Just to recap...

Bentley's moved into the short-stay car park shortly after the New Year and have commenced work on the alternations there. On the plans there is to be a new mini roundabout within the car-park on the higher lever. New entrance and exit barriers will be installed which will ease the traffic considerably when complete.

It is understood that the planning application has indeed been submitted now and a decision is expected sometime in March by Leeds City Council. I can't find any details of the planning application online, has anybody else located it?

On the bright side, it appears like there is plenty happening with surveyors and architects milling around the terminal, so it looks like the plans are progressing despite the shortage of information coming from the airport authority.
 
Re: Infrastructure Developments

Yes, it is on the New Applications List w/e 8/1/09.
 
Re: Infrastructure Developments

Over on the other side of the terminal building, does anyone know (Aviador?) if the re-surfacing work has commenced yet on the runway. If not, does anyone know why and when it will start? The night closure this winter was specifically aimed at getting the runway done before the summer season starts.
 
  • Thread starter
  • Admin
  • #4
Re: Infrastructure Developments

I'm afraid to say, nothing other than exploratory work has been done with regards to resurfacing the runway.
 
  • Thread starter
  • Admin
  • #5
Re: Infrastructure Developments

Disappointing news about the so-called walkway that is to be built on the ramp. I understand it is only to be built in a bus stop style fashion and wont be built in a permanent structure. The new bus stop style will go from around the stand 8 area to around stand 12 at ground level. On the plus side at least it will keep people a little dryer.
 
Re: Infrastructure Developments

There must therefore be a risk that the runway resurfacing won't now happen this winter after all. I think I can feel a question coming on at this months Consultative Committee - ie Why was the airport closed early over the winter to allow this work to happen yet nothing has been done. It may be something that the airport tell us anyway as an update to the last meeting minutes, and if I find anything out, I will let you all know.
 
  • Thread starter
  • Admin
  • #7
Re: Infrastructure Developments

Thanks White Heather an update would be great. I get a feeling it's been stalled by the CAA.
 
  • Thread starter
  • Admin
  • #8
Re: Infrastructure Developments

Revealed: Leeds Bradford Airport expansion plan

CONTROVERSIAL plans to expand the terminal building at Leeds Bradford Airport, creating up to 3,000 jobs, have gone before planning officials. See a preview of the proposals here.
The scheme, announced by the airport's new private equity owners Bridgepoint, is at the centre of a £70m masterplan to increase passenger numbers to five million a year by 2013.

But local residents have complained about increased traffic and aircraft noise.

Airport chief executive John Parkin said the "exciting" improvements would help Leeds Bradford lure passengers from Manchester and give the region's economy a boost.

"At the moment, we have an awful lot of people travelling from our catchment area across the M62, " he said.

The planned two-storey expansion, expected to cost £28m, would provide a new passenger security screening zone, a new departure lounge, an improved baggage reclaim hall and better immigration facilities.

An extra £450,000 is expected to be spent on improving access roads to the airport, as well as a feasibility study exploring the possibility of a light rail link.

Mr Parkin said the expansion was needed for the airport to offer more medium and long-haul flights, a key element of the plan to raise yearly passenger numbers from 2.9 million to five million.

"It is a big investment project, notwithstanding the current economic environment, but we have a great deal of confidence that it will go ahead, " he said.

Source
 
Re: Infrastructure Developments

I just want it on record that as a local resident, I totally welcome more aircraft movements and noise. I live less than 1 mile from the airport and it doesn't bother me. I bet most of the moaners are quite happy to do the M62 run!!!!
 
Re: Infrastructure Developments

I say the same bigman - I am under 2 miles from runway 32 and right under the flight path and even in summer, with windows open etc, flights do not cause us a problem, even during the night. This terminal development is needed frankly, whether or not the passenger numbers increase as the terminal is at bursting point already. The Councils sold the airport to Bridgepoint fully aware of their plans to develop the terminal, so it would be rather pathetic if now, having got their money, they turned down the application for any reason other than tweaking the design.

Apart from anything else, it would be crazy in the current situation to turn down something that will bring jobs to the airport and surrounding area. I don't view their plans as even slightly contraversial.
 
Re: Infrastructure Developments

I have been told that work is to commence on the new passenger walkway next month. The work involves moving the airside road and apron lighting.
 
Re: Infrastructure Developments

I drove past the airport earlier today. The airport is looking very much like a building site at the moment which is good to see. It should only be a few weeks until a decision is made by Leeds City Council about the proposed terminal extension. I'm sure permission will be granted. Lets just hope that the 'swampies' don't get in the way of things and dampen our spirits. No doubt groups such as Plane Stupid will start getting involved once the contractors start moving in.
 
Re: Infrastructure Developments

I am sure security or the Police will have fun unchaining them from the gates!!!!
 
Re: Infrastructure Developments

Shouldn't they be called 'Plain Stupid' rather than 'Plane Stupid' - because that is exactly what they are. At least there are no trees around the terminal for them to sit in!
 
Re: Infrastructure Developments

Not even any plane trees? :shok:
 
Re: Infrastructure Developments

TheLocalYokel said:
Not even any plane trees? :shok:


We have a Plane Tree Hill opposite the airport will that do? :tease:
 
Re: Infrastructure Developments

That'll do nicely (what was the tv advert that used that 'catchphrase' a few years ago?).

On a serious note, some of the actions these 'environmental warriors' get up to are often inherently more dangerous than the matters subject of their protest.

Whilst the majority of environmentalists are motivated from genuine (though frequently misguided) desires to rid society of what they see as unwanted developments, there is a minority (probably those who attach themselves to many protests) who will go far beyond democratic means of registering protest.
 
Re: Infrastructure Developments

Aviador said:
Disappointing news about the so-called walkway that is to be built on the ramp. I understand it is only to be built in a bus stop style fashion and wont be built in a permanent structure. The new bus stop style will go from around the stand 8 area to around stand 12 at ground level. On the plus side at least it will keep people a little dryer.

I learnt today that this project has been cancelled at the last minute. It is still unclear why the project has been cancelled. Preparations were already underway to facilitate the building of the new walkway which included hoardings and portacabins. I just hope this doesn't have any wider implications on the proposed terminal development.
 
Re: Infrastructure Developments

It is a strange thing to cancal, as compared to the rest, the cost will be low. At the Consultative Committee, there was a lot of criticism about passengers having to face the elements whilst walking to the terminal, but also from the terminal to the aircraft, especially when the distance doesn't warrant one of the buses. Perhaps though, the bus top style shelter running along the side of the apron, which is in an elevated position, didn't go down too well with the planners. Certainly, it would not have looked too good. If they are going to do something like this, it would be better to do it properly, building something that doesn't look too ugly, or like a temporary solution.
 
Re: Infrastructure Developments

Some good news about runway works. I have been informed that work to the runway will commence from tomorrow and is expected to take around 7 weeks to complete. The equipment taken into the airside area today looks to be heavy gear so it would appear that the work will be more substantial than that carried out on previous occasions.
 

Upload Media

Upgrade Your Account

Subscribe to help support your favourite forum and in return we'll remove all our advertisements. Your contribution will help to pay for things like site maintenance, domain name renewals and annual server charges.



Forums4aiports
Subscribe

NEW - Profile Posts

9 trips in 9 days done 70 miles walked and over 23-00 photos taken with a large number taken at 20mph or above. Heavy rain on 1 day only
5 trips done and 45 miles walked,. Also the RAF has had 4 F35B Lightning follow me yesterday and today....
My plans got altered slightly as one of the minibus companies had to cancel 3 trips and refunded me but will be getting nice discount when I rebook them.
wondering why on my "holidays" I choose to get up 2 hours earlier than when going to work. 6 trips in 6 days soon coming up with 3 more days to sort out

Trending Hashtags

Advertisement

Back
Top Bottom
AdBlock Detected

We get it, advertisements are annoying!

Sure, ad-blocking software does a great job at blocking ads, but it also blocks useful features of our website. For the best site experience please disable your AdBlocker.

I've Disabled AdBlock