Yes Galaxy/rmac, this is the railway spur from Horsforth to the airport, which should then be extended through to Guiseley, providing airport links not only from the Leeds/Harrogate/York line, but also the Leeds/Ilkley and Bradford/Ilkley lines. Due to the gradients involved, it would be far more difficult to dig a normal rail line up to the airport from either line, but a tram train is capable of climbing up steeper gradients. It also has the advantage that it can come off the heavy rail system when it gets into City Centres and can run through the streets as a tram, before going back on the train lines again. Really this would be the perfect scenario, allowing the tram train to operate through City streets, but then back on the railways, and up/down steep gradients in the way trams can.
The 10 year minimum to develop it is due to the red tape involved in getting the necessary funding for schemes such as this, and the compulsory purchase orders to obtain the land to build on. The airport has reserved its own land for the tram train and a station, so that is already there and will not be developed for other purposes. The tram train system also has to be trialled for some time as it is a light rail system using a heavy rail track. It is not technology in use in this country but has been used abroad for some time. Even so I believe it has to be tested over an extended period on a trial line. Originally this was going to happen on the Hudderfield - Penistone line, although I am not sure if that is still happening or not now. In the meantime, the emphasis is on improving bus links to the airport from Leeds, Bradford, York etc.
Whatever system of transport was used, the same funding and CPO issues would arise. At least now the Leeds City Region has accepted the need is there and committed to taking it forward.