Will be interesting to see thoseThere are a couple of images I've mist off which show more of the internal layout of the old parts of the terminal. I'll add them later today.
You wont find them on the LCC planning portal because the airport doesn't need to apply for planning for the internal changes.Those are some interesting images. Do you know if these are going to be available on the LCC planning portal? I have had a search but cannot find anything recent.
It would be good to see the labels for the proposed sections.
Not sure what exactly which rooms in the CSZ you mean, but I do know that instead of having officers at the side of the lanes viewing the x ray screens, these are all going to be located in an adjacent office, remote from the screening area where they can be viewed in a quiet area. Presumably at least one of the adjacent rooms will be for that purpose.That would make sense. I am interested in what the proposed new rooms are in the new CSZ and baggage make up area.
They look like crew rooms. I suppose there's also the possibility of a new C corridor.Apologies, I meant the new baggage offload area. There appears to be a series of offices or rooms in the top right of the above plan. I don't remember this area having as much allocated as it appears now.
If you mean the corridor along the terminal front ( car park side) then yes, it would seem so. It will be departing passengers only though. Entry to the Screening Zone midway with Check In A and B heading towards it in opposite directions from each endThey look like crew rooms. I suppose there's also the possibility of a new C corridor.
@White Heather Am I correct in thinking the arrival and departure corridor which runs the length of the terminal is to remain intact and connect to the new arrivals facility?
No I meant the apron side.If you mean the corridor along the terminal front ( car park side) then yes, it would seem so. It will be departing passengers only though. Entry to the Screening Zone midway with Check In A and B heading towards it in opposite directions from each end
Looks that way, but no longer used by passengers.No I meant the apron side.
The way I interpret the plans, the airside corridor remains and links to a ground floor corridor leading to immigration. If this is correct, it's a smart move.Looks that way, but no longer used by passengers.
Entry to the Screening Zone midway with Check In A and B heading towards it in opposite directions from each end
There will 5 international baggage belts and 1 domestic belt. You can see the 5th belt over to the left of the diagram.I thought the new layout was to have 5 international baggage belts? Or is it 5 in total including domestic?