I believe the plans for 3 carousels were drawn up during the tenure of Dave Laws (once described to me by a senior manager as 'that idiot of a CEO'). He was intent on cutting costs so even if the planning called for more capacity he would reduce it. He even removed lifts to cut cots in one set of plans. Thankfully the current plans look much better and hopefully go ahead.