Leeds Bradford: General Airport Discussion & Updates

  • Thread starter Thread starter Aviador
  • Start date Start date
  • Tagged users Tagged users None
Use this prefix for new threads for Leeds Bradford Airport
Unfortunately there is very little LBA aviation to discuss at present.
Seriously! There ia plenty of stuff to talk about LBA wise, the airports undergoing a 100million pound transformation! Reg the original plans for a new breem shiny new eco terminal aint it just typical yet again that LBA has missed out, bad timing, if the plans had been put forwards now I'm sure things would of been different.
Saying that so far im pretty impressed with LBAs regen plans, the terminal extension is much larger than i expected and if future plans were to extend the short pier to create a good full length one, together with a reconfigured existing terminal the future looks good.
 
Seriously! There ia plenty of stuff to talk about LBA wise, the airports undergoing a 100million pound transformation! Reg the original plans for a new breem shiny new eco terminal aint it just typical yet again that LBA has missed out, bad timing, if the plans had been put forwards now I'm sure things would of been different.
Saying that so far im pretty impressed with LBAs regen plans, the terminal extension is much larger than i expected and if future plans were to extend the short pier to create a good full length one, together with a reconfigured existing terminal the future looks good.
They need to get on with the pier extension asap, the bus shelter and portacabin gate are a disgraceful embarrassment
 
One other thing mentioned this week was the government was going to do away with NIMBYism so that's GALBA shut up from now onward.

The only real way forward to move away from that is to make planning permission solely independent from council / politics etc. Sadly I think corruption would likely set in then.

It’s really hilarious that we could have had a brand new spanking terminal opening in spring 😂 instead we’ve got the 1950’s terminal with all its extensions.
 
It’s really hilarious
new spanking terminal opening in spring 😂 instead we’ve got the 1950’s terminal with all its

The only real way forward to move away from that is to make planning permission solely independent from council / politics etc. Sadly I think corruption would set in.
1960s terminal....the one there in the 50s burned down if you recall.
It seems to me that the current planning system has already brought about corruption. Weren't some planning officers suspended recently due to suspected corruption? And I dont believe for one minute that all planning decisions are rejected or approved in an honest way. Outside influences do their thing and the decision makers do theirs, having been duly ' influenced'. In fact I would conclude that politics generally is riddled with corruption.
 
Last edited:
Shame, would of thought with the regen project they would of replaced it.

I suppose in the airports case the is no point replacing or fixing it when nobody wants to use it. Especially with the costs involved which aren’t cheap.
But I’m lead to believe they will replace it if an airline committed to using it on a long term basis. Eg British Airways or a long haul operator.
 
Last edited:
I suppose in the airports case the is no point replacing or fixing it when nobody wants to use it. Especially with the costs involved which aren’t cheap.
But I’m lead to believe they will replace it if an airline committed to using it on a long term basis. Eg British Airways or a long haul operator.
I think in one of WH's reports the airport stated they were getting one repaired and were replacing the other.
 
I’m sure getting the jet bridge is quite far down the list of things that LBA management are looking to spend their money on currently, especially as airlines are not too bothered about using it. As @lbaspotter has mentioned though, if there was long-term interest from an airline then that would make sense to invest in the cost of the repair/upgrade.
LTN, BRS, EMA, LPL & ABZ are all large UK airports without jet-bridges and between them see a mixture of low cost and full-fare airlines operating.
 
Yes it did. I understood it was to be replaced as part of phase 2 of LBA Regen. That was then. Whether it's changed or not, I wouldn't know.

If it’s the case I’m very happy it’s getting replaced as part of project #REGEN2, seen as Stand 8 is the only wide-bodied marked stand we have at LBA.
Especially seen as the markings for wide-bodied aircraft parking across stand 14/15 got removed.
 
Last edited:
If that’s the case I’m very happy it’s getting replaced seen as Stand 8 is now the only wide-bodied marked stand we have at LBA.
The markings for wide-bodied aircraft parking across stand 14/15 has now been removed.
Well I guess it's only the last third of the air bridge that will need replacing so the cost shouldn't be as high as purchasing a completely new air bridge. I've often thought they would be better moving the two air bridges onto the new terminal extension. Once the grass islands are filled in as part of the ramp expansion it will make wide-bodied access easier on that part of the ramp.
 
Just a random observation but I think this is good to put into context LBA's winter program.. looking at EMA departures yesterday they had 2 Jet2 flights according to FR24 and their website, looking at it today, they have 12, LBA nearly has triple that. Ryanair operating considerably more today and tomorrow here then EMA. (obviously EMA has many cargo movements)

very interesting, could LBA catch EMA up once the terminal extension opens?

Also strengthens the argument what on earth can DSA offer in winter?
 
Just a random observation but I think this is good to put into context LBA's winter program.. looking at EMA departures yesterday they had 2 Jet2 flights according to FR24 and their website, looking at it today, they have 12, LBA nearly has triple that. Ryanair operating considerably more today and tomorrow here then EMA. (obviously EMA has many cargo movements)

very interesting, could LBA catch EMA up once the terminal extension opens?

Also strengthens the argument what on earth can DSA offer in winter?
Florida, Caribbean, Mexico, Gambia, Cape Verde. All destinations that could be served from Leeds but aren't.
 

Remove Advertisements

Subscribe to help support your favourite forum and in return we'll remove all our advertisements. Your contribution will help to pay for things like site maintenance, domain name renewals and annual server charges.



Forums4aiports
Subscribe

Heads Up!

For some weird reason, my days off work tend to involve being out of my flat by 5am and not getting back until 10pm. Back to work and the regular "fix" of 7.40am to 7.15pm hours
Heatwave Mk2 next week?
Some explosive weather build-ups currently in the North of England. What is it like where you are?
LBA: B737-300 G-GDFK empty down to Paris at 16:15 to operate the return LS268 back to Leeds 20:00 ETA where it will then operate the delayed LS265 to Malaga 20:40ETD
LBA: Albastar B737-800 EC-MUB positioning in tommorow afternoon from Gatwick 15:45 to operate a charter to Lourdes/Tarbes on Friday afternoon 14:00 AP7721 STC
I don't believe I am quite covering enough roles at work. Its now 4 on a bad day, 5 on a good day and there is scope for a 6th and 7th role. Still on minimum pay but had the biggest payrise in the company,

Trending Hashtags

Advertisement

Back
Top Bottom
  AdBlock Detected
Sure, ad-blocking software does a great job at blocking ads, but it also blocks some useful and important features of our website. For the best possible site experience please take a moment to disable your AdBlocker.