MannyJon
Member
2 different routes, one for CTA, one for internal domestic.well to answer my own question, it looks like all CTA flights follow the process, not just the non-UK ones. so that would mean all UK, IE, IOM, JER, GCI.
Follow along with the video below to see how to install our site as a web app on your home screen.
Note: This feature may not be available in some browsers.
2 different routes, one for CTA, one for internal domestic.well to answer my own question, it looks like all CTA flights follow the process, not just the non-UK ones. so that would mean all UK, IE, IOM, JER, GCI.
Just how many remotes will be lost with dual taxiway ops? Surely they will have to make up for loss? Only be a handful of widebody remotes left, unless overnights put on Pier C?No idea to be honest, mostly like code C as most aircraft would be the likes of easyJet/Jet2 or TUI narrowbody’s.
During late spring/early summer Swissport are due to move out so I guess then…
Just how many remotes will be lost with dual taxiway ops? Surely they will have to make up for loss? Only be a handful of widebody remotes left, unless overnights put on Pier C?
Depends who you ask. Some say the tunnel was only planned, some say the box was actually built.General question, going back to original T2 phase 2 expansion plan, with remote satellite situated in middle of western apron....Is it true a tunnel was constructed for this when T2 was originally constructed? There was apparently an area earmarked for escalators down to tunnel also?
AFAIK when west gate is pushed back and the ops porta cabins are gone, 63,4 and 5 will be pushed back and retained. 925,7 and 9 shouldn’t be affected by the dual taxiway. So is that 8-ish lost medium term?
Very interesting, expanded Western Pier no remote satellite? I so preferred original phase 2 plan, guess too expensive and wouldn't have been too good for traffic flow, push backs onto taxiway etc!Talking of expansion, some may be interested in the model that hung in Olympic House in the mid 90s. Of note is the T2 terminal building was shown as complete and the escalators to the tunnel were shown despite there being no remote pier.
![]()
![]()
![]()
Would have epic if they did it!Depends who you ask. Some say the tunnel was only planned, some say the box was actually built.
The escalators would have been added to the front of the terminal:
![]()
I would hazard back then the remote was a phase 3 plan.Very interesting, expanded Western Pier no remote satellite? I so preferred original phase 2 plan, guess too expensive and wouldn't have been too good for traffic flow, push backs onto taxiway etc!
I would hazard back then the remote was a phase 3 plan.
I’m not a fan of the current choice of cul de sacs but that’s me.
I wish they just expanded T2 terminal as is now, but expanded Western PierI would hazard back then the remote was a phase 3 plan.
I’m not a fan of the current choice of cul de sacs but that’s me.
2 different routes, one for CTA, one for internal domestic.
Is Pier 2 still scheduled to open on time? All gates opening?
Pretty sure the legacy terminal was always proposed to open after pier 2. Like you say some areas look much further behind than the more recent pier interiors. Arrival of air bridges will be a good measure of pier progress. Likewise, completion of the BOH lift / stair tower landside on the south east end of the terminal could indicate how far along the shops / restaurants are to opening since they can’t realistically re-stock without it.The airport has posted a few more photos via social media. The equipment for the security channel has been delivered, finishing touches are being added to the floor and ceiling as you exit security, but the expanded retail and food and beverage area looks way off. With the steel work for the expanded amber alehouse still going in.I can see June being a realistic opening date as the airport will have to test a lot of the systems before going live. Same with Pier 2 they will want to test all stands are in full working order.
Almost.Has new dual taxiway over grassed area between pier B and C been completed yet? Anyone any pics to show? I don't use Instagram to check
Taken an awful long time. Does new Echo taxiway link out to runway too? Appears to be a section disused when viewing from RVP?Almost.
The airport posted this; it’s further along than that photo.Taken an awful long time. Does new Echo taxiway link out to runway too? Appears to be a section disused when viewing from RVP?
Subscribe to help support your favourite forum and in return we'll remove all our advertisements. Your contribution will help to pay for things like site maintenance, domain name renewals and annual server charges.