Re: Infrastructure Developments
[textarea]
Leeds Bradford International airport has made a double announcement of a £28 million development plus a new deal to be a base for airline Ryanair.
The airport will almost double in size after being given planning permission for an extra terminal and a two-storey extension for a new airside departure lounge.
Ryanair will be one of the main airlines using the facilities after company boss Michael O’Leary announced the new deal, which will create 1,000 jobs in Yorkshire.
A Ryanair spokesman described how the new development at the airport is necessary and he thinks it will be a great benefit to both the airport and the low-cost airline.
He said: “I think unlike Terminal 5 and these ridiculously expensive facilities that they love building at the London airport this is a sensible facility.
“We are very confident it will be a relatively seamless launch of the new terminal and our new flights.”
Source[/textarea]
So clearly the terminal development was at the heart of the decision made by Ryanair to open a new base at the airport.
Years ago prior to the start-up of Jet2, I predicted on the Dried Plum forum that Leeds would be a gold mine for a low cost airline base and along came Jet2. I have accurately predicted that Doncaster would not be the runaway success that Peel claimed it would be. I have accurately predicted that the claw back of passengers lost to Manchester airport would continue and this is still happening. I will predict that this will continue. Whilst I'm no Mystic Meg, and I can't predict how successful Jet2 will be alongside Ryanair, I will say that I am convinced that there are enough passengers in this region for the two airlines to coexist successfully.
The commencement of Ryanair services will inevitably bring forward the requirement of CAT II on runway 14, the parallel taxiway and the proposed new fuel farm. To the best of my knowledge, the plans for a CAT II system on runway 14 have been approved by the CAA and are awaiting installation. Hopefully this will get the green light as soon as possible. Roll on 4.5m passengers and lets see what phase 2 of the development work will bring.