The new master plan
It has been announced recently that the airport is to consult with local interests and partners later this year as it looks to update its master plan that was published in 2006. The local news media has suggested that the eventual target will be 15 mppa and I've even heard 20 mppa mentioned but, given the constricted site, it's difficult to see how that many passengers could be squeezed in.
From the remarks of the airport CEO in an aviation magazine this month, there seems to be no intention to extend the runway and the CEO also said that all future commercial development would remain on the north side which is a change from the existing master plan's consideration of a second terminal (with associated taxiway) on the south side. This must surely mean more extensions to the current terminal building in the future.
BRS has seemed in a state of continual physical development for the past 20 years, with a noticeable acceleration in recent years with £160 million expended since 2010 on various enhancements.
The first obstacle to be overcome in order to to get beyond 10 mppa is the removal of that passenger limit currently set by its planning consents. Given the importance of the airport to the local economy I don't foresee too many difficulties although no doubt the usual suspects will be extremely vocal in their opposition.
More parking space for aircraft is another obvious necessity if passenger numbers are to continue to increase significantly. Outline planning permission is in place (so far as I know) for the demolition of the old terminal and the construction of new stands with a connecting walkway in its place. A new admin block would have to built though.
Perhaps of more immediate interest is the question of how the airport will continue to grow its passenger numbers next year and the year after. 2018 sees an expansion of Thomas Cook and TUI services and easyJet may well base a 15th aircraft, which would continue the practice at BRS since the five-year agreement was signed and which has led to an additional based aircraft both last summer and this summer.
Rumours still circulate about Jet2 and (perhaps less so) about Monarch. There are also rumours about Jet2 and CWL and, after the Qatar decision, they cannot be dismissed easily.
Without going into a discussion about BRS or CWL vis-a-vis Jet2 let us take for the purpose of debate a Jet2 based presence at BRS (with the assumption that space could be found for them). For starters, would the airport be falling over backwards to attract them? The CEO commented to the aviation magazine that the airport's preference is to 'work very hard with our existing customers and only add airlines when it makes sense'. The airport only adds capacity where there is a 'demonstrable need and demand' which, he said, 'works much better than overlaying additional capacity on top of existing capacity'.
So the obvious question is, would a Jet2 (or Monarch) base be meeting that demonstrable need and demand or would it dilute easyJet, Ryanair, TUI and Thomas Cook to an unacceptable degree to those airlines? Can BRS continue to expand its route portfolio and passenger numbers relying mainly on its existing principal airline partners?