They need to install a seriously good hot air curtain then overhead those doors for use when it is cold.
Follow along with the video below to see how to install our site as a web app on your home screen.
Note: This feature may not be available in some browsers.
I see the airport are now openly advertising on and taking bookings for the 3 new lounges that have been built in the terminal extension area
https://book.leedsbradfordairport.co.uk/book/LBA/MultiPurchase
We don’t have anyone who wants to pay to do this so it is unlikely to happen.
Hello all, thought i would join forums4airports as ive been following the lba forums for years but never joined! my names craig and im a big lba fan. was brought up in yeadon before i finally got my own place in guiseley. i now live on baildon moor, underneath the common flight path during runway 32 takeoffs. Just following on from your comments on here, Just 300metres more runway at the horsforth end and move the touch down point back to where it originally was and all problems solved! It would open the airport up to most of the us,middle east etc
Welcome to the forum fight2win and a very valid point. However just to add some realism to this if they were to push the 32 threshold back 300 metres this would lower the aircraft on final approach thus probably increasing the complaints.
Welcome to the forum fight2win and a very valid point. However just to add some realism to this if they were to push the 32 threshold back 300 metres this would lower the aircraft on final approach thus probably increasing the complaints.
Does anyone know whether any airports exist with 2 touchdown areas? All hypothetical and highly unlikely I know but could it work to have landing rules whereby in 'average/normal/good' weather conditions a plane that could land without any issues where they do now has to use the existing touchdown area. However, if weather conditions or size of aircraft dictates the new touchdown area on the newly extended bit of runway could be used.
Doing this would keep the majority of flights at their existing height and approach angle over Horsforth however the option would be there if required. Or would it cause confusion and be an accident waiting to happen??
Farnborough has 2 thresholds to accommodate large aircraft for the Air Show!
The driving force for the runway extension at LBA was the need to provide a Runway End Safety Area at the Horsforth end. The CAA was threatening to remove the dispensation to operate without one, effectively shortening the runway. Extending towards the North West enabled the RESA to be provided and by further displacing the threshold full CAT3 lighting was installed. As a bonus for the nimbys aircraft would also be higher on approach.
If you look closely on Google Earth, or drive along Scotland Lane you will see how near the start of the approach lighting is to the houses. Moving it would be contentious to say the least!
Perhaps the solution to the threshold issues lies in advances/changes in ILS/lighting technology for CAT3 operations. The airport Masterplan paragraph 3.3.2 states 'with enhancements to the existing navigation infrastructure, the runway offers sufficient length to serve short and long haul destinations'. Perhaps the management knows best after all!
.