Re: Infrastructure Developments
Hearing rumours at work, what the Phase 2 plan would include is to simply construct a permanent building over the temporary structure of Hall B, meaning new desks and baggage systems are not required and the area can remain operational. Phase 2 would also include tidying up to the left of the terminal towards stand 9/10 and creating an extension further down to the start of stand 10. All rumours but would make sense.
Hearing rumours at work, what the Phase 2 plan would include is to simply construct a permanent building over the temporary structure of Hall B, meaning new desks and baggage systems are not required and the area can remain operational. Phase 2 would also include tidying up to the left of the terminal towards stand 9/10 and creating an extension further down to the start of stand 10. All rumours but would make sense.