- Thread starter
- Admin
- #1,121
White Heather said:I would suspect that if they are down there it will be related to drainage. When Hewlett won the contract to do work to the car park, it included a civil engineering job to improve drainage, and if its going to drain to anywhere it will be the beck down there.
You were spot on Heather, Hewlett are installing huge drainage pipes. It looks like a sizeable project, probably one which will go almost unnoticed despite the cost probably involved.
As for the walkway. I used the walkway yesterday and the wind was blowing the rain through the northern side at the top (channel 1). I suspect the same will happen to lane 3 on the western side of the walkway with westerly winds. I am sure some sort of grill similar to what has been used on the base between the lanes would suffice in stopping the rain from coming through. I hope the airport can address this problem to make the experience more pleasant.