Finger66
Well-Known Member
I think we also need to remember that some of Jet2's 800s are as old (even older) than some of the 300s. That will mean it's not just 300s that need replacing. Now of course that might not mean anything LBA NEO wise but even if it means just more 800s they will be newer ones which in itself is no bad thing.
As an aside perhaps we are asking for too much too soon. After all terminal regen isn't fully completed, additional stands still to be built (Come a long way from just the 6 I remember when I first got to know LBA), but let's face it, the future is clearly bright but I believe just a little more patience is needed (however much I am equally over eager at present) is required.
It is Yorkshire's Premier (and only) airport after all (Leeds East doesn't count for pax traffic and apologies to all you DSA fans out there - NOT!)
As an aside perhaps we are asking for too much too soon. After all terminal regen isn't fully completed, additional stands still to be built (Come a long way from just the 6 I remember when I first got to know LBA), but let's face it, the future is clearly bright but I believe just a little more patience is needed (however much I am equally over eager at present) is required.
It is Yorkshire's Premier (and only) airport after all (Leeds East doesn't count for pax traffic and apologies to all you DSA fans out there - NOT!)