OAN 034/2022 – SCHEDULED RUNWAY 05L-23R NIGHT-TIME MAINTENANCE CLOSURES & NORTHSIDE TAXIWAY REPAIRS.
OAN REF:‐ 034/2022 DATE OF ISSUE:‐ 22/06/22 EFFECTIVE DATE:‐ 05/07/22 EXPIRY DATE:‐ 08/07/22
PLEASE ENSURE THIS INFORMATION IS PROMULGATED TO ALL STAFF
1.0 SUMMARY
1.1 Runway 05L‐23R will be closed for three consecutive nights in early July to facilitate essential runway maintenance works within its strip and asphalt repairs on Taxiway Alpha. All flight operations will take place on Runway 05R‐23L whilst work is in progress.
2.0 PROGRAMME
2.1 Work will take place on the nights of Tuesday 5th to Thursday 7th July 2022, inclusive.
2.2 The planned nightly working hours will be 22:30 – 06:00L.
3.0 SCOPE & LOCATION OF WORKS
3.1 Overall, the scope and location of work will be:
Asphalt repairs and overbanding on Runway 05L‐23R between Links Papa and Mike.
Asphalt repairs on Taxiway Alpha at its junction with Taxiway Bravo.
Overbanding on Taxiway Alpha from abeam Link Alpha‐Foxtrot to east of Intermediate Holding Point (IHP) A3.
Routine runway maintenance tasks including AGL repairs and refreshment of painted ground markings.
4.0 OPERATIONAL IMPLICATIONS
4.1 Runway Operations
4.1.1 During the Runway 05L‐23R closure period (22:30‐06:00L) all flight operations will take place on Runway 05R‐23L.
4.2 Taxiway Restrictions
4.2.1 Taxiway Alpha will be closed on the night of Thursday 7th July (22:30 – 06:00L) between IHP A2 and its junction with Taxiway Bravo.
5.0 LOW VISIBILITY OPERATIONS (LVO)
5.1 In the event of forecast low visibility, the planned work will be cancelled and Runway 05L‐23R will remain open.
5.2 In the event of un‐forecast reduced visibility conditions (meeting the criteria for LVP Alert) during the Runway 05L‐23R closure period when work has begun on the runway paved surface, the aerodrome will close to flight operations whilst the runway is recovered. An ‘AD Closed’ NOTAM will be issued in such circumstances.
OAN 034/2022 – SCHEDULED RUNWAY 05L-23R NIGHT-TIME MAINTENANCE CLOSURES & NORTHSIDE TAXIWAY REPAIRS.
OAN REF:‐ 034/2022 DATE OF ISSUE:‐ 22/06/22 EFFECTIVE DATE:‐ 05/07/22 EXPIRY DATE:‐ 08/07/22
PLEASE ENSURE THIS INFORMATION IS PROMULGATED TO ALL STAFF
1.0 SUMMARY
1.1 Runway 05L‐23R will be closed for three consecutive nights in early July to facilitate essential runway maintenance works within its strip and asphalt repairs on Taxiway Alpha. All flight operations will take place on Runway 05R‐23L whilst work is in progress.
2.0 PROGRAMME
2.1 Work will take place on the nights of Tuesday 5th to Thursday 7th July 2022, inclusive.
2.2 The planned nightly working hours will be 22:30 – 06:00L.
3.0 SCOPE & LOCATION OF WORKS
3.1 Overall, the scope and location of work will be:
Asphalt repairs and overbanding on Runway 05L‐23R between Links Papa and Mike.
Asphalt repairs on Taxiway Alpha at its junction with Taxiway Bravo.
Overbanding on Taxiway Alpha from abeam Link Alpha‐Foxtrot to east of Intermediate Holding Point (IHP) A3.
Routine runway maintenance tasks including AGL repairs and refreshment of painted ground markings.
4.0 OPERATIONAL IMPLICATIONS
4.1 Runway Operations
4.1.1 During the Runway 05L‐23R closure period (22:30‐06:00L) all flight operations will take place on Runway 05R‐23L.
4.2 Taxiway Restrictions
4.2.1 Taxiway Alpha will be closed on the night of Thursday 7th July (22:30 – 06:00L) between IHP A2 and its junction with Taxiway Bravo.
5.0 LOW VISIBILITY OPERATIONS (LVO)
5.1 In the event of forecast low visibility, the planned work will be cancelled and Runway 05L‐23R will remain open.
5.2 In the event of un‐forecast reduced visibility conditions (meeting the criteria for LVP Alert) during the Runway 05L‐23R closure period when work has begun on the runway paved surface, the aerodrome will close to flight operations whilst the runway is recovered. An ‘AD Closed’ NOTAM will be issued in such circumstances.