- Moderator
- #1,061
Out of "boredom" I checked whether the new Masterplan was on the Airport website. Surprise surprise, it wasn't but looking at the previous one, under proposed access developments, was a link road running along the eastern edge of the airport, very similar to the present proposal.
This was hoped to be in place by 2016!!
This was hoped to be in place by 2016!!