- Thread starter
- Admin
- #1,081
LBA787 said:I have been watching the construction of the walkway for a few months now. Tarn Spotter has correctly pointed out the side walls for some reason don't go all the way to the floor. If this is the finished product then I really don't think the airport have thought it through.
When it snows in the winter months the plough clearing the main airside road will force ice and snow under the gap and into the walkway.... One would hope some sort of side skirt can be added when they make the finishing touches. This would make the whole structure weather proof and far more appealing to the pax.
The rain and snow falling horizontally at LBA is somewhat a problem during the winter months.
( between August and June
There's a good 6 inch gap at the top too.