I've just spotted this amongst the NOTAMS

LOCAL AERODROME REGULATIONS - 2 GROUND MOVEMENT - ADD NEW PARAGRAPH
(M) TO READ
I. MANCHESTER HAS TWO REMOTE DE-ICING PADS THAT CAN EACH ACCOMMODATE
2 X CODE-C AIRCRAFT SIMULTANEOUSLY.
1.TAXIWAY NOVEMBER BRAVO BETWEEN TAXIWAYS NOVEMBER CHARLIE AND ECHO
CONTROLLED BYMAVERICK - FREQUENCY 121.625
2.TAXIWAY BRAVO BETWEEN IHPS B4 AND B5 CONTROLLED BY ICEMAN -
FREQUENCY 121.540

II. AIRCRAFT INTENDING TO USE THE REMOTE DE-ICING PAD WILL INFORM
DELIVERY ON FREQUENCY 121.705 WHEN THEY REQUEST START-UP.
III. DE-ICING OF ACFT IS PERFORMED WITH ENGINES RUNNING.
IV. PROPELLER AIRCRAFT ARE DE-ICED ON THE APRON RAMP. DE-ICING IS
PERFORMED WITH ENGINES SWITCHED OFF.
V. THE ATC FREQUENCY 121.855 HAS TO BE MONITORED DURING DE-ICING.
AIP AD 2.20 REFERS
 
No idea as I believe they are owned by a couple of either handling agents or specialist companies. At least this was things, on the T1/T2 side should be better organised. I presume T3 aircraft will still be de-iced on stand?
 
OAN 127/2019 – SCHEDULED RUNWAY 05L-23R NIGHT-TIME MAINTENANCE & NORTHSIDE TAXIWAY WORKS.
OAN REF:‐ 127/2019 DATE OF ISSUE:‐ 26/11/19 EFFECTIVE DATE:‐ 02/12/19 EXPIRY DATE:‐ 04/12/19
1.0 SUMMARY
1.1 Runway 05L‐23R will be closed for two consecutive nights in early December to allow for essential maintenance works on the runway, within its strip and on associated northside taxiways. All flight operations will take place on Runway 05R‐23L whilst work is in progress.
2.0 PROGRAMME
2.1 Work will take place on the nights of Monday 2nd and Tuesday 3rd December 2019.
2.2 The nightly working hours will be 22:30 – 06:00L.
3.0 SCOPE & LOCATION OF WORKS
3.1 Overall, the two nights of work will include the following tasks;
 Multiple surface repairs along the length of the Runway 05L‐23R pavement.
 Pavement repairs on Taxiway Alpha including final tie‐in work for the new Premiair access road.
 Pavement crack sealing on Taxiway Bravo in the vicinity of Intermediate Holding Point (IHP) B2.
 Multiple pavement repairs on Taxiway Juliet in the vicinity of IHP J4.
 Routine runway (and strip) maintenance tasks including surface friction assessments, AGL repairs and bolt checks.
4.0 OPERATIONAL IMPLICATIONS
4.1 Runway Operations
4.1.1 During the Runway 05L‐23R closure periods (22:30‐06:00L) all flight operations will take place on Runway 05R‐23L.
4.2 Taxiway Restrictions
4.2.1 Taxiway Alpha, between IHP A2 and its junction with Taxiway Bravo will be closed each night that work takes place.
4.2.2 Taxiway Juliet will be closed at IHP J4 each night that work takes place.
4.2.3 Taxiway Bravo, at IHP B2 will be closed on the night of Monday 2nd December.
4.3 Aircraft Parking Stand Restrictions
4.3.1 Prior to the start of work on Taxiway Juliet each night, a night‐stopping aircraft is to be parked on Stand 47.
4.4 Terminal 3 Overnight Towed Aircraft Movements – Stands 48‐58.
4.4.1 Whilst pavement repair work is in progress on Taxiway Juliet (IHP J4), any towed aircraft movements to/from Stands 48‐58 will be required to backtrack the closed Runway 05L‐23R between Links Foxtrot and Hotel.
4.4.2 Any towed aircraft runway backtracking manoeuvres are to be carried out under guidance from an Airfield Operations ‘Follow Me’ vehicle.
4.4.3 Prior to commencing any towed aircraft manoeuvre to/from Stands 48‐58 while work is in progress on Taxiway Juliet, tug crews will be required to request the presence of an Airfield Operations ‘Follow Me’ vehicle via ATC.
5.0 LOW VISIBILITY OPERATIONS (LVO)
5.1 In the event of forecast low visibility, the night works will be cancelled and Runway 05L‐23R will remain open.
5.2 In the event of un‐forecast reduced visibility conditions (meeting the criteria for LVP Alert) during the Runway 05L‐23R closure period when work has begun, the aerodrome will close to flight operations whilst the runway is recovered. An ‘AD Closed’ NOTAM will be issued in such circumstances.
 
A3805/19 NOTAMN Q) EGTT/QFALT/IV/NBO/A /000/999/5321N00217W005 A) EGCC B) 1912042100 C) 1912070530 E) AD NOT AVAILABLE FOR DIVERTED TRAFFIC EXCLUDING EMERGENCIES

Looks like it is to coincide with taxiway changes.
 
I'm finding it slightly tricky these days to interpret these notams with reverse numbers.
Is this applicable from 21.00 on the 4th Dec until 05.30 on the 7th?
 
OAN 128/2019 – MAN-TP PP04 RECONFIGURATION OF STANDS 73 AND 74
OAN REF:- 128/2019 DATE OF ISSUE:- 06/12/19 EFFECTIVE DATE:- 09/12/19 EXPIRY DATE:- 06/03/20
1.0 SUMMARY
1.1 A programme of up to 13 weeks work to reconfigure Stands 73 and 74 to three ICAO Code C stands. When these stands reopen, they will be realigned and renumbered as Stands 925, 927 and 929.
2.0 PROGRAMME
2.1 Overall: Monday 9th December until Friday 6th March 2020.
2.2 Nominal working hours will be Monday to Friday 08:00-18:00L.
3.0 SCOPE & LOCATION OF WORKS
3.1 All works will be within a compound on Stands 73 and 74.
3.2 The overall scope of works will encompass the following:
• Site establishment with full height, lit, Heras fencing and red/white baseboards;
• Removal of existing head of stand infrastructure;
• Installation of new high-mast lights;
• Installation of new Fixed Electrical Ground Power units (FEGPs);
• Installation of AVDGS “goalpost” steelwork;
• Saw cutting and joint sealing.
3.3 Works to realign the fuel hydrants on Stands 73 and 74 will be ongoing concurrently with these works under OAN 124/2019 – RECONFIGURATION OF AIRCRAFT FUEL HYDRANTS ON STANDS 73 & 74.
4.0 OPERATIONAL IMPLICATIONS
4.1 Stand Restrictions
4.1.1 Stands 73 and 74 are closed and will open, after they have been reconfigured and renumbered, as Stands 925, 927 and 929.
4.2 Road Restrictions
4.2.1 The head of stand road will be diverted to accommodate works in the western corner of the compound. When this is required a diverted route across the stand will be provided to ensure that the route to Pier 1 remains available. See attached drawing.
4.2.2 Traffic management will be in place when the high mast lights are removed from the head of stand.
4.3 Ground Service Equipment (GSE) Areas
4.3.1 Where the GSE area cannot be maintained, provision will be made to temporarily relocate it on Stand 71 and/or the GSE area to the west of the compound.
5.0 LOW VISIBILITY PROCEDURES (LVP)
5.1 Overall, the work has no impact on the airport’s ability to operate during periods of low visibility
 
Last edited:
OAN 129/2019 – MAN-TP PP04 INSTALLATION OF PITS & DUCTS ON STANDS 235 & 237
OAN REF:- 129/2019 DATE OF ISSUE:- 11/12/19 EFFECTIVE DATE:- 02/01/20 EXPIRY DATE:- 29/02/20
1.0 SUMMARY
1.1 An eight-week programme of works to install pits and ducts on Stands 235 and 237 and civils works at the head of stand to create a new aircraft taxilane (ASTL).
2.0 PROGRAMME
2.1 Overall: Thursday 2nd January until Saturday 29th February 2020.
2.2 Nominal working hours will be Monday to Friday 08:00-18:00L.
3.0 SCOPE & LOCATION OF WORKS
3.1 All work will be contained within a compound on Stands 235 and 237.
3.2 The overall scope of works will encompass the following:
• Site establishment with full height, lit, Heras fencing and red/white baseboards.
• Civils works at the head of stand to create part of the new ASTL.
• Excavation and installation of pits and ducts.
• Saw cutting and joint sealing.
4.0 OPERATIONAL IMPLICATIONS
4.1 Stand Restrictions
4.1.1 Stands 235 and 237 will be closed for the duration of the works.
4.1.2 For the duration of these works, Stand 233 will temporarily be upgraded to accommodate B763W aircraft
4.2 Ground Service Equipment (GSE) Areas
4.2.1 Any displaced GSE from the head of stands can be relocated to the GSE areas provided on Stand 235.
5.0 LOW VISIBILITY PROCEDURES (LVP)
5.1 Overall, the work has no impact on the airport’s ability to operate during periods of low visibility.
 
OAN 130 / 2019 – MAN-TP PIER 2 AIRSIDE INTRUSIVE SURVEYS
OAN REF:- 130/2019 DATE OF ISSUE:- 19/12/19 EFFECTIVE DATE:- 20/01/20 EXPIRY DATE:- 31/01/20
1.0 SUMMARY
1.1 In advance of works to construct the second Pier in the Manchester Transformation Programme, ground investigation work and trial holes will be carried out to enable the completion of the substructure design.
2.0 PROGRAMME 2.1.
Overall: Monday 20th January to Friday 31st January 2020.
2.2 Nominal working hours will be 08:00 to 18:00 local.
3.0 SCOPE & LOCATION OF WORKS
3.1 The scope of works is:
• Excavation of 10 small trial pits
• Excavation of 4 Window Sample bore holes.
3.2 The Trial Pits will be located on Stand 243 and in the grass between Stands 84 and 243. One Window Sample will be located on the road system abeam Stands 84, one in the grass between the two stands, one on Stand 243 and one on Stand 241.
4.0 OPERATIONAL IMPLICATIONS
4.1 Stand Closures and restrictions
4.1.1 Stand 243 will be closed from Monday 20th until Friday 31st January 2020. NB. The closure of Stand 243 is entirely dependant on the introduction in to service of Stands 807, 809 and 811.
4.1.2 Stand 241 and 84C will be closed from 08:00 until 18:00hrs local on the days that the Window Samples are carried out. The exact dates will be agreed with Airfield Control and the Airfield Duty Manager to minimise operational impact. These stands will not be closed concurrently.
4.1.3 Stands 84L and 84R will remain available when 84C is closed.
4.2 Ground Service Equipment Areas
4.2.1 All displaced equipment can be temporarily relocated to the GSE area provided on part of Stand 243.
4.3 Apron Road Restrictions
4.3.1 There will be a Window Sample carried out on the road system abeam Stands 84. The road will be reduced to a single lane at times to facilitate the excavation.
 
OAN 133 / 2019 – MAN-TP COMMUNICATION CABLES INSTALLATION
Due to a change of scope to reduce operational impact and programme length, this OAN replaces OAN 132-2019 with immediate effect.
OAN REF:- 133/2019 DATE OF ISSUE:- 19/12/19 EFFECTIVE DATE:- 06/01/20 EXPIRY DATE:- 17/01/20
1.0 SUMMARY
1.1 A one-week programme of works to install communication cables along the Terminal 2 apron front from Stand 211, through the Laing O Rourke (LoR) compound to the Pier 1 riser room, to provide MAG IT services for the new pier. This will involve accessing the existing pit and duct system between the above locations to install the cables.
2.0 PROGRAMME
2.1 The overall programme of work will commence on Monday 6th January until Friday 10th January 2020. An additional week has been reserved as a contingency week.
2.2 The nominal working hours are 08:00-18:00 unless otherwise agreed with the Airfield Duty Manager (ADM).
3.0 SCOPE & LOCATION OF WORKS
3.1 Overall the work comprises of the following:
• Set up of cable drum on Stand 211.
• Set up cable drum on Stand 104.
• Removal and replacement of existing cable chamber lids.
• Installation of communications cables.
• Landside/Airside breaches where the cable passes in to and out of the LoR site.
3.2 Phase 1 will commence on Stand 104 and terminate in the LoR compound.
3.3 Phase 2 will commence on Stand 104 and terminate at the Pier 1 Riser Room under the link bridge from Terminal 2 (T2) to Pier 1.
3.4 Phase 3 will commence on Stand 211 and terminate in the LoR compound.
3.5 See attached drawing for exact locations.
4.0 OPERATIONAL IMPLICATIONS


5.0 LOW VISIBILITY OPERATIONS (LVO)
5.1. The work will have no effect on the airport’s ability to operate during periods of low visibility.
 
Last edited:
OAN 134-2019 MAN-TP PP04 TWY ECHO PH 5
OAN REF:- 134/2019 DATE OF ISSUE:- 20/12/19 EFFECTIVE DATE:- 20/12/19 EXPIRY DATE:- 27/03/20
This OAN replaces OAN 104-2019 which has expired. This OAN will expire when the combined OAN to cover both the MAN-TP and BAU works in the Delta 3 area is published in January 2020.
1.0 SUMMARY
1.1 Works continue on the 5 th phase of concrete pavement bay construction and pits and ducts installation for the new Taxiway Echo. Whilst work is in progress there will be nightly closures of a portion of Taxiway Delta.
2.0 PROGRAMME
2.1 The overall programme of work commenced on the night of Sunday 27th October at 20:00hrs local and is scheduled to be completed by 06:00hrs local on Friday 27th March 2020.
2.2 The programme of pavement building works will be undertaken Sunday to Thursday at night.
2.3 The working times will be:
• Area 1 – H24
• Area 2 – 22:00-05:00
2.4 Taxiway Delta will remain open at Intermediate Holding Point (IHP) D3 and Aircraft Stand Taxilane (ASTL) Lima will be closed behind Stands 2, 4 and 6 for four nights from Monday 13th January 2020 to enable the HV cable junction works to be carried by UKPNS. This work will be subject to a separate OAN.
3.0 LOCATION & SCOPE OF WORKS
3.1 All work in Area 1 will take place within a fenced compound, lit with red obstacle lights, and encompasses the redundant Stands 100 and 101 and the soon to be decommissioned B1d Substation.
3.2 All work in Area 2 will be delineated by red and white melba logs and stretches around the edge of the H24 area at 22m from Taxiways Delta and Papa centrelines. See attached drawing for exact locations.
3.3 The overall scope of works will encompass the following:
• Site Clearance associated with the removal of existing airfield infrastructure.
• Removal of old paint markings leading to and from redundant Stands 100 and 101.
• Removal of high mast lighting.
• Excavation of existing grassed area and construction of proposed pavement.
• Installation of surface water drainage including attenuation.
• Installation of new Primary & Secondary Aeronautical Ground Lighting (AGL) ducting and pits.
• Installation of various taxiway signage & surface markings.
• Diversion of existing AGL cables.
4.0 OPERATIONAL IMPLICATIONS
4.1 Taxiway Closures
4.1.1 Taxiways Delta and Papa will be closed HN at IHPs D2, D3 and P4 from 22:00 until 05:00L, Sunday to Thursday from Monday 6th January 2020 until Taxiway Delta is diverted through Stands 61 and 62. The expected date for this divert is provisionally 19th January 2020.
4.1.2 ASTL Lima will be closed behind Stands 2, 4 & 6 for four nights to facilitate the UKPNS HV cable installation. Paragraph 2.4 refers. 4.2 Aircraft Manoeuvring Restrictions
4.2.1 There are no restrictions on Taxiway Lima; it remains full ICAO Code E ASTL. See paragraph 2.4 for exception.
4.2.2 During the HN works Sunday to Thursday, access to the Western Maintenance Area will be by prior arrangement through Airfield Control.
4.3 Aircraft Pushbacks
4.3.1 For the duration of the works, the standard pushback for ICAO Code F (A380) aircraft from Stand 12 will be;
• Pushback towards Intermediate Holding Position (IHP) L1 and then tow forwards to IHP P3 before tug release. A ‘nose wheel pushback limit marker’ will be painted on the taxiway for guidance purposes. An Airfield Operations Safety & Compliance Officer (ASCO) must be in attendance for ALL A380 pushbacks from Stand 12 to safeguard the aircraft wingtip from vehicles on the apron road at Stand 10 and to check tow-bar wheel stowage is correct.
4.4 Stand restrictions
4.4.1 Night stopping aircraft are to be parked on Stands 61 (all centre lines) and 62L during the night works.
4.4.2 Stand 62C is available for ICAO Code E aircraft throughout the works utilising ASTL Lima.
4.4.3 Stands 61 and 62 are available for ICAO Code F aircraft outside of working hours only, due to ASTL Lima being maximum ICAO Code E and TWY Delta night closures.
4.5 ICAO Code F Divert Restrictions
4.5.1 ICAO Code F aircraft diverts will not be accepted Sunday to Thursday, between the hours of 22:00L to 05:00L, due to the TWY Delta night time closures.
 
Last edited:
OAN 135/2019 – SCHEDULED RUNWAY 05L-23R NIGHT-TIME MAINTENANCE & NORTHSIDE TAXIWAY WORKS.
OAN REF:‐ 135/2019 DATE OF ISSUE:‐ 23/12/19 EFFECTIVE DATE:‐ 12/01/20 EXPIRY DATE:‐ 17/01/20
1.0 SUMMARY
1.1 Runway 05L‐23R will be closed for five consecutive nights in early January to allow for essential maintenance works on the runway, within its strip and on associated northside taxiways. All flight operations will take place on Runway 05R‐23L whilst work is in progress. 2.0 PROGRAMME
2.1 Work will take place on the nights of Sunday 12th to Thursday 16th January, inclusive.
2.2 The nightly working hours will be 22:30 – 06:00L.
3.0 SCOPE & LOCATION OF WORKS
3.1 Overall, the five nights of work will include the following tasks;
 Multiple surface repairs along the length of the Runway 05L‐23R pavement.
 Pavement repairs on Taxiway Alpha including final tie‐in work for the new Premiair access road.
 A single asphalt pavement repair on Taxiway Juliet‐Echo.
 Routine runway (and strip) maintenance tasks including surface friction assessments, AGL repairs and bolt checks.
4.0 OPERATIONAL IMPLICATIONS
4.1 Runway Operations
4.1.1 During the Runway 05L‐23R closure periods (22:30‐06:00L) all flight operations will take place on Runway 05R‐23L.
4.2 Taxiway Restrictions
4.2.1 Taxiway Alpha, between IHP A2 and its junction with Taxiway Bravo will be closed each night that work takes place.
4.2.2 Taxiway Juliet‐Echo will be closed abeam Stand 9 from circa 02:00 on the morning of Thursday 16th January.
4.3 Aircraft Parking Stand Restrictions
4.3.1 Prior to the start of work on Taxiway Juliet‐Echo, a night‐stopping aircraft is to be parked on Stand 9.
4.3.2 An aircraft may be docked on Stands 7 and 11 whilst work is in progress on Taxiway Juliet‐Echo, however any subsequent aircraft pushback manoeuvres will not be possible until the taxiway works have been completed.
5.0 LOW VISIBILITY OPERATIONS (LVO)
5.1 In the event of forecast low visibility, the night works will be cancelled and Runway 05L‐23R will remain open.
5.2 In the event of un‐forecast reduced visibility conditions (meeting the criteria for LVP Alert) during the Runway 05L‐23R closure period when work has begun, the aerodrome will close to flight operations whilst the runway is recovered. An ‘AD Closed’ NOTAM will be issued in such circumstances.
 
I'm usually quite adept at reading NOTAMs but this has me struggling....

W0129/20 NOTAMN Q) EGTT/QPDGV/IV/NBO/A/000/999/5321N00216W005 A) EGCC B) 2001021935 C) 2001300001 E) AERODROME [US DOD E-IPL ONLY] SID MONTY 1R/1S/1Y/1Z WITH JULIAN DATE OF 19344 NOT AUTHORIZED


Julian Date: 19344 = Date: 10-Dec-2019
 
I'm usually quite adept at reading NOTAMs but this has me struggling....

W0129/20 NOTAMN Q) EGTT/QPDGV/IV/NBO/A/000/999/5321N00216W005 A) EGCC B) 2001021935 C) 2001300001 E) AERODROME [US DOD E-IPL ONLY] SID MONTY 1R/1S/1Y/1Z WITH JULIAN DATE OF 19344 NOT AUTHORIZED


Julian Date: 19344 = Date: 10-Dec-2019
Looking at the chart for the MONTY departures on the NATS site it appears to be dated 8th October 2019. I assume therefore (yes, dangerous I appreciate) that an updated had been issued, dated 10th December, and that this has now been cancelled and the previous chart re-instated.

Does that make sense?
 
OAN 002-2020 – OPENING OF NEW REMOTE STANDS 807, 809 & 811
OAN REF:- 002/2020 DATE OF ISSUE:- 07/01/20 EFFECTIVE DATE:- 18/01/2020
1.0 SUMMARY
1.1 The first stands which form the eventual Pier 2 Western side apron will be opening on 18th January 2020. The new apron is in an interim layout as remote stands which will eventually be served as contact stands from the future Terminal 2 Pier 2. This document provides a brief overview of the facilities and procedures.
2.0 INTRODUCTION OF NEW STANDS INTO SERVICE
2.1 The new apron and its associated aircraft parking stands will be introduced into live service following a series of operational trials. The expected date for live operations is 18th January 2020.
3.0 AIRCRAFT STAND LAYOUT & PURPOSE
3.1 There are 4 stand centrelines in total but due to the MARS arrangement a maximum of 3 may be used simultaneously.
3.1.1 Stand 807R is an individual Code C stand and unaffected by the use of any of the other stands. It is separated from the other stands by an Inter-Stand Clearway.
3.1.2 Due to the interim nature of this apron there will be no JET A1 fuel hydrant supply. Because of this, departing flights will not generally be assigned to these stands and they will be used primarily for arrivals and for ‘tow-off’ parking of long ground-time aircraft.
3.1.3 All aircraft operations are on the Taxi-In-Push-Out principle, there is no self-manoeuvring by aircraft.
4.0 AIRCRAFT STAND CAPACITIES

5.0 HEAD OF STAND EMERGENCY AND SAFETY EQUIPMENT
5.1 Each stand will be equipped with and Head of Stand Safety Equipment position. At this position there will be;
• High-mast apron floodlighting
• Aircraft Emergency Stop Button.
• Emergency telephone.
• SNIB Override (Airfield Operations use only).
• FOD bin.
• Oil can bin.
• Winter de-icing granules hopper and shovel.
6.0 AIRCRAFT DOCKING
6.1 Aircraft docking on all Pier 1 stands will be via Safedock Advanced Visual Docking Guidance System (AVDGS).
7.0 AIRCRAFT PUSHBACKS
7.1 All aircraft pushback procedures for the new stands are on to taxiway November-Alpha and will be included within the published EGCC Aircraft Pushback Procedures document, Revision Alpha.
8.0 APRON ROAD SYSTEM
8.1 The new apron is served by an existing airside road which is aligned as a Head-of-Stand road for the stands. It is a 7.5m wide two-way road running between Terminal 2 and the Western Apron.
8.2 Other than when directly engaged in aircraft turnaround activities, there should be no requirement for vehicles to transit across the rear of aircraft parking stands.
8.3 There will be a minimum of 4.5m available at the rear of parked aircraft to enable aircraft turnaround vehicles to pass behind the aircraft without encroaching on the taxiway strip, demarked by double white lines. NB: Vehicle drivers are not to use the rear of stand to travel from stand to stand.
9.0 FIXED ELECTRICAL GROUND POWER
9.1 All new stands will be equipped with apron mounted Powervamp Fixed Electrical Ground Power (FEGP) with outputs suitable for the aircraft mix to be served on each stand.
10.0 GROUND SERVICE EQUIPMENT PARKING
10.1 The apron has been designed such that the space on aircraft stands is largely dedicated to the servicing and turnaround of aircraft, and to be free of general vehicle and equipment parking. 1
0.2 A large equipment parking corral is situated alongside Stand 811 and will be assigned to particular pieces of equipment as published within the Airfield Equipment Parking Plan.
10.3 A limited amount of assigned equipment parking space may be provided on certain stands. Equipment bay assignments will be published in the Airfield Equipment Parking Plan.
11.0 PEDESTRIAN ACCESS
11.1 There is no pedestrian access to this remote apron. All staff must access the apron by vehicle transport.
12.0 SURVEILLANCE AND DATA CAPTURE
12.1 In line with the rest of the airfield, all activity on the new pier stands will be monitored and recorded H24 by CCTV operated by MAG. Recordings may be used in the investigation of incidents and for audit purposes.
13.0 UK AERONAUTICAL INFORMATION PACKAGE (AIP) 13.1 The new apron appears on updated AIP charts from AIRAC 04/2019, likewise, relevant AIP textual data will be updated simultaneously.
14.0 EGCC AERODROME MANUAL
14.1 Parts C, D and E of the EGCC Aerodrome Manual will be updated to reflect the introduction of the new pier into operation. Updates will be published via a Supplementary Instruction.
15.0 LOCALLY ISSUED AIRFIELD MAPS
15.1 Airfield Manoeuvring Area and Apron Road Maps 2019 v2.0 show the new stands These are available for download at: https://www.manchesterairport.co.uk/aviation-professionals/airfield-maps/
 
Last edited:
OAN 004/2020 – TAXIWAY DELTA PAVEMENT RECONSTRUCTION AT INTERMEDIATE HOLDING POINT D3.
OAN REF:‐ 004/2020 DATE OF ISSUE:‐ 13/01/20 EFFECTIVE DATE:‐ 25/01/20 EXPIRY DATE:‐ 29/05/20
1.0 SUMMARY
A programme of up to eighteen weeks’ work to complete essential airfield pavement reconstruction on Taxiway Delta in the vicinity of Intermediate Holding Point (IHP) D3. For the duration of the work an unlit taxiway centreline diversion will be in use around the works area. Aircraft will be guided through the taxiway diversion by Airfield Operations Follow‐Me vehicles, H24.
2.0 PROGRAMME
2.1 The overall programme of work will commence on the night of Sunday 26th January 2020.
2.2 The work is scheduled to be completed by the morning of Friday 28th May 2020.
2.3 The majority of work will take place during daylight hours. Nominal daily working times will be 08:00 – 17:00L.
2.4 Some elements of work will be carried out at night. Prescribed working times for any night work will be 22:30 – 06:00L
3.0 SCOPE & LOCATION OF WORKS
3.1 The work will entail the full depth reconstruction of multiple failed concrete pavement bays on Taxiway Delta, located between IHP D3 and its junction with Taxiway Papa. The attached drawing depicts the overall works area and required Taxiway Delta diversion. 4.0 OPERATIONAL IMPLICATIONS
4.1 Taxiway Delta Diversion
4.1.1 From the morning of Monday 27th January, Taxiway Delta, through IHP D3 will operate on a diverted, unlit taxiway centreline. The diversion will route through closed Stands 61 and 62.
4.1.2 Aircraft will be guided through the diversion by Airfield Operations Follow Me vehicles, H24.
4.1.3 An unlit Intermediate Holding Point will be painted on the taxiway diversion, designated as D3 to replace the existing IHP D3 for the duration of the works.
4.1.4 The Taxiway Delta diversion will have sufficient strip width to allow for normal operations of ICAO Code E aircraft (max 65m wing span).
4.1.5 In exceptional circumstances it will be possible to manoeuvre A380 aircraft through the taxiway diversion, under tow only. Paragraph 4.6 provides further specific information regarding provision for ICAO Code F aircraft for the duration of the works programme. 4.2 Taxiway Closures
4.2.1 Taxiway Quebec will be closed H24 for the duration of the works.
4.2.2 Whilst night‐time elements of work are in progress, the following taxiway closures will apply (2230 – 06:00L):
 Taxiway Papa at IHP P4.
 Taxiway Delta at IHP D2.
 Taxiway Delta at its junction with Taxiway Lima. N.B: It should be noted that night‐time working will not be required for the full duration of the works programme.
4.3 Aircraft Stand Closures & Restrictions
4.3.1 For the duration of the works programme, the following aircraft stand operational implications will apply:
 Stands 61 and 62 (all centrelines) closed H24.
 Stand 63C downgraded to maximum aircraft size B787‐8/ A330‐200.
 Aircraft hydrant fuel not available on Stand 63L.
4.4 Relocation of Double‐White Lines – Stands 61‐63
4.4.1 Due to the required diversion of Taxiway Delta, the double‐white lines at the rear of Stands 61 and 62 will be relocated almost to the head of those closed stands for the duration of the works. See attached drawing.
4.4.2 The relocation of the double‐white lines will have no impact on access to equipment areas or other facilities located at the head of Stands 61 and 62.
4.4.3 Whilst operating in the area of Stands 61‐63, airfield users must remain vigilant of the relocated double‐ white lines signifying the edge of the diverted Taxiway Delta strip.
4.5 Aircraft Washing
4.5.1 For the duration of the works programme, aircraft washing may take place on Stand 66. Any aircraft washing activity will require prior arrangement with Airfield Control, as normal.
4.6 Impact on ICAO Code F Aircraft Operations
4.6.1 For the duration of the works programme, the airport will be unable to accept diversion movements of ICAO Code F aircraft, which encompasses the following aircraft types;
 B747‐8, A124, A225, A380.
4.6.2 Scheduled operations of A380 aircraft may continue as normal for the duration of the works programme, however it should be noted that Stands 61 and 62 will not be available for A380 parking.
4.6.3 Should there be a need to park an A380 on Stand 80 (the only remaining Code F remote aircraft stand for the duration of the works programme), the aircraft will be manoeuvred to/from Stand 80 through the Taxiway Delta diversion, past the area of work in progress under tow only.
4.6.4 With effect from Saturday 25th January, the following non‐standard pushback procedure will apply for A380 aircraft only, departing from Stand 12 for the duration of the works programme;
 Push tail towards IHP P4. Push as far as nose wheel limit marker then pull forward to IHP P3. Engine start at IHP P3.
4.6.5 In the event of an A380 aircraft being pushed back from Stand 12 with an inoperative APU, the non‐ standard pushback procedure will be;
 Push tail towards IHP L1 then pull forward for release at IHP P3. Engine start during pull forwards. N.B: The pushback to manoeuvre to IHP L1 will avoid active aircraft engines transiting directly over an area of work in progress (outside the Code F taxiway Cleared & Graded strip), and the attendant risk of FOD ingestion.
4.7 Aircraft Access to Western Maintenance Apron
4.7.1 For the duration of the works programme, aircraft access/egress to/from the Western Maintenance Apron will be via prior arrangement with Airfield Control.
4.7.2 All aircraft movements to/from the apron will be assisted by an Airfield Operations Follow Me vehicle.
4.7.3 All aircraft will be routed to/from the apron via Taxiway Papa (through IHP P4) or Taxiway Delta (through IHP D2). There will be no access to/from the apron via Taxiway Delta (IHP D3) for the duration of the works programme. Portions of the aforementioned routes will be unlit.
4.8 Premiair Access Road
4.8.1 The operation of the Premiair access road will remain unchanged, however drivers must be aware that the portion of road classed as taxiway crossing between Stand 61 and the southern side of the Western Maintenance Area access ramp will be extended, therefore extra vigilance of aircraft movements on Taxiway Delta will be required.
4.9 Stand 61 ULD Racking
4.9.1 For the duration of the works programme, a total of 10 x ULD racks will be relocated from adjacent to Stand 61L to the Head of Stand 61R. See attached drawing.
5.0 LOW VISIBILITY PROCEDURES (LVP)
5.1 Overall, the work has no impact on the airport’s ability to operate during periods of low visibility.
5.2 In the event of forecast low visibility, any planned night works will be cancelled. Daytime work within the area demarked by Heras fencing may continue at the discretion of the ADM.
6.0 FURTHER INFORMATION
6.1 A NOTAM(s) promulgating significant operational detail will be issued prior to the start of works.
 
Last edited:
OAN 006/2020 – OVERNIGHT NORTHSIDE PAVEMENT REPAIRS – TAXIWAY NOVEMBER-CHARLIE.
OAN REF:‐ 006/2020 DATE OF ISSUE:‐ 14/01/20 EFFECTIVE DATE:‐ 26/01/20 EXPIRY DATE:‐ 07/02/20
1.0 SUMMARY
A programme of up to ten working shifts to complete essential airfield pavement repairs on Taxiway November‐Charlie. The work will require localised, overnight taxiway closures and there will be a requirement for night‐stopping aircraft to be parked on stands before pavement repair work takes place.
2.0 PROGRAMME
2.1 The overall programme of work will commence on the night of Sunday 26th January 2020.
2.2 The work is scheduled to be completed by the morning of Friday 7th February 2020.
2.3 Overall, the work will take place Sunday to Thursday nights (inclusive), with nightly working hours of 22:00 – 05:00L.
3.0 SCOPE & LOCATION OF WORKS
3.1 The required work will be located on Taxiway November‐Charlie abeam Stands 239 and 241.
3.2 There will also be further minor repairs undertaken at various locations on Taxiway November‐Charlie. These minor repairs will be managed tactically to avoid any operational disruption.
3.3 The scope of work will involve;
 PQX concrete pavement bay replacements x 8.
 Several minor maxicrete repairs.
4.0 OPERATIONAL IMPLICATIONS
4.1 Taxiway Closures
4.1.1 Taxiway November ‐Charlie will be closed 22:00 – 05:30L abeam Stands 239 and 241 each night that work takes place.
4.1.2 Taxiway November‐Charlie will be fully operational outside of the nightly working times.
4.2 Stand Restrictions
4.2.1 Whilst work is in progress on Taxiway November‐Charlie, night‐stopping aircraft are to be parked on Stands 239 and 241 prior to the start of works each night.
4.2.2 Aircraft may dock on Stands 104, 210, 211, 237 and 243 whilst work is in progress, however any subsequent aircraft pushback from these stands will not be possible until pavement repair work has been completed the following morning.
4.3 Aircraft Pushbacks
4.3.1 Should there be a need for aircraft pushbacks from Stands 807R, 809 or 811 whilst the night‐time work pavement repair work is in progress, the following non‐standard pushback manoeuvre is to be used for jet aircraft;
 Aircraft nose wheel abeam Stand 112 centreline, facing west (cargo sheds).
5.0 WORK AREA DEMARCATION
5.1 The nightly closed portion of Taxiway November‐Charlie will be demarked by lit mobile barriers and extinguished taxiway centreline lighting.
6.0 LOW VISIBILITY PROCEDURES (LVP)
6.1 Overall, the work has no impact on the airport’s ability to operate during periods of low visibility.
6.2 In the event of forecast low visibility, the planned night works will be cancelled.
 

Remove Advertisements

Subscribe to help support your favourite forum and in return we'll remove all our advertisements. Your contribution will help to pay for things like site maintenance, domain name renewals and annual server charges.



Forums4aiports
Subscribe

Heads Up!

For some weird reason, my days off work tend to involve being out of my flat by 5am and not getting back until 10pm. Back to work and the regular "fix" of 7.40am to 7.15pm hours
Heatwave Mk2 next week?
Some explosive weather build-ups currently in the North of England. What is it like where you are?
LBA: B737-300 G-GDFK empty down to Paris at 16:15 to operate the return LS268 back to Leeds 20:00 ETA where it will then operate the delayed LS265 to Malaga 20:40ETD
LBA: Albastar B737-800 EC-MUB positioning in tommorow afternoon from Gatwick 15:45 to operate a charter to Lourdes/Tarbes on Friday afternoon 14:00 AP7721 STC