But the NOTAM doesn't show or include the relevant part of taxiway ECHO. It looks as though LIMA where possible will be used for the foreseeable. Its like just about everything with the TP things are not happening when they should or if at all. The whole thing is an utter mess. Any way we will see in due course what happens. I hope it does come on line but as I said don't hold your breath
Given the fact that taxiway has been complete for a few months now and the lighting is installed, I fail to see how it won’t be ready in tandem with the rest of the dual taxiway system?!
The taxiways will look like this after the 27th, and into the new year. This is from the Dec 25 AIRAC.
Note:
No TWY Echo from E1 - E5;
No TWY Delta from D8 - D10.
The dual taxiway system is while off being finished.
Thanks for the info.
I stand corrected then! It was only 2 weeks ago I went past whilst on a flight with easyJet and noticed that section of Echo (between Lima and Delta) was complete from a concrete and lighting perspective.