This is currently just a proposal but we are expected to learn more about the future of the scheme early in the new year (2024)

Here are some renders of the scheme:
WYCA%20proposed%20station%202.jpg


Aerial_View.jpg_5ad694cc4534f345cadb232b4246838d


Leeds-Bradford-Airport-3-1024x623.jpg
 
  • Thread starter
  • Admin
  • #3
That arrivals concourse s a ticket office! Somehow, I think not!
I would be nice if they could manage to get it built a Costa though?

I figured we should have a dedicated thread for any updates. The Infrastructure Developments thread and the Road, Rail & Access threads are a bit too generic for this proposal if it ever comes to fruition.
 
You can see the tunnel portal so I wounder if the stone footbridge just south of the tunnel will be replaced , as a train driver who drives the Harrogate line it be fun and games this time of year trying to stop there, as the Harrogate line is well known to be one of the slippiest lines in the country in leaf fall season 🤣🤣
 
Engaging nerd mode. The unit looks like a Longsight (Manchester) based 323 EMU. The last units ever built at Hunslet works. Electrification might therefore be being considered. Nerd mode cancelled.
We can only hope. However, this is Yorkshire so we'll probably be having to stick to the Sprinters, Turbostars and whatever Northern get next. It would be amazing though
 
  • Thread starter
  • Admin
  • #8
You can see the tunnel portal so I wounder if the stone footbridge just south of the tunnel will be replaced , as a train driver who drives the Harrogate line it be fun and games this time of year trying to stop there, as the Harrogate line is well known to be one of the slippiest lines in the country in leaf fall season 🤣🤣
I thought you were getting new brushes or something attached to remove the leaves?
 
Considering today's rainy weather I hope they don't build it without at least partially covered platforms...

Imagine a family of four with suitcases.. they can't wait in the building till the last minute then run down the stairs when the train arrives. They'll have to stand on the platform getting lashed with rain.

Additionally risk of overcrowding in the building on rainy days...
 
Considering today's rainy weather I hope they don't build it without at least partially covered platforms...

Imagine a family of four with suitcases.. they can't wait in the building till the last minute then run down the stairs when the train arrives. They'll have to stand on the platform getting lashed with rain.

Additionally risk of overcrowding in the building on rainy days...
If it does go ahead the plans will probably get watered down so it ends up looking more like the Apperley Bridge station.

View media item 3765View media item 3753View media item 3757View media item 3760View media item 3693
 

Lack of progress on LBA Parkway station as reported by. the Rail Magazine https://www.railmagazine.com/features-landing/little-headway-on-lba-parkway

Little headway on Leeds Bradford Airport parkway station​

A rail link to Leeds Bradford Airport remains a distant proposition. ANDREW MOURANT reports on the lack of tangible progress.

Few infrastructure projects make better sense than improving public transport to busy airports.

Doing so to those of Bristol, Glasgow, and Leeds/Bradford - all stuck out on a limb without a rail link - has long been a hot topic of debate.

At least the latter has one thing in its favour: its location close to the Leeds/Harrogate line.

The A65 north-west of Leeds is forever clogged up with commuter traffic and that of air travellers. Plans first announced in 2016 by West Yorkshire Combined Authority (WYCA) to create a Leeds Bradford Airport (LBA) parkway station north of Horsforth therefore made perfect sense.

These were shaped against a backdrop of over four million passengers travelling through LBA in 2018, with forecasts that this number would double by 2050.

WYCA was bullish about the concept. “A transformational step change for public transport,” it declared.

Alas, no such transformation has taken place - and there are no guarantees that it ever will.

Five years ago, there appeared to be a road map pointing to LBA Parkway opening in 2024, but now all is shrouded in doubt. There have been barely any public updates, and smatterings of public information shed little light.

In 2023, with nothing visible having happened, WYCA emerged from its shell, stating: “The scheme is currently progressing a full business case, with the aim to submit to our assurance team by the end of the year. Subject to approvals, further detailed design will take place and planning application will be sought in 2024, with the delivery phase starting after.”

Another two years of silence followed until, in July this year, WYCA issued the following update: “The scheme is… going through an assessment of deliverability and affordability in response to rising costs for project delivery. We’ll have a clearer understanding of the timeline for our next steps upon completion of this activity.”

This smacks of a scheme that has stalled and may yet wither on the vine. But why? RAIL resorted to the Freedom of Information (FoI) Act seeking answers.

The issue of whether or not the station gets built preoccupies many local air travellers, and matters greatly to LBA Chief Executive Vincent Hodder.

In February 2020, an Outline Business Case for the station was discussed at a WYCA meeting. Then, the estimated cost was £41.98 million.

As the scheme’s promoter, WYCA was seeking £4.5m from Leeds Public Transport Improvement Programme (LPTIP) for land acquisition (£2.7m), with the rest earmarked for developing a full business case. The station’s Cost:Benefit Ratio (CBR) was calculated at 4.3:1 - “very high value for money”, according to Department for Transport criteria.

And the latest cost estimate? WYCA told RAIL this is now between £50.3m and £67.5m, based on the initial findings of “a minimum viable product exercise” undertaken by Network Rail.

So, much uncertainty remains about the final bill, with those variables being “confirmation of the scope and design, stakeholder requirements, and the findings of ground surveys on land outside the authority’s ownership”.

To date, almost £5m (£4,950,500 to be precise) of LPTIP funding has been spent on aspects such as land purchase, along with £592,250 of West Yorkshire-plus Transport Fund money on taking the scheme to ES4 stage (design standards approved and approval in principle). But the business case development being worked on in 2023 remains a work in progress.

In 2020, WYCA leaned towards the option of a station with a 350-space car park, shuttle bus connection to the airport terminal, and 1.2km of new highway links.

The principal stumbling blocks were: affordability, with only £5m of the £42m estimate funded; capacity issues on the Harrogate line that might supress demand for rail travel in the corridor; and difficulties getting planning permission for a park and ride site in the Green Belt.

The Cost:Benefit Ratio, about which WYCA was so chipper in 2020, no longer holds good five years later.

CBR for the station is yet to be reviewed,” WYCA admits.

“This will be re-run… responding to the final outcomes of the minimum viable product exercise.”

WYCA blames the high price (whatever that turns out to be) of delivering LBA Parkway on “rising rail industry costs, technical site constraints, and inflationary increases more generally”.

Meanwhile, the current exercise in assessing deliverability and affordability is destined to grind on until summer 2026.

In June this year, LBA opened a £100m terminal extension, increasing space for passengers by 40% and adding three boarding gates.

These improvements were much needed, given that 2024 saw a 5.8% rise in users compared with 2023, with 4.24 million people taking almost 32,000 flights.

Work is now under way to refurbish the existing terminal. By late August 2025 (the busiest single month in LBA’s history), the airport had already welcomed over three million flyers.

Hodder is in regular contact with the CEOs of Bradford and Leeds City Councils, both members of WYCA. There has been much talk of developing a business zone on land near the station site owned by both councils.

“A new station is an element of that strategy, and also makes it easier to get to the airport from distances further away,” he says.

Ed Whiting is obsessed with delivering this station. It doesn’t need to be an architectural marvel… we’re not looking for the Taj Mahal.”

As LBA has undergone expansion, Hodder has built up a network of construction and architect contacts. It has led him to question the costs cited by WYCA.

“I had a conversation with one of our contractors who builds stations for NR all the time, and who reckons we could build one and get significant change out of £30m,” he says.

He also believes WYCA is taking fundamentally the wrong approach.

“They should start by saying how much is the benefit, and then ask: ‘what is the maximum amount we can pay to make it make sense?’”

Hodder has “concrete ideas” around a different way to approach building the station, but is reluctant to be drawn further as these are “still in the early stages of feasibility”.

The plans remain for two trains per hour to serve the airport station. Capacity issues raised by WYCA five years ago remain. There are constraints on the slow track between Harrogate and Leeds.

“But you can speed up the line, according to Network Rail. That would cost single-digit millions,” says Hodder.

Part of the price, however, might be to drop some stops at small stations such as Starbeck, Pannal or Hornbeam Park.

He doesn’t think overcrowding would become a problem: “Rush hour and peak airport user numbers don’t overlap - the latter would be earlier in the morning and afternoon.”

So far, no demand for night-time services has been factored in, although Hodder brushes that aside.

“If we get the station built, we may be able to slip those in later,” he says.

Many with Yorkshire pride find it galling that there’s a direct rail link from Leeds city centre to Manchester Airport, but not to the one on its doorstep.

“We very much support the new station - connectivity is a huge issue in West Yorkshire,” says Mark Casci, head of representation and policy for West and North Yorkshire Chamber of Commerce.

While LBA has the reputation of being largely a “bucket and spade” airport for holidaymakers, the chamber is trying to stimulate interest in longer-haul routes - for example, to cater for “the huge diaspora” from South Asia. The runway could cope easily with larger aircraft.

The chamber is raising this at trade missions abroad - for example, in the US. And it expects to do so again in Saudi Arabia and Bahrain later this year.

Casci thinks LBA lags behind Manchester in part owing to its legacy of co-ownership by five local metropolitan councils. He believes the terminal expansion might start to address its image problem and improve public perceptions.

As for LBA Parkway, what does he make of its painfully slow grind through WYCA?

“I think airports struggle to attract political support because of concerns over emissions,” he says.

“But sustainable aviation will come - we need to look at it in the long term. You can’t go back to the steam age.”

And yet it’s not impossible that WYCA might scrap LBA Parkway altogether.

“As with all projects… delivery is subject to receiving consents and approvals, including approval of the full business case,” the authority says.

“Decisions… must also consider affordability in the context of the wider capital programme and regional priorities, and the finite funding available.”

The scheme in detail

The roads of north-west Leeds are congested (especially at peak hours) and are mainly single carriageway.

“Improved highway access solely provided by a link road is not a long-term sustainable solution,” West Yorkshire Combined Authority said back in 2020.

“It is also of paramount importance that … there’s sufficient access to the rail network so more people can reach Leeds city centre

A new direct rail link to the terminal was always going to be too costly, so the alternative was guided by the 2016 feasibility study carried out by civil engineers Atkins.

This concluded that the only realistic site lay between Horsforth and the southern portal of the Bramhope Tunnel. Although presenting topographical and highway access problems, anywhere north of the tunnel would be more remote, both from the airport and population centres.

The plan was (and remains) for a shuttle bus service to the airport from LBA Parkway. There would be two trains per hour, one serving passengers travelling to and from Knaresborough and York.

The new station would have two platforms with waiting rooms. Platform access would be via covered stairways or lifts, as (given the site’s topography) platforms would sit below the station building.

An overbridge would give cross-platform access and lead to a pedestrian and cycle access route to the residential area of Cookridge. A new spur road would connect the station to Scotland Lane.

The full business case was to have been made by 2021, construction started in May 2022, and the station completed by April 2024 - a timeline based on “current assumptions, and subject to available funding, obtaining the necessary consents and approvals, and land assembly.”

For reasons best known to itself, many details of WYCA’s plans were kept secret. Its report of six years ago is peppered with baffling redactions.

Cost estimates for the station were produced by Faithful & Gould, a subsidiary of Atkins, using “industry rates, standard GRIP process allowances, and outturn costs from recent new station schemes”.

Commercial and management issues - “adequately presented but constrained” - were to be considered “indicative”.

Secrecy surrounded such matters as: the predicted price of construction works; assumed overheads and profit; cashflow; project; land assembly and procurement costs; contingency; surveys; and the likely cost of inflation.

WYCA said the scheme would be expected to yield “a small surplus” over its first three years of operation, but gave no hint of what that might be.

Passenger demand calculations were also blanked out, although the report concluded that airport traffic would account for 40% of total demand at LBA Parkway.

Even estimated rail journey times were redacted, too. The report did, however, declare that “large journey time savings” would accrue for new users.

One option mulled over five years ago was for WYCA to enter into a design and build contract with Network Rail. WYCA also contemplated seeking significant third-party investment.

This could see delivery, and the associated risks transfer… with WYCA to retain responsibility for the workstream and leading on delivering a timetable.”

With only £5 million of the projected £41m cost in place, the big hurdle was finding the rest.

WYCA hoped that the prospect of fares exceeding operating costs might open avenues, and that there could be the potential to borrow against future revenue - for example, from car parking. Also floated was the idea of seeking money from Leeds Bradford Airport.

As “funder of last resort”, the authority would have to cover any cost overrun, so it wasn’t hard to see the appeal of offloading some of the delivery risk.

But WYCA’s recent record of joint ventures isn’t a happy one, as the non-completion of White Rose station in south-west Leeds illustrates only too well.
 
It's behind a pay wall.

But my two cents are - the whole line or at least up to Harrogate for now needs electrifying. They need desperately to get on with this LBA train station as it would act as a relief for Horsforth as many Cookridge residents would be able to walk to the new parkway station. Could argue it would create demand at Horsforth as new customers would now use Horsforth as they can get parked.

Horsforth needs a pedestrian bridge over the railway lines instead of the busy little road bridge.

The headway needs increasing to every 15 minutes to Harrogate, 30 minutes to York. Alternate calling - so Harrogate train calls at Burley but not Headingley, York call at Headingley but not Burley for now. New units increased to 4 carriages, Bi modal. The LNER services fit a few minutes in front of one of the departures (so if it's 1314 departure for Northern, LNER departs at 1312 for example).

Eventually they need to reopen the Ripon branch, and you could have Leeds-Harroagte-Ripon (30 mins) / York (30 mins).
 
Last edited:

Upload Media

Remove Advertisements

Subscribe to help support your favourite forum and in return we'll remove all our advertisements. Your contribution will help to pay for things like site maintenance, domain name renewals and annual server charges.



Forums4aiports
Subscribe

NEW - Profile Posts

If anyone would like to share their local airport news right here in our news area let me know so I can give you the correct permissions to do so. It only takes a couple of minutes to upload a news story with an accompanying image. The news items can then be shared on the site homepage by you. #TakePart #Forums4airports Bring the news to one place!
survived a redundancy scenario where I work for the 3rd time. Now it looks likely I will get to cover work for 2 other teams.. Pretty please for a payrise? That would be a no and so stay on the min wage.
Live in Market Bosworth and take each day as it comes......
Well it looks like I'm off to Australia and New Zealand next year! Booked with BA from Manchester via Heathrow with a stop in Singapore and returning with Air New Zealand and BA via LAX to Heathrow. Will circumnavigate the globe and be my first trans-Pacific flight. First long haul flight with BA as well and of course Air NZ.
15 years at the same company was reached the weekend before last. Not sure how they will mark the occasion apart from the compulsory payirse to minimum wage (1st rise for 2 years; i was 15% above it back then!)
Ashley.S. wrote on Sotonsean's profile.
Welcome to the forum, I was born and bred in Southampton.

Trending Hashtags

Advertisement

Back
Top Bottom
  AdBlock Detected
Sure, ad-blocking software does a great job at blocking ads, but it also blocks some useful and important features of our website. For the best possible site experience please take a moment to disable your AdBlocker.