No further update on the Air Livery Hangar from my contacts except to confirm the information that I had already heard.
 
OPERATIONAL ADVICE NOTICE (OAN)
ARMISTICE DAY, REMEMBRANCE SUNDAY


OAN REF:- 087/2020 DATE OF ISSUE:- 22/10/20 EFFECTIVE DATE:- 08/11/20 EXPIRY DATE:- 11/11/20

PLEASE ENSURE THIS INFORMATION IS PROMULGATED TO ALL STAFF

1.0 SUMMARY
In keeping with previous years, Manchester Airport is to observe a two-minute silence on Remembrance
Sunday, 8
th November 2020, and Armistice Day, Wednesday 11th November 2020. Suspension of airport
operations for 2 minutes’ silence on these days will occur.
2.0 PROCEDURE
2.1 Sunday 8th November 2020 – 11:00-11:02 (local)
Wednesday 11th November 2020 – 11:00-11:02 (local)
2.2 During the times specified no aircraft shall land or take-off, start or test engines.
2.3 Aircraft will however be permitted to taxi.
2.4 The 2-minute restriction will not apply to aircraft that have declared an emergency.
 
OAN 088-2020
ORGANISED FIREWORK DISPLAYS


OAN REF:- 088/2020 DATE OF ISSUE:- 22/10/20 EFFECTIVE DATE:- 05/11/20 EXPIRY DATE:- 07/11/20

PLEASE ENSURE THIS INFORMATION IS PROMULGATED TO ALL STAFF

1.0 SUMMARY
In order to safely accommodate organised public firework displays in the vicinity of the aerodrome, flight
operations will be suspended for a 15-minute period on both Thursday 5th and Saturday 7th November
2020.
2.0 SCOPE
2.1 This notice has relevance to all airfield users operating on the evenings of Thursday 5th November 2020
and Saturday 7th November 2020.
3.0 PROGRAMME
3.1 An agreement has been reached with local community organisations to undertake all organised firework
displays between 20:15 and 20:30 hrs local on the dates listed at paragraph 2.1.
4.0 OPERATIONAL IMPLICATIONS
4.1 All flight operations will be suspended on both Thursday 5th and Saturday 7th November 2020 between
the hours of 20:15 and 20:30 local. Departing aircraft will be permitted to taxi but not take-off. Inbound
aircraft will not be allowed to make an approach (except in an emergency) and suld anticipate a short
period of air holding. It may be advisable for flights operating into Manchester airport at this time to
carry additional holding fuel.
5.0 PROMULGATION OF INFORMATION
5.1 Flight crews will be advised via NOTAM and by ATC on first contact with Manchester.
 
OPERATIONAL ADVICE NOTICE (OAN)
OAN 089/2020 – TERMINAL 2 IT UPGRADES


OAN REF:- 089/2020 DATE OF ISSUE:- 22/10/20 EFFECTIVE DATE:- 07/11/20 EXPIRY DATE:- 07/11/20
PLEASE ENSURE THIS INFORMATION IS PROMULGATED TO ALL STAFF

1.0 SUMMARY
1.1 A one-day programme of work to carry out upgrades to the Information Technology (IT) infrastructure
affecting Terminal 2.
2.0 PROGRAMME
2.1 Work is scheduled to take place on Saturday 7th November 2020.
2.2 The nominal working hours will be 09:00 to 17:00L.
3.0 SCOPE & LOCATION OF WORKS
3.1 The upgrade will take place in Data Centres 1 and 3 within Terminal 2 (T2), in the R2/3 Substation on the
south side of the airfield and in ‘R’ Substation next to West Gate Security.
3.2 The work will involve reconfiguring the network switches within Data Centres 1 & 2, and R Substation,
and cabling in the R2/3 substation.
4.0 OPERATIONAL IMPLICATIONS
4.1 The works will affect all Terminal 2 extension systems fed by the IT network; these include but are not
limited to: Terminal 2 Extension and Pier, T2 Multi-Storey West Car Park payment station, Little Staff
West Car Park lift intercoms (local alarms will still function), Car Park access/egress barriers, Flight
Information Display Screens (FIDS), WiFi, Fixed Electrical Ground Power (FEGP) Swipe, Common Use
Passenger Processing System (CUPPS) and PremiAir.
4.2 Border Force systems, Digital Radios, emergency Lighting systems, landline phones and Fire Alarm
systems, Terminal 1 and Terminal 3, older areas of T2 including the T2 service yard and T2 staff channel
will not be affected by the upgrade. Furthermore, the upgrades will not cause a loss of power.
4.3 The access control system will store all permit information locally and, therefore, access/egress through
the stand doors will still be available.
4.4 Additional car park marshaller’s will be in place within the carpark to assist during the outage.
4.5 Mitigation has been put in place to ensure that all systems are fully operational at the end of the shift.
5.0 LOW VISIBILITY PROCEDURES (LVP)
5.1 Overall, the work has no impact on the airport’s ability to operate during periods of low visibility.
 
Q) EGTT/QMRLC/IV/NBO/A/000/999/5321N00217W005
B) FROM: 20/11/03 22:30C) TO: 20/11/06 06:00
E) RWY 05L/23R CLSD DUE WIP, ALL FLIGHT OPERATIONS TO USE RWY
05R/23L. THE WIP WILL BE CANCELLED IN THE EVENT OF FORECASTED LVP AND
RWY 05L/23R WILL REMAIN OPEN. FLIGHT CREWS SHOULD CONSIDER
ADDITIONAL FUEL UPLIFT AT ORIGIN DUE POTENTIAL FOR INCREASED AIR
HOLDING.
SCHEDULE: 2230-0600
 
OPERATIONAL ADVICE NOTICE (OAN)
OAN 090/2020 – SCHEDULED RUNWAY 05L-23R
NIGHT-TIME MAINTENANCE & NORTHSIDE TAXIWAY WORKS.


OAN REF:‐ 090/2020 DATE OF ISSUE:‐ 23/10/20 EFFECTIVE DATE:‐ 03/11/20 EXPIRY DATE:‐ 06/11/20
PLEASE ENSURE THIS INFORMATION IS PROMULGATED TO ALL STAFF

1.0 SUMMARY
1.1 Runway 05L‐23R will be closed for three consecutive nights in early November to allow for essential
maintenance works on the runway, within its strip and on associated northside taxiways. All flight
operations will take place on Runway 05R‐23L whilst work is in progress.
2.0 PROGRAMME
2.1 Work will take place on the nights of Tuesday 3rd to Thursday 5th November, inclusive.
2.2 The nightly working hours will be 22:30 – 06:00L.
3.0 SCOPE & LOCATION OF WORKS
3.1 Overall, the three nights of work will include the following tasks:
 Multiple asphalt pavement repairs and over‐banding along the length of Runway 05L‐23R.
 Cut & seal, maxi‐flex, over‐banding and asphalt patch repairs on Taxiway Alpha between Runway
Holding Point (RHP) A1 and the junction with Taxiway Bravo.
 Routine runway maintenance tasks including painted surface marking refreshment, AGL repairs
and AGL bolt checks.
4.0 OPERATIONAL IMPLICATIONS
4.1 Runway Operations
4.1.1 During the Runway 05L‐23R closure periods (22:30‐06:00L) all flight operations will take place on Runway
05R‐23L.
4.2 Taxiway Restrictions
4.2.1 Taxiway Alpha, between RHP A1 and its junction with Taxiway Bravo will be closed between 22:30 and
06:00L on the nights of Tuesday 3rd – Thursday 5th November, inclusive.
5.0 LOW VISIBILITY OPERATIONS (LVO)
5.1 In the event of forecast low visibility, the night works will be cancelled and Runway 05L‐23R will remain
open.
5.2 In the event of un‐forecast reduced visibility conditions (meeting the criteria for LVP Alert) during the
Runway 05L‐23R closure period when work has begun, the aerodrome will close to flight operations
whilst the runway is recovered. An ‘AD Closed’ NOTAM will be issued in such circumstances.
 
OPERATIONAL ADVICE NOTICE (OAN)
OAN 091-2020 – TESTING OF AERONAUTICAL GROUND LIGHTING
(AGL) CONTROL SOFTWARE (PP03)


OAN REF:- 091-2020 DATE OF ISSUE:- 29/10/20 EFFECTIVE DATE:- 03/11/20 EXPIRY DATE:- 05/11/20
PLEASE ENSURE THIS INFORMATION IS PROMULGATED TO ALL STAFF

1.0 SUMMARY
A one-day programme of works to complete the testing of the Aeronautical Ground Lighting (AGL)
control software to allow the future activation of taxiway centreline lighting on Taxiways November-
Alpha and Zulu. The work will take place during daylight hours and will require specific visibility and cloud
ceiling criteria to be met prior to start of works.
2.0 PROGRAMME
2.1 Works are scheduled to take place on Tuesday 3rd November 2020; Wednesday 4th and Thursday 5th November will serve as contingency days should completion of the work suffer a delay.
2.2 Daily working times will be 08:00 – 17:00L.
3.0 SCOPE & LOCATION
3.1 Testing of AGL control software to allow the future activation of taxiway centreline lighting on Taxiways
November-Alpha and Zulu.
3.2 Work will take place in WA6a Substation situated at the head of Stand 929.
4.0 OPERATIONAL IMPLICATIONS (08:30 – 16:30L)
4.1 The AGL on Taxiways November-Alpha and Zulu will be lit at times during testing.
5.0 WEATHER MINIMA
5.1 Work will be postponed if the weather is forecasted to deteriorate below the following minima: Visibility
1500m and/or 1000ft cloud ceiling.
5.2 Should there be a forecast >30% probability of fog the works will be postponed.
 
OPERATIONAL ADVICE NOTICE (OAN)
OAN 092-2020
MASHCo VALVE CHAMBER WORKS


OAN REF:- 092/2020 DATE OF ISSUE:- 04/11/20 EFFECTIVE DATE:- 16/11/20 EXPIRY DATE:- 18/12/20
PLEASE ENSURE THIS INFORMATION IS PROMULGATED TO ALL STAFF

1.0 SUMMARY
A five-week programme of work to install new pipe work into three Valve Chambers and to soak test and
flush out the associated linked section of the fuel hydrant system pipework.
2.0 PROGRAMME
2.1 Overall, the work will commence on the Monday 16th November and will be completed by Friday 18th December 2020.
2.2 Working hours will be 07:30 to 19:00L.
3.0 SCOPE & LOCATION OF WORKS
3.1 The work will involve the following tasks:
• Access to fuel valve chambers and features.
• Hydrant cleaning between VC5 and VC7.
• Pipework installation in VC5, VC6 and VC7.
• Flood up and soak hydrant between VC5 and VC7.
• Opening the valves in the new section of the hydrant system to flush fuel through.

3.2 The work will be located on Stand 72, Stand 807, Stand 809, stand 811 and the road system opposite Stand 104.
4.0 OPERATIONAL IMPLICATIONS
4.1 Aircraft Fuel Hydrant System
4.1.1 The Terminal 2 hydrant system will be depressurised during these works. However, the section of hydrant
affected by the valve chamber works can be isolated to facilitate repressurisation if necessary.
4.2 Stand Restrictions
4.2.1 Any Terminal 2 cargo operations requiring fuel will be parked on stands fed by the Terminal 1 fuel hydrant
system.
4.2.2 Access will be required to fuel hydrant valve chambers located on Stands 72, 807 and 811.
4.2.3 Access to the valve chamber on Stand 72 will be required for approximately two hours. This is
provisionally planned for Wednesday 18th November. If required, an aircraft may be parked on the stand
prior to works commencing in the valve chamber.
4.2.4 The aircraft parked on Stand 811 will be repositioned such as to allow unrestricted access to the valve
chamber (VC7) to the rear of the stand.
4.2.5 If required, an aircraft may be parked on Stand 807 prior to works commencing in the valve chamber (VC6).
4.3 Road Restrictions
4.3.1 Active traffic management will be in place whilst work takes place within the valve chamber in the road
system opposite Stand 104.
5.0 LOW VISIBILITY PROCEDURES (LVP)
5.1 The work will have no effect on the airport’s ability to operate during periods of low visibility.
 
OPERATIONAL ADVICE NOTICE (OAN)
OAN 040K/2020
UPDATED: COVID-19 TEMPORARY OPERATING ARRANGEMENTS


OAN REF:‐ 040K/2020 DATE OF ISSUE:‐ 09/11/20 EFFECTIVE DATE:‐ 11/11/2020 EXPIRY DATE:‐ 02/12/2020
PLEASE ENSURE THIS INFORMATION IS PROMULGATED TO ALL STAFF

1.0 SUMMARY
1.1 Due to the outbreak of COVID‐19 and a consequential reduction in the demand for air travel, revised
airport operating arrangements will be in place up to and including 2nd December 2020. This period may
be extended or reduced if necessary and will be subject to ongoing consultation and notification.
2.0 SCHEDULED ARRIVING FLIGHTS
2.1 Passenger operations will take place from Terminal 1 only.
2.2 The scheduling of arriving flights will be permitted 24 hours each day.
2.3 Arriving domestic flights will be processed via the T3 arrival process.
3.0 SCHEDULED DEPARTING FLIGHTS
3.1 Passenger operations will take place from Terminal 1 only.
3.2 Scheduling of departing flights will only be permitted between the hours of 05:30L – 23:00L. Passenger
security processing will be available from 03:30L – 22:30L.
4.0 EXEMPTIONS
4.1 Flights exempt from the departure scheduling detailed in 3.1 above hours are as follows: ‐
 Aircraft in an emergency
 Cargo Flights
 Technical Landings/Diversions
 Private Flights
 Positioning Flights
4.2 Aircraft operators are permitted to file Manchester Airport as a pre‐planned diversion alternate. With
the exception of aircraft in an emergency, all flights are to seek pre‐authorisation (PPR) from Airfield
Operations on telephone number +44 (0)161 489 3331.
5.0 AERODROME OPERATIONS
5.1 Runway Operations will be available between the following times:
 24 hours a day, 7 days a week
5.2 The Rescue and Fire Fighting (RFFS) will operate as follows:
 Category 7 (categories 8 and 9 will be accepted under remission) – 24 hours a day, 7 days a week
 Category 8 (categories 9 and 10 will be accepted under remission) – by prior arrangement
5.3 Example category 7 aircraft – B737‐800/A320
Example category 8 aircraft – B767
Example category 9 aircraft – B777
Example category 10 aircraft – A380
5.4 Air Traffic Services will operate as follows:
 24 hours a day, 7 days a week
 
Has there been any indication from MAN/MAG that only T1 will remain open post lockdown? I imagine numbers will increase slightly post 18/19th Dec until first week of January for Christmas travel, but I expect until Easter or early/mid April, we won't see a consistent increase...
 
My apologies if some of the following are slightly old, however I am indebted to my contact for providing us with the updates as and when he can.

OPERATIONAL ADVICE NOTICE (OAN)
OAN 093/2020 – SCHEDULED RUNWAY 05L-23R
NIGHT-TIME CLOSURE & TAXIWAY ALPHA REPAIRS.
OAN REF:‐ 093/2020 DATE OF ISSUE:‐ 30/11/20 EFFECTIVE DATE:‐ 08/12/20 EXPIRY DATE:‐ 11/12/20

PLEASE ENSURE THIS INFORMATION IS PROMULGATED TO ALL STAFF

1.0 SUMMARY
1.1 Runway 05L‐23R will be closed for a single night in early December to facilitate essential
maintenance works on Taxiway Alpha in the vicinity of Runway Holding Points (RHP) A1 and AG1. All
flight operations will take place on Runway 05R‐23L whilst work is in progress.

2.0 PROGRAMME
2.1 Pavement repair work on Taxiway Alpha is planned to take place with a concurrent closure of Runway
05L‐23R on the night of Tuesday 8th December 2020.
2.1.2 The nights of Wednesday 9th and Thursday 10th December will be held as contingency in the event of
poor weather preventing work taking place as planned on Tuesday 8th December.
2.2 The planned working hours will be 22:30 – 06:00L.

3.0 SCOPE & LOCATION OF WORKS
3.1 Overall, the single night of work will include the following tasks:
 Cut & seal and maxi‐flex repairs at three locations on Taxiway Alpha in the vicinity of RHPs A1
and AG1.

4.0 OPERATIONAL IMPLICATIONS
4.1 Runway Operations
4.1.1 During the Runway 05L‐23R closure period (22:30‐06:00L) all flight operations will take place on Runway
05R‐23L.
4.2 Taxiway Restrictions
4.2.1 Taxiway Alpha, between RHP A1 and its junction with Taxiway Bravo will be closed between 22:30 and
06:00L on the night of Tuesday 8th December (note the possible need for working on the contingency
nights of Wednesday 9th or Thursday 10th December).

5.0 LOW VISIBILITY OPERATIONS (LVO)
5.1 In the event of forecast low visibility, the planned work on Taxiway Alpha will be cancelled and Runway
05L‐23R will remain open.
5.2 In the event of un‐forecast reduced visibility conditions (meeting the criteria for LVP Alert) during the
Runway 05L‐23R closure period when work has begun, the aerodrome will close to flight operations
whilst the runway is recovered. An ‘AD Closed’ NOTAM will be issued in such circumstances.
 
Last edited:
OPERATIONAL ADVICE NOTICE (OAN)
OAN 094/2020 PAGE 1 OF 17
OAN 094/2020 – ESSENTIAL NORTHSIDE TAXIWAY REPAIRS –
TAXIWAYS ECHO, LIMA & NOVEMBER-CHARLIE.
OAN REF:‐ 094/2020 DATE OF ISSUE:‐ 30/11/20 EFFECTIVE DATE:‐ 06/12/20 EXPIRY DATE:‐ 18/12/20

PLEASE ENSURE THIS INFORMATION IS PROMULGATED TO ALL STAFF

1.0 SUMMARY
1.1 A programme of up to two weeks’ work to carry out essential pavement repairs on portions of Taxiways
Echo, Lima & November‐Charlie. The work will be carried out at night and will move progressively from
abeam Stand 25 northwards to abeam Stand 31.

2.0 PROGRAMME
2.1 Overall, the work will commence on the night of Sunday 6th December and will be completed by the
morning of Friday 18th December 2020. Work will take place Sunday to Thursday nights, inclusive.
2.2 The above programme dates include contingency nights to be used in the event of poor weather
restricting works progress.
2.3 The nominal nightly working times will be 22:30 – 05:30L.

3.0 SCOPE & LOCATION OF WORKS
3.1 The programme of work will entail carrying out several types of repair at multiple locations on Taxiways
Echo, Lima & November‐Charlie.
3.2 Overall, the required work will commence on Taxiway Lima, abeam the rear of Stand 25 and will generally
progress northwards along Taxiway Echo and a small portion of Taxiway November‐Charlie as far as the
rear of Stand 31. See attached drawing showing overall expanse of works
3.3 Various types of pavement repair will be used, including:
 Maxi‐crete.
 PQX concrete.
 Cut & Seal.
 Asphalt patch.

4.0 OPERATIONAL IMPLICATIONS
4.1 Taxiway Restrictions
4.1.1 Whilst night‐time work is in progress on Taxiways Echo, Lima & November‐Charlie, localised portions of
taxiway will be closed, as required.
4.1.2 Nightly closed portions of taxiway will be demarked by lit, mobile barriers and extinguished taxiway
centreline lighting.
4.2 When working locations allow, Taxiway Quebec will be available as a by‐pass route for aircraft.
4.2.1 Taxiway Quebec has an unlit painted yellow centreline, therefore, night‐time aircraft movements along
Taxiway Quebec will be guided by an Airfield Operations Follow‐Me vehicle.
4.2.2 There will be several pavement repair locations which will also require the closure of Taxiway Quebec.
The timing of repairs in these locations will be coordinated between the contractor and Airfield
Operations such that they are carried out during periods of zero planned aircraft movements.
4.3 Aircraft Parking Stand Restrictions
4.3.1 The nightly working hours and locations will be coordinated such that planned aircraft arrivals onto Pier
C Stands 21‐32 (those immediately impacted by the work) will be unaffected, however, it should be noted
that once aircraft are parked on Stands 21, 23, 25, 27, 29 and 31, they may need to remain in‐situ until
completion of pavement repair work the following morning.
4.3.2 In the event of an aircraft needing to be pushed back off a stand in the vicinity of, but not immediately
affected by ongoing works, there may be a requirement for a non‐standard pushback manoeuvre to be
carried out, as directed by ATC.
4.4 Apron Road System
4.4.1 Within the overall works programme there will be up to three working nights during which the portion
of apron road crossing Taxiway Echo between West Gate and the rear of Stand 29 will be either restricted
to one operational lane or closed entirely.
5.0 LOW VISIBILITY OPERATIONS (LVO)
5.1 The work will have no impact on the airport’s ability to operate during periods of low visibility.
5.2 In the event of forecast reduced visibility conditions (meeting the criteria for LVP Vis) the planned night
work will be cancelled.
5.3 In the event of un‐forecast reduced visibility conditions(meeting the criteria for LVP Vis) prevailing whilst
work is already underway, all work will be curtailed at the earliest opportunity.
 
OAN 095/2020 -
TEMPORARY AERODROME CLOSURE & SUSPENSION OF OPERATIONS.
OAN REF:‐ 095/2020 DATE OF ISSUE:‐ 01/12/20 EFFECTIVE DATE:‐ 02/12/20 N/A EXPIRY DATE:‐ 02/12/20

PLEASE ENSURE THIS INFORMATION IS PROMULGATED TO ALL STAFF

1.0 SUMMARY
A fifteen‐minute aerodrome closure and suspension of all aircraft operations, including ground
movements will take place from 13:10L on Wednesday 2nd December to facilitate essential electrical
maintenance to the Air Traffic Control Tower building. There will also be a thirty‐minute period of zero
flow rate applied from 13:10L.

2.0 SCOPE
2.1 This notice has relevance to all airfield users operating on the afternoon of Wednesday 2nd December
2020.

3.0 PROGRAMME
3.1 The aerodrome will temporarily close and all operations will be suspended for a fifteen‐minute period
from 13:10L on the afternoon of Wednesday 2nd December.
3.2 Additionally, a thirty‐minute period of zero flow rate will be applied from 13:10L on Wednesday 2nd
December.

4.0 PURPOSE
4.1 The purpose for the temporary aerodrome closure is to allow for electrical testing work to take place in
the Air Traffic Control Tower building, prior to a planned programme of essential, high voltage electrical
maintenance work.
5.0 PROMULGATION OF INFORMATION
5.1 Flight crews will be advised via NOTAM and ATC will introduce a thirty‐minute zero flow rate for the
duration of the electrical testing.
 
OPERATIONAL ADVICE NOTICE (OAN)
OAN 096/2020 – INTRODUCTION OF NEW REMOTE STANDS 925-929.
OAN REF:‐ 096/2020 DATE OF ISSUE:‐ 03/12/20 EFFECTIVE DATE:‐ 18/12/20 EXPIRY DATE:‐ N/A

PLEASE ENSURE THIS INFORMATION IS PROMULGATED TO ALL STAFF

1.0 SUMMARY
1.1 Three new remote stands, namely 925, 927, 929 are to be introduced into service.

2.0 PROGRAMME
2.1 New Stands 925, 927 and 929 will be introduced into service on Friday 18th December 2020.

3.0 LOCATION
3.1 The new stands are located off Taxiway Zulu, in the area of the former Stands 73 and 74.

4.0 STAND CAPABILITY
4.1 The new stands will be capable of accommodating aircraft up to a maximum size of ICAO Code C (36m
wingspan ‐ B737/ A321).
4.2 All new stands will be equipped as follows:
 Aircraft fuel hydrants.
 Apron mounted, single output Fixed Electrical Ground Power units (90KVA).
 FOD bins, emergency telephone and fire extinguisher.
N.B: Due to ongoing consolidation of operations due to Covid‐19, the portion of the aircraft fuel hydrant
system serving the Western Apron (including the new stands) is currently switched off.
4.3 Aircraft docking on all new stands will be via Safedock AVDGS.
5.0 AIRCRAFT PUSHBACK PROCEDURES
5.1 Standard aircraft pushback procedures for the new stands are already included within the current
Manchester Airport Aircraft Pushback Procedures document (Rev B).
 
OPERATIONAL ADVICE NOTICE (OAN)
OAN 097-2020 - AIRCRAFT FUEL HYDRANT VALVE CHAMBER WORKS.

OAN REF:‐ 097/2020 DATE OF ISSUE:‐ 15/12/20 EFFECTIVE DATE:‐ 11/01/21 EXPIRY DATE:‐ 02/02/21
PLEASE ENSURE THIS INFORMATION IS PROMULGATED TO ALL STAFF

1.0 SUMMARY
A circa four‐week programme of work to install new pipework into three aircraft fuel hydrant valve
chambers and to soak test and flush out the associated section of the fuel hydrant system pipework.
2.0 PROGRAMME
2.1 Overall, the work will commence on the Monday 11th January and will be completed by Tuesday 2nd
February 2021.
2.2 Daily working hours will be 07:30 to 19:00L.
3.0 SCOPE & LOCATION OF WORKS
3.1 The scope of work will involve the following tasks:
 Access to aircraft fuel valve chambers (VC) and features.
 Access to fuel vent (V11) located on Taxiway Echo abeam Stand 72.
 Hydrant cleaning between VC5 and VC7.
 Pipework installation in VC5, VC6 and VC7.
 Flood up and soak hydrant between VC5 and VC7.
 Opening the valves in the new section of the hydrant system to flush fuel through.
3.2 The work will be located on Stands 72, 807‐811 and the apron road system opposite Stand 104.
4.0 OPERATIONAL IMPLICATIONS
4.1 Aircraft Fuel Hydrant System
4.1.1 The Terminal 2 aircraft fuel hydrant system will remain depressurised during these works due to the
ongoing consolidation of aircraft operations into Terminal 1. However, the section of hydrant system directly
affected by the valve chamber works can be isolated to facilitate re‐pressurisation of the Terminal 2 system, if necessary.
4.1.2 The section of the aircraft fuel hydrant system serving Terminals 1 and 3 will be unaffected by this work.
4.2 Stand Restrictions
4.2.1 Any Terminal 2 cargo operations requiring aircraft fuelling will be parked on stands fed by the Terminal
1 fuel hydrant system.
4.2.2 Access will be required to aircraft fuel hydrant valve chambers located on Stands 72, 807 and 811.
4.2.2.1 The above stands will be closed whilst work is in progress, however any aircraft already parked on stand
may remain in‐situ.
4.2.2.2 If the stands are required for aircraft parking, aircraft must be manoeuvred onto stand prior to the start
of works and must remain on stand until the completion of works each day.
4.3 Apron Road Restrictions
4.3.1 Active traffic management will be in place whilst work takes place within the aircraft fuel hydrant valve
chamber (VC5) located in the apron road system opposite Stand 104.
5.0 LOW VISIBILITY PROCEDURES (LVP)
5.1 The work will have no effect on the airport’s ability to operate during periods of low visibility.

View attachment 21239
 
The NOTAMs are showing the terminal being closed for departure at 1700hrs,

Q) EGTT/QFALT/IV/NBO/A/000/999/5321N00217W005
B) FROM: 21/01/20 00:01C) TO: 21/02/15 23:59
E) SCHEDULING OF DEPARTING PASSENGER FLIGHTS WILL ONLY BE PERMITTED
BTN 0700-1700 DUE TERMINAL SECURITY OPERATING HOURS. SCHEDULED
INBOUND PAX PERMITTED BTN 0401-2200. THIS RESTRICTION DOES NOT
AFFECT THE FOLLOWING:
1. ACFT IN STATE OF EMERGENCY
2. CARGO FLIGHTS
3. TECHNICAL LANDING
4. PRIVATE FLIGHTS
5. FERRY FLIGHTS.
EXCEPT ACFT IN EMERGENCY THE EXEMPTED FLIGHTS ARE TO SEEK
PRE-AUTHOURISATION (PPR) FROM THE AD OPERATOR TEL+44 (0) 161 489
3331. AIR OPERATORS MUST ENSURE GROUND HANDLING SUPPORT IS AVBL AT
ALL TIMES.
 
I see, out of interest, that Ethiopian appear to have an exemption to the 1700hrs timing restriction. The ET729 was still showing as a scheduled departure of 1855 and actually left, according to FR24, at 1923hrs. Good to see that commonsense might have prevailed at the airport.
 
OAN 001/2021

UPDATED: COVID-19 TEMPORARY OPERATING ARRANGEMENTS

OAN REF:- 001/2021 DATE OF ISSUE:- 15/01/2021 EFFECTIVE DATE:- 20/01/2021 EXPIRY DATE:- 15/02/2021

PLEASE ENSURE THIS INFORMATION IS PROMULGATED TO ALL STAFF

1.0 SUMMARY
1.1 Due to the ongoing COVID-19 situation and a substantial reduction in demand following the introduction
of a national lockdown, revised airport operating arrangements will be in place until 15th February 2021.
This period may be extended subject to the ongoing national situation.
2.0 SCHEDULED ARRIVING FLIGHTS
2.1 Passenger operations will take place from Terminal 1 only.
2.2 A scheduling restriction will be applied between the hours of 22:01L and 04:00L daily, therefore the
scheduling of arriving flights will be only be permitted between 04:01L and 22:00L daily.
2.3 Arriving domestic flights will be processed via the T3 arrival process.
3.0 SCHEDULED DEPARTING FLIGHTS
3.1 Passenger operations will take place from Terminal 1 only.
3.2 Scheduling of departing flights will only be permitted between the hours of 07:00L and 17:00L daily.
3.3 Passenger security processing will be available between 05:00L – 17:00L only
3.4 In exceptional circumstances, departures maybe scheduled up to 17:30L, subject to the approval of the
Airport Operator.
4.0 EXEMPTIONS
4.1 Flights exempt from the arrival and departure scheduling restriction detailed in 2.2 and 3.2 are as follows:
• Cargo Flights
• Private General Aviation Flights operating through private terminal facilities
• Positioning, Training and Maintenance Flights
4.2 Aircraft operators are permitted to file Manchester Airport as a pre-planned diversion alternate. With
the exception of aircraft in an emergency, all flights are to seek pre-authorisation (PPR) from Airfield
Operations on telephone number +44 (0)161 489 3331.
5.0 AERODROME OPERATIONS
5.1 The aerodrome will remain operational 24hrs each day.
5.2 The Rescue and Fire Fighting (RFFS) will operate as follows:
• Category 7 (categories 8 and 9 will be accepted under remission) – 24 hours a day, 7 days a week
• Category 8 (categories 9 and 10 will be accepted under remission) – by prior arrangement
5.3 Example category 7 aircraft – B737-800/A320
Example category 8 aircraft – B767
Example category 9 aircraft – B777
Example category 10 aircraft – A380
5.4 Air Traffic Services will operate as follows:
• 24 hours a day, 7 days a week
6.0 EMERGENCY PROCEDURES
6.1 • Emergency notification and alerting revert to normal operations:
o Via RTF to ATC
o By calling 0161 489 2222 or 2222 from an internal phone
7.0 GROUND HANDLING, FUEL & ANCILLARY ACTIVITIES
7.1 All aircraft operators must ensure Ground Handling and Into-plane fuelling support is available at all
times.
7.2 Fuel will only be available on T1 and T3 stands with the exception of remote stands 61 – 65.
 

Remove Advertisements

Subscribe to help support your favourite forum and in return we'll remove all our advertisements. Your contribution will help to pay for things like site maintenance, domain name renewals and annual server charges.



Forums4aiports
Subscribe

Heads Up!

For some weird reason, my days off work tend to involve being out of my flat by 5am and not getting back until 10pm. Back to work and the regular "fix" of 7.40am to 7.15pm hours
Heatwave Mk2 next week?
Some explosive weather build-ups currently in the North of England. What is it like where you are?
LBA: B737-300 G-GDFK empty down to Paris at 16:15 to operate the return LS268 back to Leeds 20:00 ETA where it will then operate the delayed LS265 to Malaga 20:40ETD
LBA: Albastar B737-800 EC-MUB positioning in tommorow afternoon from Gatwick 15:45 to operate a charter to Lourdes/Tarbes on Friday afternoon 14:00 AP7721 STC
I don't believe I am quite covering enough roles at work. Its now 4 on a bad day, 5 on a good day and there is scope for a 6th and 7th role. Still on minimum pay but had the biggest payrise in the company,

Trending Hashtags

Advertisement

Back
Top Bottom
  AdBlock Detected
Sure, ad-blocking software does a great job at blocking ads, but it also blocks some useful and important features of our website. For the best possible site experience please take a moment to disable your AdBlocker.