Very uplifting report WH. Thank you so much for your efforts. Was there any information on the additional stands positioning?
No, but they are shown in the airport development plan. Pretty much a case of where there's grass now, there could be concrete later, along the old runway 28/current apron. Obviously, the required distance has to be maintained from the runway so mainly at the Eastern end of the apron up to the terminal.
 
Although I have provided full detail in the Consultative Committee thread, it's worth posting here as well (given its been a long time coming) that the terminal development is due to commence in site in September. Funding is secured for the 1000 sq ft extension, the complete reconfiguration if the existing terminal and the construction of additional aircraft stands as and when they are needed. (Up to 10 additional stands with 35 in total).

The contractor is to be appointed in August. Tenders are due back 7th July.

It feels to me like the bells should be ringing in celebration,.although so far the response has been somewhat muted on here!
Really exciting times, its made my day reading your report wh, thankyou. Everything i was hoping for both with the terminal and apron expansion is going to happen, im like a kid with sweets!
 
Although extremely disappointing at the time the decision to pull the plans for a completely new terminal was the correct one, enabling plan B to go ahead quickly at an ambitious airport that is obviously now going places. Much better than getting bogged down in a time consuming and costly Judicial Review with an uncertain outcome. The protest groups have been outmanoeuvred!
 
to be honest I think the location of the new terminal and size/look did look amazing it would of been fantastic for that new development to go ahead. but agreed with Len above. get it built. Hopefully the new extension can again be extended if needed. I do hope the atheistic look of the outside is improved of the original building and does match the new extension.
 
The Leeds threads have been a bit quite today, so me being a bit sad and bored I thought I would try to envisage what 100,000 square feet equates to in real terms. So I wanted something to compare against that was local to the airport and would give a sense of scale. The extension will be similar in size (4/5th) of the Westside retail park in Guiseley. So if you think of all those stores empty and then replaced with carrousels, gates seating etc, it will be a massive space for the airport to enhance and expand facilities 👍
 
The Leeds threads have been a bit quite today, so me being a bit sad and bored I thought I would try to envisage what 100,000 square feet equates to in real terms. So I wanted something to compare against that was local to the airport and would give a sense of scale. The extension will be similar in size (4/5th) of the Westside retail park in Guiseley. So if you think of all those stores empty and then replaced with carrousels, gates seating etc, it will be a massive space for the airport to enhance and expand facilities 👍
The actual size of each floor will be more like 300ft x 112ft give or take with the basement floor not used for passengers so a very tight squeeze for 5+1 carrousels!

As you used Westside retail park as an example, think the old running track opposite the retail park. That's just about spot on for each floor level.
 
Ha, I know it’s 3 floors and no I didn’t mean the car park as well, I’m bored and sad, but far from stupid 🤪it’s still indicative of available space and it worked for me to put things in perspective, but if it’s vague as for others, by all means ignore. I thought I’d use it as a conversation starter as things seemed a bit Pete Tong today…..
 
I suppose that a fair indicator of the length of the extension is the fact that 150 metres of the external walkway is to be removed. Only the part beyond the extension, down to the Eastern end, will remain.

The actual size of each floor will be more like 300ft x 112ft give or take with the basement floor not used for passengers so a very tight squeeze for 5+1 carrousels!

As you used Westside retail park as an example, think the old running track opposite the retail park. That's just about spot on for each floor level.
One of the carousels is located remotely from the other four, around a corner, and the domestic one is seperate again.
 
I suppose that a fair indicator of the length of the extension is the fact that 150 metres of the external walkway is to be removed. Only the part beyond the extension, down to the Eastern end, will remain.


One of the carousels is located remotely from the other four, around a corner, and the domestic one is seperate again.
If it helps, the existing walkway is 275m in length.
 
If this were the Daily Mail we’d the using the London Bus measurement scale. It’s their favourite especially when giving the size of asteroids passing close to earth. I suggest we adopt it when trying to visualise the size of the extension!
 
The Leeds threads have been a bit quite today, so me being a bit sad and bored I thought I would try to envisage what 100,000 square feet equates to in real terms. So I wanted something to compare against that was local to the airport and would give a sense of scale. The extension will be similar in size (4/5th) of the Westside retail park in Guiseley. So if you think of all those stores empty and then replaced with carrousels, gates seating etc, it will be a massive space for the airport to enhance and expand facilities 👍
4/5th the size of westside retail park? Are you 100% sure( sorry to question) and are we talking about the whole L shape the retail park is? If so though yes its a massive space/size!

The actual size of each floor will be more like 300ft x 112ft give or take with the basement floor not used for passengers so a very tight squeeze for 5+1 carrousels!

As you used Westside retail park as an example, think the old running track opposite the retail park. That's just about spot on for each floor level.
My static caravan is 35ft in length so imagine 8.5statics in a row and 10 side by side so yes pretty big haha
 
Last edited:

Remove Advertisements

Subscribe to help support your favourite forum and in return we'll remove all our advertisements. Your contribution will help to pay for things like site maintenance, domain name renewals and annual server charges.



Forums4aiports
Subscribe

Heads Up!

For some weird reason, my days off work tend to involve being out of my flat by 5am and not getting back until 10pm. Back to work and the regular "fix" of 7.40am to 7.15pm hours
Heatwave Mk2 next week?
Some explosive weather build-ups currently in the North of England. What is it like where you are?
LBA: B737-300 G-GDFK empty down to Paris at 16:15 to operate the return LS268 back to Leeds 20:00 ETA where it will then operate the delayed LS265 to Malaga 20:40ETD
LBA: Albastar B737-800 EC-MUB positioning in tommorow afternoon from Gatwick 15:45 to operate a charter to Lourdes/Tarbes on Friday afternoon 14:00 AP7721 STC
I don't believe I am quite covering enough roles at work. Its now 4 on a bad day, 5 on a good day and there is scope for a 6th and 7th role. Still on minimum pay but had the biggest payrise in the company,