Still having to walk down the temporary walkway. I couldn't see what's happening behind the boarded up area unfortunately.
Follow along with the video below to see how to install our site as a web app on your home screen.
Note: This feature may not be available in some browsers.
Enjoy your break away.Still having to walk down the temporary walkway. I couldn't see what's happening behind the boarded up area unfortunately.
What's the latest? Any news?
Demolition of the old shed housing the old Belt 3, AOU and Swissport offices has begun today. Excavators have left the new stands area but they don't look ready for pouring yet. The small duty free outlet in the extension is being installed after its initial period of dormancy
My exact thoughts, if you're reading this, Vince, please give us a treat to keep us occupied!I had hoped the airport might give us a fly through animation of the likely finished product to keep us and the flying public interested.
The plans show walkway access from as far as the old immigration all the way to the new arrivals which makes sense as it means passengers can walk in from both sides of the building to the new domestic and international arrivals. As the walkway will be twinned this will also allow the use by departing passengers.The remaining old section of walkway that links the new walkway from the extension is not really temporary as referred to above.
There are plans now to build a proper pier but it was never destined to be fully removed as they need it to segregate inbound and outbound flights.
The section opposite stand 8 will be removed at some point as that is no longer required.
I count 5 on the floor plans.I was referring to the temporary corridor, EX9. Thanks for the update information.
The schematics Aviator has posted show only 4 baggage reclaim belts. I was under the impression that the plan was to be for a total of 5?
There is actually six with one of the belts going slightly off the image. This one will be for domestic arrivals.I count 5 on the floor plans.
There is a belt to the left.
Basically the same as they do now. If there's a confliction ground staff hold passengers until the passengers from the other flight have passed.Trying to get my head around the flow, if people were arriving on the gate to the left, but departing on the one central to the plan, how would they navigate past?
Supposed to be winter 2026/7. Two each year until there's an extra 10.The new stands are currently being poured in sections. At last!
The next question is, how soon after these open will we see construction of the next 2 start?