All very low key for the best part of £100m spend. I was hoping we would see more renders, especially of the arrival hall.
Follow along with the video below to see how to install our site as a web app on your home screen.
Note: This feature may not be available in some browsers.
Patience!All very low key for the best part of £100m spend. I was hoping we would see more renders, especially of the arrival hall.
There are some images of the arrivals hall in the interactive PDF on the website.All very low key for the best part of £100m spend. I was hoping we would see more renders, especially of the arrival hall.
Probably one that’s next to a cycle lane as am sure they won’t have a noisy car, but I would join you in a pint or 2 watching them with there boxes of KleenexI'd love to know which pub Galba meet in...Be worth a couple of pints to watch those NIMBYs crying into theirs tonight
Will the extension allow for 6.8m, or do they have to get new permission as GALBA suggest?As per the X25
Re-planning of the Passenger Search Area, and modelling to demonstrate capacity to manage 6.8 MPPA in line with the DfT 2024 compliance requirements.
Yes it does and no they dont need planning consent unless they need to build something else or make changes that need planning consent. They need to do neither to reconfigure the existing terminal inside and once that's done, the capacity is 6.8m.Will the extension allow for 6.8m, or do they have to get new permission as GALBA suggest?
They are referring to the planning consent which as I recall said that LBA must seek planning approval as necessary if further works are required (above and beyond the extension) that require planning approval. They dont need to. The passenger throughput at LBA is not limited by any planning consent .The replies to every YEP article on Facebook-- on every topic are full of the dregs... It seems each poster seems to think we live under communism and the council builds and pays for everything. Usually they think that the money should be used to build homes for the homeless...
What are GALBA referring to then?! They must have something in mind...?
The same question was brought up during the planning process for the now cancelled terminal. The council officer said the airport was not subject to any limit in passengers and the only limit that existed was the physical limit of the terminal building. The same applies to the current building and the extended one.They are referring to the planning consent which as I recall said that LBA must seek planning approval as necessary if further works are required (above and beyond the extension) that require planning approval. They dont need to. The passenger throughput at LBA is not limited by any planning consent .
The exact wording in the S106 legal agreement isSection 4.1/5 of the CITY PLANS PANEL COMMITTEE REPORT 06/12/18 states
"Within 12 months off annual passengers exceeding 4.5mppa a new planning application to be submitted with to facilitate passenger throughput to 5mppa"
However it's not entirely clear from the wording if that applied to the old/precious application.
So leaving the terminal development for the new thread. With regards to passenger growth and potential infrastructure changes necessary to facilitate that growth, how do you interpret the planning document? More specifically, what changes or information do you think that means?The exact wording in the S106 legal agreement is
No later than 12 months of the annual passenger throughput at the airport exceeding 4.5m, LBA shall submit a planning application together with full supporting information including a transport assessment, draft travel plan and heads of terms for a planning obligation for such further development at the airport requiring express planning permission as would be necessary to facilitate an annual passenger throughout in excess of 5m.
So it's a Section 106 requiring a planning submission forThe exact wording in the S106 legal agreement is
No later than 12 months of the annual passenger throughput at the airport exceeding 4.5m, LBA shall submit a planning application together with full supporting information including a transport assessment, draft travel plan and heads of terms for a planning obligation for such further development at the airport requiring express planning permission as would be necessary to facilitate an annual passenger throughout in excess of 5m.
Subscribe to help support your favourite forum and in return we'll remove all our advertisements. Your contribution will help to pay for things like site maintenance, domain name renewals and annual server charges.