Thats surprising, they've kept saying September havent they? Doesnt give much time to get anything substantial done over the Winter. Lets hope it doesnt slip any further.Latest estimate is for work to commence in November.
Follow along with the video below to see how to install our site as a web app on your home screen.
Note: This feature may not be available in some browsers.
Thats surprising, they've kept saying September havent they? Doesnt give much time to get anything substantial done over the Winter. Lets hope it doesnt slip any further.Latest estimate is for work to commence in November.
It's a complex scheme. It's highly likely that the contractors have been interviewed at length before appointment and once they were, the programme of works they put forward will have been discussed to death and no doubt amended. It's one if those projects that simply has to go well and spending more time planning can save time later.Various actions have been taken ready for it to start such as cordoning off a section of the car park and diverting underground cables. I don't know whether the start waiting on planning aspects or contractor's.
I assume the car park area that has long been blocked off with boards will be used for all the contractors.
Possibly November 2033! HahaLatest estimate is for work to commence in November.
Oh ye of little faith! 🙂Possibly November 2033! Haha
As per the X25Did we ever get clarity on what level of annual passenger numbers this extension will allow for?
Do you have a link?Very interesting video posted to Social media just now, stating upgrades.. hopefully some big news coming soon.
It's on Facebook if you have it.Do you have a link?
This is the heavily revised and updated extension, (phase 1) plus the complete reconfiguration and updating of the existing terminal (phase 2) plus additional aircraft stands (phase 3).I thought it was 150Million?
| Charles Johnson |
| Head of Planning Development |
Watched it. Good to see the escalator is featured in the video. Good to see work starts 'this Autumn' , however the airport have interpretted that!😁
The illustration looks slightly different to things I've seen before (a bit less ugly?).
They're accurate. The extension is BIG!Very impressive. I wonder how accurate these renders will be as there seems to be a great deal of space which, the pessimist in me, wonders how accurate they are. Sorry for that but I hope I am wrong. If true (fingers crossed) then all the disruption will be worth it eventually. Well done to the LBA team therefore in that case. Good signage will be essential.