ASTL November Alpha and around the radii on to Taxiway Delta to abeam Stand 243 will remain unlit H24 throughout this works programme. Airfield Operations will provide a Follow Me vehicle during the hours of darkness and low visibility operations.
4.5 Pushback Procedures
4.5.1 When Taxiway Delta is closed from abeam Stand 243 the following non‐standard pushbacks are to be instructed by ATC:
• Stands 211, 237, 239, 241 and 243 - Pushback and pull forward to stand 237. Tug release and engine start abeam stand 237.
• Stands 104, 106, 108, 110, 112, 114 & 116 –push to face west (towards cargo sheds)
4.5.2 When Taxiway November is closed abeam Stand 72 the following non‐standard pushbacks are to be instructed by ATC:
• Stands 70, 71, 83 & 84 - Pushback and pull forward to stand 70. Tug release and engine start abeam stand 70.
• Stand 72 pushback can be facilitated by giving the contractor a 30-minute notice to vacate the area within Taxiway November strip, including the removal of all equipment.
4.6 Road closure
4.6.1 The Apron Road next to Stands 84 and 243 will be closed for 1-night for the installation of ducting from the main worksite to the grass area between the stands. The GallifordTry Site Supervisor will advise the ADM in advance when this will take place. Alternative vehicle routings will be available.
5.0 LOW VISIBILITY OPERATIONS (LVO)
5.1 The works will have no effect on Low Visibility Procedures.
5.2 Works on ASTL November Alpha and within the strip of Taxiways Delta and November will be cancelled in the event of forecast low visibility operations.
5.3 Work may continue within the main site during periods of low visibility at the ADM’s discretion.
View attachment 13895
 
OAN 72/2019 – DAYTIME POWER OUTAGE AFFECTING STANDS 201-204.
OAN REF:‐ 72/2019 DATE OF ISSUE:‐ 16/07/19 EFFECTIVE DATE:‐ 22/07/19 EXPIRY DATE:‐ 22/07/19
1.0 SUMMARY
On the afternoon/early evening of Monday 22nd July, there will be a temporary power outage (14:00 – 19:00L) that will affect the FEGP units on Stands 202, 203 and 204 and the EBT charging units on Stand 201. The power outage is required as part of the new Terminal 2 baggage hall construction programme.
2.0 PROGRAMME
2.1 All work will take place during the afternoon/ early evening of Monday 22nd July 2019.
2.2 The working hours will be 14:00 – 19:00L.
3.0 SCOPE & LOCATION OF WORKS 3.1 The work will require the temporary, partial isolation of a Low voltage (LV) panel within the Energy Centre Switchroom, and subsequent installation of a new electrical supply to serve the new Terminal 2 baggage hall.
3.2 All work will be located landside within the Energy Centre Switchroom. There will be no physical work taking place on the airfield.
4.0 OPERATIONAL IMPLICATIONS
4.1 On the afternoon/early evening of Monday 22nd July, between the hours of 14:00 and 19:00L the following items of airfield infrastructure will be unavailable for use;
 FEGP units on Stands 202, 203 and 204.
 EBT charging units located on Stand 201.
4.2 All affected airfield infrastructure will be returned to service upon completion of works.
4.3 Unless operationally required, Airfield Control will avoid allocating aircraft to Stands 202, 203 and 204 whilst the FEGP units are unavailable.
4.4 In the event of it being necessary to allocate an aircraft to any of the aforementioned stands whilst the FEGP units are unavailable, Handling Agents will be required to provide mobile Ground Power Units.
4.5 Where practicable, the use of the EBT charging units on Stand 201 should be completed by 14:00L and vehicles disconnected from the units prior to the start of the power outage.
5.0 CONSIDERATIONS PRIOR TO START OF WORKS
5.1 Prior to the start of works, a check will be carried out to ensure that there are no aircraft parked on Stands 202, 203 or 204 connected to FEGP units. Work will not be permitted to commence until any parked aircraft have either departed or been disconnected from the FEGP supply.
5.2 Again, prior to the start of works, a check will be undertaken to ensure that there are no vehicles connected to the EBT charging units on Stand 201.
6.0 LOW VISIBILITY PROCEDURES (LVP)
6.1 Overall, the work has no impact on the airport’s ability to operate during periods of low visibility.
 
OAN 75/2019 – SCHEDULED RUNWAY 05L-23R NIGHT-TIME MAINTENANCE & NORTHSIDE TAXIWAY WORKS. OAN REF:‐ 75/2019
DATE OF ISSUE:‐ 24/07/19 EFFECTIVE DATE:‐ 06/08/19 EXPIRY DATE:‐ 09/08/19
1.0 SUMMARY
1.1 Runway 05L‐23R will be closed for three consecutive nights in early August to allow for essential maintenance and survey works on the runway, within its strip and on associated northside taxiways. All flight operations will take place on Runway 05R‐23L whilst work is in progress.
2.0 PROGRAMME
2.1 Work will take place on the nights of Tuesday 6th to Thursday 8th August 2019, inclusive.
2.2 The nightly working hours will be 23:59 – 06:00L.
3.0 SCOPE & LOCATION OF WORKS
3.1
 Runway centreline aeronautical ground lighting (AGL) replacement.
 Runway fire hydrant maintenance encompassing flow testing, remedial work and general audits along the full length of Runway 05L‐23R.
 Walking inspection of the runway pavement.
 Fibre optic cable installation through Runway 23R Localiser Critical Area.
 Pavement strength surveys at seven runway entrance/ exit links, plus a section of Taxiway Bravo between Intermediate Holding Points (IHP) B3 and B6.
 Routine runway (and strip) maintenance tasks including paint marking refreshment, AGL repairs and bolt checks and grass cutting within the runway strip and ILS critical areas.
 Electrical duct finding and proving works within the grass area to the north of Taxiway Alpha, between IHP A2 and the junction with Taxiway Bravo.
4.0 OPERATIONAL IMPLICATIONS
4.1 Runway Operations
4.1.1 During the Runway 05L‐23R closure periods (23:59‐06:00L) all flight operations will take place on Runway 05R‐23L.
4.2 Taxiway Restrictions
4.2.1 Taxiway Alpha, between IHP A2 and its junction with Taxiway Bravo will be closed each night that work takes place.
4.2.2 On the night of Thursday 8th August, sections of Taxiway Bravo between IHPs B3 and B6 will be closed to facilitate pavement strength surveys. Taxiway closures will be arranged tactically to avoid operational disruption.
5.0 LOW VISIBILITY OPERATIONS (LVO)
5.1 In the event of forecast low visibility, the night works will be cancelled and Runway 05L‐23R will remain open.
5.2 In the event of un‐forecast reduced visibility conditions (meeting the criteria for Aerodrome Safeguards) during the Runway 05L‐23R closure period when work has begun, the aerodrome will close to flight operations whilst the runway is recovered. An ‘AD Closed’ NOTAM will be issued in such circumstances.
 
OAN 77-2019 REMOTE DE-ICING PAD OPERATION
OAN REF:- 77/2019 DATE OF ISSUE:- 24/07/19 EFFECTIVE DATE:- 31/07/19 EXPIRY DATE:- N/A
1.0 SUMMARY
1.1 Manchester Airport, in collaboration with Menzies Aviation, EasyJet and Jet2.com, will be trialling the concept of a remote de-icing pad for Winter 2019/2020. However, a pre-season test of the process will be undertaken at the end of July.
2.0 PROGRAMME
2.1 The remote de-icing pad test will take place on the Wednesday 31st July 2019, during first wave operations.
2.2 The approximate operational times will be 05:00 – 09:00hrs local.
3.0 LOCATION
3.1 The remote de-icing pad is located between intermediate taxiway hold points (IHP) Bravo 4 (B4) and Bravo 5 (B5).
3.2 The remote de-icing pad can operate in either an Easterly or a Westerly direction.
4.0 DE-ICING PAD LAYOUT
4.1 The remote de-icing pad can accommodate 2 x Code-C aircraft. This consists of 1 aircraft being de-iced and 1 aircraft in the standby position.
4.2 ATC may use adjacent taxiways to hold additional aircraft and/or circulate aircraft around taxiway islands to maximise flow to the de-icing pad.
4.3 Taxiway Bravo between IHP B4 and B5 will remain as a Code E Taxiway at all times when the de-icing pad is not in use.
5.0 PRE-PLANNING
5.1 Menzies Aviation, in collaboration with EasyJet and Jet2.com, will determine which aircraft are to be deiced within the pad and enter the appropriate code into Chroma. This will be undertaken every evening for the following day to assist the Airline, ATC, Airfield Control and the Ground Handlers by knowing in advance where the aircraft is to be de-iced.
5.2 Menzies Aviation have the ability to amend the plan as dynamic scenarios dictate. Communication is extremely important when a change occurs and Menzies Aviation must amend Chroma but also support with verbal communications to airlines, GHAs, Airfield Control and ATC.
6.0 REMOTE DE-ICING PAD LOCATION AND DESIGN
6.1 The remote de-icing pad is located on Taxiway Bravo, between ITHPs Bravo 4 and Bravo 5.
6.2 The remote de-icing pad can be utilised in either a Westerly or an Easterly direction.
6.3 The remote de-icing pad can accommodate 2 x Code C aircraft (A320/B737), 1 position for active de-icing and 1 position for standby (aircraft reconfiguration for de-icing).
6.4 During active de-icing operations Taxiway Bravo between IHP Bravo 4 and 5 will be operated as a code C taxiway.
7.0 AIRCRAFT PUSHBACK AND TAXI
7.1 Aircraft will request pushback clearance in the normal way.
7.2 When the remote de-icing pad is operating efficiently, ATC will aim to pushback aircraft when the deicing and standby position in the remote de-icing pad is occupied. This should allow the aircraft to push, start and taxi directly into the standby position (as by this time the standby aircraft will now be engaged in active de-icing). This will ensure a continuous supply of aircraft to the remote de-icing pad. 7.3 Aircraft will request taxi clearance to the remote de-icing pad and continue under own power as directed by ATC.
7.4 At an appropriate point, ATC will hand the aircraft onto the remote de-icing Pad Controller (call sign ‘Menzies De-icing’) on 135.005 MHz Aircraft should ensure that their standby frequency is selected as Manchester Ground on 121.855 MHz in case of emergency.
8.0 ENTERING THE REMOTE DE-ICING PAD
8.1 Aircraft will either stop abeam (commander side) the ‘STOP DE-ICE’ or ‘STOP STANDBY’ depending on traffic in the pad. Expediency of aircraft movements is paramount to ensure efficiency of the remote deicing pad is maintained.
8.2 The aircraft Commander will then configure and prepare their aircraft for de-icing. Aircraft will ideally be configure their aircraft in the standby position.
8.3 When safe to do so and the de-icing pad aircraft position is clear, the Commander of the queuing aircraft will taxi their aircraft on to the pad to the ‘STOP DE-ICE’ position and set the parking brake.
8.4 NOTE: If both the aircraft queuing position and de-icing pad position are both clear of aircraft, the aircraft Commander shall immediately enter the de-icing pad and come to a stop at the ‘STOP DE-ICE’ position and set the parking brake.
8.5 Using the aircraft registration as the call-sign, the remote de-icing Pad Controller (call sign ‘Menzies Deicing’) will contact the aircraft Commander on 135.005 MHz to confirm that the aircraft parking brake is set, the aircraft is configured for de-icing and to request any details as to specific requirements.
8.6 All remote de-icing pad servicing vehicles are to remain in the paint marked Safe Zones whilst aircraft are manoeuvring on the remote de-icing pad. This ensures vehicles remain clear of the Code-C taxiway strip.
9.0 OPERATING WITHIN THE REMOTE DE-ICING PAD
9.1 If for any reason the aircraft, having entered the de-icing pad is not in the correct position on the taxiway, either in relation to the designated ‘Stop’ position or in relation to the Taxiway Centre Line, the de-icing Pad Controller will ask the aircraft Commander to contact MANCHESTER GROUND on VHF radio on frequency 121.855 MHz to request permission to taxi the aircraft around in order to reposition in the correct position within the remote de-icing pad.
9.2 Prior to utilising the de-icing rigs for remote ‘engines running’ de-icing, a FOD check for loose items will be completed by the driver in addition to ensuring the equipment doors on the de-icing rig equipment bays are securely fastened in the closed position.
9.3 Each de-icing rig involved in the de-icing process shall remain in the Safe Zone, with the de-icing rig positioned so that the de-icing rig faces the flight deck of the aircraft when the aircraft has come to a stop on the remote de-icing pad. The Safe Zone shall be a previously designated and identified area adjacent to the pad. Each de-icing rig will remain in its Safe Zone until instructed to move by the de-icing Pad Controller.
9.4 The Pad Controllers vehicle will then enter the taxiway and stop in position with the handbrake applied in front of the aircraft nose, leaving sufficient space to enable the flight crew to clearly see the vehicle. This vehicle position is the required visual method of communication with the aircraft Commander and will prevent the aircraft being inadvertently moved forward during the de-icing process. The de-icing Pad Control vehicle shall remain stationary in front of the aircraft nose throughout the de-icing process and will only vacate the remote de-icing pad when all de-icing rigs and personnel have vacated the taxiway area.
9.5 Only when the flight crew have confirmed that the ‘aircraft is prepared for spraying’ shall the de-icing process commence.
9.6 Only when the de-icing Pad Controllers vehicle is in position in front of the aircraft nose, with the parking brake set, shall the de-icing Pad Controller communicate to each de-icing rig via UHF radio to pull forward and position itself adjacent to the leading edge of the aircrafts port and starboard wings. 9.7 Before leaving the marked Safe Zone area, each de-icing rig crew will position the MEWP to ensure that the lower surface of the basket floor is elevated to a height to provide 1.5 metres clearance from the upper surface of the aircraft engine. This shall be the minimum height position for the MEWP whilst engaged in de-icing activities on the remote de-icing pad. Only when the de-icing rig re-enters the Safe Zone may the MEWP basket then be lowered below this minimum height position. This MEWP position also provides for a good 360° view whilst the de-icing rig is manoeuvring. Whilst the basket is in the elevated position the de-icing rig speed limiter will also automatically engage
9.8 The route taken into the de-icing pad by each de-icing rig will always be the same route to exit the pad.
9.9 Each de-icing rig will manoeuvre and position adjacent to the aircraft airframe strictly in accordance with the ‘STOP POSITIONS FOR OPEN BASKET DE-ICING RIGS’ diagram, which may be found within the Appendices of this Process.
9.10 The de-icing Pad Controller shall advise the aircraft Commander that the de-icing process will now commence.
9.11 The aircraft shall be de-iced/anti-iced in accordance with Menzies Aviation Company Procedures and all supplementary instruction provided by the de-icing Pad Controller.
9.12 The de-icing Pad Controller will maintain a constant listening watch on ATC MANCHESTER GROUND Frequency 121.855 MHz, as well as the dedicated de-icing frequency 135.005 MHz. UHF radio communication between the de-icing Pad Controller and the de-icing rigs shall be maintained throughout the de-icing process, albeit whilst the de-icing is in progress the radio communication with each de-icing rig will be minimal.
9.13 Each de-icing rig engaged in remote de-icing processes is fitted with a mounted anemometer instrument, linked to a digital display mounted within the de-icing rig drivers cab and visible to the de-icing rig driver at all times. The purpose of the fitted anemometer is to provide additional reference for the de-icing rig driver to ensure that the de-icing rig remains outside of the main engine efflux. The maximum permissible velocity reading on the anemometer display shall be no more than 20 metres/second, which is equal to 45mph or 72kph.
9.14 If the de-icing Pad Controller loses clear VHF communications with the Flight Crew, a call to ATC MANCHESTER GROUND on frequency 121.855 MHz will request that remote de-icing is suspended, until such time that VHF communications with the aircraft are re-established. In all cases two UHF and two VHF radios, with an established power supply will be carried in the de-icing Pad Controllers vehicle, in order to provide for ‘redundancy’ in the case of equipment malfunction.
9.15 If in the case of an emergency on board the aircraft, the aircraft Commander shall communicate to the de-icing teams the requirement for the de-icing process to cease by means of continual flashing of Landing and Taxi Lights fitted to the nose undercarriage leg, or by the passing of a VHF radio message on frequency 135.005 MHz. The de-icing rigs will immediately return to the Safe Zone, immediately followed by the de-icing Pad Controllers vehicle, positioned so that the de-icing rigs and de-icing Pad Controllers vehicle are visible to the aircraft Commander. All vehicles shall then remain in the Safe Zones until advised to move by the aircraft Commander, or by Airfield Operations.
9.16 On completion of the de-icing activity, and following confirmation to the de-icing Pad Controller that the aircraft is free from frozen contamination, each de-icing rig will exit the de-icing pad and return to the Safe Zone positioned so as to be visible to the aircraft Commander, each rig is to be parked with the parking brake applied.
9.17 Only when the all de-icing rigs have returned to the Safe Zone may the de-icing Pad Controllers vehicle then proceed to the Safe Zone, positioned to be clearly visible to the aircraft Commander, with the parking brake applied.
9.18 The de-icing Pad Controller shall immediately pass the required Anti-icing Code via VHF radio on frequency 135.005 MHz to the aircraft Commander.
9.19 Immediately following confirmation of receipt of the Anti-icing Code by the aircraft Commander, the deicing Pad Controller will then advise the aircraft Commander to contact MANCHESTER GROUND on VHF radio on frequency 121.855 MHz.
10.0 EXITING THE REMOTE DE-ICING PAD
10.1 On completion of receipt of the Anti-icing Code the aircraft currently being de-iced will immediately request taxi-clearance via MANCHESTER GROUND on 121.855 MHz for departure.
10.2 Manchester ATC will prioritise remote de-icing pad exit taxi clearances to ensure the continual steady flow to the pad. Aircraft must not cross ITHP Bravo 4 or Bravo 5.
11.0 LOW VISIBILITY OPERATIONS (LVOs)
11.1 In the event of LVOs, access to the de-icing pad will not be permitted. All de-icing will revert to on stand de-icing
 
Last edited:

Remove Advertisements

Subscribe to help support your favourite forum and in return we'll remove all our advertisements. Your contribution will help to pay for things like site maintenance, domain name renewals and annual server charges.



Forums4aiports
Subscribe

Heads Up!

For some weird reason, my days off work tend to involve being out of my flat by 5am and not getting back until 10pm. Back to work and the regular "fix" of 7.40am to 7.15pm hours
Heatwave Mk2 next week?
Some explosive weather build-ups currently in the North of England. What is it like where you are?
LBA: B737-300 G-GDFK empty down to Paris at 16:15 to operate the return LS268 back to Leeds 20:00 ETA where it will then operate the delayed LS265 to Malaga 20:40ETD
LBA: Albastar B737-800 EC-MUB positioning in tommorow afternoon from Gatwick 15:45 to operate a charter to Lourdes/Tarbes on Friday afternoon 14:00 AP7721 STC

Trending Hashtags

Advertisement

Back
Top Bottom
  AdBlock Detected
Sure, ad-blocking software does a great job at blocking ads, but it also blocks some useful and important features of our website. For the best possible site experience please take a moment to disable your AdBlocker.