- Moderator
- #981
Procurement for the new HS2 station will begin in the new year. The article below gives a little more detail about the automated people mover.
The APM will connect HS2 to the NEC, the International Station and the airport and will take six minutes end to end with a three minute maximum wait time. It will have a capacity of around 3,900 people per hour in each direction, upgradable to 6,000 by “simply changing the carriages” in a future upgrade.
https://www.newcivilengineer.com/la...rnational-set-for-early-2019/10037253.article
The APM will connect HS2 to the NEC, the International Station and the airport and will take six minutes end to end with a three minute maximum wait time. It will have a capacity of around 3,900 people per hour in each direction, upgradable to 6,000 by “simply changing the carriages” in a future upgrade.
https://www.newcivilengineer.com/la...rnational-set-for-early-2019/10037253.article